|
|
PREPARING ROW
|
STA
|
65.000
|
$2,000.000
|
$550.000
|
$3,900.000
|
$1,600.000
|
$585.000
|
$1,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
90.000
|
$12.500
|
$21.500
|
$165.000
|
$25.000
|
$71.000
|
$50.000
|
|
|
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,124.000
|
$20.000
|
$13.200
|
$20.000
|
$20.000
|
$9.480
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
19,045.350
|
$17.000
|
$18.600
|
$19.000
|
$42.750
|
$14.950
|
$25.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
2,085.650
|
$22.000
|
$21.500
|
$30.000
|
$30.700
|
$5.000
|
$25.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
STA
|
203.530
|
$225.000
|
$98.000
|
$280.000
|
$300.000
|
$134.000
|
$250.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
24,974.000
|
$0.420
|
$0.220
|
$0.300
|
$0.300
|
$0.240
|
$0.250
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
12,487.000
|
$0.280
|
$0.140
|
$0.280
|
$0.280
|
$0.230
|
$0.150
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
12,487.000
|
$0.280
|
$0.170
|
$0.280
|
$0.280
|
$0.230
|
$0.200
|
|
|
VEGETATIVE WATERING
|
TGL
|
500.000
|
$35.000
|
$66.000
|
$30.000
|
$10.000
|
$37.700
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
|
SY
|
67,599.000
|
$23.000
|
$19.800
|
$23.000
|
$21.200
|
$21.330
|
$25.000
|
|
|
REWORK BS MTL (TY B)(6")(ORD COMP)
|
SY
|
53,715.000
|
$3.750
|
$2.050
|
$3.300
|
$7.500
|
$1.460
|
$3.500
|
|
|
CEMENT
|
TON
|
1,076.000
|
$250.000
|
$260.000
|
$235.000
|
$260.000
|
$243.000
|
$300.000
|
|
|
CEMENT TRT (EXIST MATL)(10")
|
SY
|
76,631.000
|
$4.250
|
$2.650
|
$1.500
|
$3.300
|
$1.520
|
$3.500
|
|
|
ASPH (AC-20XP)
|
GAL
|
48,173.000
|
$5.500
|
$3.900
|
$4.800
|
$4.600
|
$3.750
|
$4.500
|
|
|
ASPH (RC-250)
|
GAL
|
16,900.000
|
$6.500
|
$4.000
|
$5.300
|
$7.150
|
$5.000
|
$5.000
|
|
|
AGGR (TY-PB OR PL, GR-4)(SAC-A)
|
CY
|
1,071.000
|
$179.000
|
$180.000
|
$208.000
|
$175.000
|
$176.490
|
$170.000
|
|
|
AGGR (TY-B OR L, GR-5)
|
CY
|
501.000
|
$165.000
|
$154.750
|
$202.000
|
$133.000
|
$189.640
|
$140.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
76.000
|
$150.000
|
$181.650
|
$370.000
|
$280.000
|
$281.000
|
$300.000
|
|
|
TACK COAT
|
GAL
|
69.000
|
$5.000
|
$8.000
|
$32.000
|
$15.000
|
$5.000
|
$10.000
|
|
|
CUT & RESTORING PAV
|
SY
|
186.000
|
$175.000
|
$29.850
|
$100.000
|
$165.000
|
$33.190
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
112.000
|
$225.000
|
$100.200
|
$280.000
|
$1,000.000
|
$195.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
224.000
|
$25.000
|
$2.000
|
$3.000
|
$9.000
|
$48.000
|
$20.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
216.000
|
$200.000
|
$361.400
|
$132.000
|
$306.000
|
$132.000
|
$250.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
432.000
|
$354.000
|
$516.000
|
$420.000
|
$436.000
|
$517.190
|
$450.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
264.000
|
$431.000
|
$564.200
|
$535.000
|
$477.000
|
$629.000
|
$650.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
48.200
|
$1,630.000
|
$2,423.750
|
$4,400.000
|
$2,047.000
|
$8,482.000
|
$5,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
58.500
|
$1,505.000
|
$2,246.400
|
$3,600.000
|
$1,900.000
|
$7,242.000
|
$5,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
19.200
|
$1,724.630
|
$2,246.400
|
$2,600.000
|
$1,900.000
|
$3,217.000
|
$5,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,120.000
|
$28.230
|
$48.750
|
$65.000
|
$42.000
|
$146.700
|
$150.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
54.600
|
$777.830
|
$925.550
|
$830.000
|
$790.000
|
$1,245.000
|
$2,500.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,011.000
|
$298.240
|
$230.450
|
$623.000
|
$195.000
|
$449.450
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
36.000
|
$650.000
|
$455.000
|
$850.000
|
$800.000
|
$1,285.000
|
$850.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
15.500
|
$225.000
|
$325.000
|
$202.000
|
$1,200.000
|
$438.000
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
369.000
|
$203.500
|
$160.000
|
$202.000
|
$375.000
|
$261.000
|
$300.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
372.000
|
$170.000
|
$172.800
|
$240.000
|
$146.000
|
$263.000
|
$300.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
71.000
|
$500.000
|
$940.300
|
$360.000
|
$327.000
|
$400.000
|
$350.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
325.000
|
$150.000
|
$129.100
|
$216.000
|
$102.000
|
$129.000
|
$120.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
58.000
|
$210.000
|
$182.100
|
$235.000
|
$135.000
|
$140.000
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
46.000
|
$300.000
|
$262.200
|
$310.000
|
$220.000
|
$182.000
|
$220.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
46.000
|
$325.000
|
$273.400
|
$360.000
|
$315.000
|
$214.000
|
$250.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
2.000
|
$4,750.000
|
$5,725.000
|
$15,000.000
|
$3,450.000
|
$11,650.000
|
$8,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,347.850
|
$1,590.000
|
$2,100.000
|
$1,950.000
|
$1,100.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$1,100.000
|
$2,300.000
|
$2,255.000
|
$1,360.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,500.000
|
$1,990.000
|
$2,500.000
|
$2,315.000
|
$1,430.000
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,376.370
|
$2,300.000
|
$2,500.000
|
$2,458.000
|
$1,300.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$2,400.000
|
$3,100.000
|
$3,653.000
|
$1,800.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,200.000
|
$2,650.000
|
$3,100.000
|
$3,789.000
|
$1,800.000
|
$2,400.000
|
|
|
SET (TY II) (42 IN) (TP) (3: 1) (C)
|
EA
|
2.000
|
$4,750.000
|
$6,510.000
|
$5,200.000
|
$4,978.000
|
$2,500.000
|
$5,200.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,500.000
|
$2,000.000
|
$3,000.000
|
$2,750.000
|
$4,100.000
|
$1,500.000
|
|
|
DIAMOND GRINDING SLAB (ABC)
|
SY
|
642.000
|
$14.000
|
$18.800
|
$12.000
|
$40.000
|
$17.250
|
$30.000
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$1,000.000
|
$792.000
|
$400.000
|
$650.000
|
$500.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
401.000
|
$50.000
|
$177.000
|
$35.000
|
$25.000
|
$34.000
|
$20.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$49,825.000
|
$55,000.000
|
$255,000.000
|
$53,400.000
|
$147,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$620,000.000
|
$737,120.000
|
$528,000.000
|
$750,000.000
|
$811,000.000
|
$880,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$6,500.000
|
$3,500.000
|
$7,000.000
|
$18,500.000
|
$50,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
280.000
|
$230.000
|
$68.000
|
$140.000
|
$65.000
|
$120.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$17,373.000
|
$5,000.000
|
$20,000.000
|
$21,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
174.000
|
$250.000
|
$248.100
|
$280.000
|
$210.000
|
$500.000
|
$375.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$200.000
|
$580.000
|
$280.000
|
$210.000
|
$900.000
|
$750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
580.000
|
$40.000
|
$43.600
|
$36.000
|
$36.000
|
$56.450
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
580.000
|
$12.000
|
$14.500
|
$12.000
|
$12.000
|
$25.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,940.000
|
$4.410
|
$4.250
|
$3.500
|
$3.500
|
$6.400
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,940.000
|
$1.220
|
$1.200
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
437.000
|
$85.000
|
$39.050
|
$115.000
|
$145.000
|
$58.000
|
$65.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
534.000
|
$50.000
|
$13.000
|
$51.000
|
$120.000
|
$48.000
|
$45.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
16.000
|
$77.000
|
$73.650
|
$51.000
|
$500.000
|
$180.000
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$27.500
|
$29.050
|
$25.000
|
$31.000
|
$26.700
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,450.000
|
$2,408.000
|
$2,800.000
|
$2,020.000
|
$3,120.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$4.500
|
$3.000
|
$2.000
|
$11.000
|
$2.200
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,460.000
|
$3,631.000
|
$3,300.000
|
$3,125.000
|
$3,550.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$400.000
|
$303.000
|
$200.000
|
$300.000
|
$230.000
|
$350.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$400.000
|
$91.250
|
$350.000
|
$300.000
|
$400.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$415.000
|
$411.500
|
$430.000
|
$350.000
|
$470.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
46.000
|
$800.000
|
$750.350
|
$530.000
|
$700.000
|
$583.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$900.000
|
$895.600
|
$620.000
|
$750.000
|
$683.000
|
$750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
40.000
|
$120.000
|
$109.000
|
$100.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$40.000
|
$27.000
|
$25.000
|
$28.000
|
$28.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$40.130
|
$29.000
|
$35.000
|
$32.000
|
$39.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF
|
EA
|
18.000
|
$120.000
|
$91.000
|
$150.000
|
$90.000
|
$160.000
|
$150.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$55.000
|
$22.000
|
$25.000
|
$15.000
|
$28.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
40,706.000
|
$0.350
|
$0.500
|
$0.250
|
$0.320
|
$0.280
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
4,450.000
|
$0.700
|
$0.500
|
$0.330
|
$0.340
|
$0.370
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
11,944.000
|
$0.350
|
$0.500
|
$0.330
|
$0.320
|
$0.370
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,070.000
|
$0.800
|
$1.000
|
$1.500
|
$1.000
|
$2.000
|
$1.500
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
40,706.000
|
$0.350
|
$0.500
|
$0.330
|
$0.340
|
$0.370
|
$0.400
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
4,450.000
|
$0.500
|
$0.500
|
$0.330
|
$0.360
|
$0.370
|
$0.400
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
11,944.000
|
$0.350
|
$0.400
|
$0.330
|
$0.340
|
$0.370
|
$0.400
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
40,706.000
|
$2.770
|
$0.900
|
$0.650
|
$0.660
|
$0.720
|
$0.900
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
4,450.000
|
$2.430
|
$0.950
|
$0.650
|
$0.680
|
$0.720
|
$0.750
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
11,944.000
|
$2.430
|
$0.950
|
$0.650
|
$0.660
|
$0.720
|
$0.750
|
|
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
|
LF
|
4,071.000
|
$4.210
|
$5.750
|
$4.400
|
$4.500
|
$4.900
|
$6.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
33.000
|
$30.000
|
$18.150
|
$25.000
|
$33.000
|
$28.000
|
$35.000
|
|
PRFB RUMBLE STRIP (BLK)(1')(EDGELINE)
|
LF
|
8,142.000
|
$0.230
|
$5.750
|
$4.300
|
$4.300
|
$4.780
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
392.000
|
$7.500
|
$7.250
|
$5.000
|
$5.500
|
$5.600
|
$7.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
800.000
|
$0.100
|
$1.200
|
$1.200
|
$1.000
|
$1.300
|
$1.500
|
|
|
ULTRA-HIGH PERFORMANCE CONCRETE
|
CY
|
16.800
|
$10,000.000
|
$10,660.000
|
$1,850.000
|
$9,000.000
|
$3,500.000
|
$5,000.000
|
|
Totals: |
$6,658,922.504
|
$6,280,470.585
|
$7,073,471.390
|
$7,523,365.988
|
$7,776,380.412
|
$8,887,998.550
|