REMOVING CONC (RIPRAP)
|
SY
|
49.000
|
$100.000
|
$50.000
|
$150.000
|
$200.000
|
$275.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
12.000
|
$100.000
|
$90.000
|
$1,000.000
|
$540.000
|
$550.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9.000
|
$30.000
|
$450.000
|
$290.000
|
$210.000
|
$550.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
158.000
|
$60.000
|
$100.000
|
$120.000
|
$110.000
|
$55.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
200.000
|
$60.000
|
$30.000
|
$120.000
|
$110.000
|
$55.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
5,573.000
|
$1.000
|
$1.000
|
$1.000
|
$0.350
|
$5.500
|
|
|
FERTILIZER
|
TON
|
0.350
|
$1,500.000
|
$1,000.000
|
$3,000.000
|
$1,355.000
|
$2,200.000
|
|
|
VEGETATIVE WATERING
|
MG
|
112.000
|
$40.000
|
$100.000
|
$59.000
|
$100.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
|
SY
|
40.000
|
$200.000
|
$200.000
|
$322.000
|
$1,020.000
|
$165.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
96.000
|
$400.000
|
$250.000
|
$273.000
|
$610.000
|
$330.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
170.000
|
$50.000
|
$100.000
|
$169.000
|
$470.000
|
$220.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
319.000
|
$50.000
|
$30.000
|
$45.000
|
$50.000
|
$44.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
963.000
|
$325.000
|
$229.000
|
$350.000
|
$260.000
|
$154.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$850.000
|
$800.000
|
$1,405.000
|
$1,630.000
|
$192.500
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
512.000
|
$200.000
|
$220.000
|
$235.000
|
$295.000
|
$192.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
111.000
|
$850.000
|
$550.000
|
$710.000
|
$1,200.000
|
$550.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
826.000
|
$50.000
|
$55.000
|
$31.000
|
$50.000
|
$82.500
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
568.000
|
$45.000
|
$44.000
|
$48.000
|
$46.000
|
$82.500
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
234.000
|
$75.000
|
$50.000
|
$200.000
|
$107.000
|
$550.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM I-A)
|
LS
|
1.000
|
$300,000.000
|
$347,908.000
|
$280,000.000
|
$338,000.000
|
$440,000.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
217.000
|
$250.000
|
$267.000
|
$275.000
|
$325.000
|
$275.000
|
|
|
GABIONS (GALV)
|
CY
|
213.000
|
$400.000
|
$200.000
|
$335.000
|
$310.000
|
$330.000
|
|
|
SHOT BLASTING
|
SY
|
234.000
|
$7.000
|
$10.000
|
$15.000
|
$70.000
|
$38.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$165,000.000
|
$200,000.000
|
$210,000.000
|
$214,000.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$10,000.000
|
$2,343.000
|
$21,250.000
|
$5,800.000
|
$5,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
672.000
|
$30.000
|
$35.000
|
$40.000
|
$50.000
|
$82.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
672.000
|
$8.000
|
$10.000
|
$20.000
|
$22.000
|
$27.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,708.000
|
$5.000
|
$5.000
|
$4.000
|
$7.000
|
$16.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,708.000
|
$1.000
|
$2.000
|
$1.000
|
$1.150
|
$5.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$5,000.000
|
$6,000.000
|
$2,500.000
|
$10,000.000
|
$5,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
510.000
|
$70.000
|
$90.000
|
$175.000
|
$90.000
|
$165.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$10.000
|
$15.000
|
$10.000
|
$18.000
|
$55.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$18.000
|
$20.000
|
$25.000
|
$90.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,225.000
|
$30.000
|
$38.000
|
$23.750
|
$27.000
|
$38.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,500.000
|
$3,076.000
|
$1,840.000
|
$2,350.000
|
$2,420.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,800.000
|
$6,383.000
|
$1,245.000
|
$1,500.000
|
$1,320.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
650.000
|
$7.000
|
$16.000
|
$3.000
|
$3.000
|
$5.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,500.000
|
$4,702.000
|
$2,945.000
|
$3,400.000
|
$4,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$4,579.000
|
$335.000
|
$290.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$8,528.000
|
$1,395.000
|
$3,500.000
|
$5,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,400.000
|
$7,313.000
|
$670.000
|
$3,000.000
|
$550.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$40,847.000
|
$8,090.000
|
$9,000.000
|
$38,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
3.000
|
$40.000
|
$2,885.000
|
$20.000
|
$25.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$35.000
|
$2,173.000
|
$21.000
|
$30.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
3.000
|
$35.000
|
$2,885.000
|
$20.000
|
$25.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
3.000
|
$45.000
|
$2,893.000
|
$30.000
|
$26.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
$45.000
|
$328.000
|
$32.000
|
$30.000
|
$11.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
3.000
|
$50.000
|
$2,890.000
|
$32.000
|
$30.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
576.000
|
$5.000
|
$18.000
|
$3.000
|
$7.000
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,951.000
|
$3.000
|
$4.000
|
$1.550
|
$2.300
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$15.000
|
$371.000
|
$12.500
|
$11.500
|
$5.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
11,506.000
|
$1.500
|
$3.000
|
$1.550
|
$2.100
|
$5.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
508.000
|
$2.000
|
$5.000
|
$0.920
|
$4.000
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
134.000
|
$7.000
|
$76.000
|
$10.000
|
$11.500
|
$11.000
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
1.000
|
$100.000
|
$1,200.000
|
$675.000
|
$550.000
|
$1,100.000
|
|
|
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
|
LF
|
110.000
|
$15.000
|
$36.000
|
$30.000
|
$20.000
|
$110.000
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
CYC
|
1.000
|
$4,000.000
|
$2,500.000
|
$2,050.000
|
$3,000.000
|
$11,000.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.500
|
$10,000.000
|
$48,600.000
|
$79,250.000
|
$55,000.000
|
$27,500.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM) (LABOR)
|
LF
|
10.000
|
$15.000
|
$200.000
|
$120.000
|
$70.000
|
$44.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
7.000
|
$100.000
|
$148.000
|
$115.000
|
$100.000
|
$82.500
|
|
|
BRIDGE JOINT REPAIR (HEADER)
|
LF
|
4.000
|
$300.000
|
$948.000
|
$755.000
|
$1,300.000
|
$5.500
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
79.000
|
$175.000
|
$156.000
|
$128.000
|
$70.000
|
$275.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
70.000
|
$120.000
|
$100.000
|
$82.000
|
$118.000
|
$165.000
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
2,633.000
|
$2.000
|
$3.000
|
$3.330
|
$2.300
|
$5.500
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
5,155.000
|
$2.000
|
$3.000
|
$3.330
|
$2.300
|
$5.500
|
|
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
|
LF
|
1,371.000
|
$1.000
|
$3.000
|
$3.330
|
$2.300
|
$5.500
|
|
|
TMA (STATIONARY)
|
DAY
|
170.000
|
$300.000
|
$50.000
|
$340.000
|
$300.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$350.000
|
$250.000
|
$855.000
|
$1,000.000
|
$1,100.000
|
|
Totals: |
$1,789,643.000
|
$1,888,555.000
|
$2,097,277.930
|
$2,150,639.600
|
$2,352,223.500
|