REMOVING CONC (PAV)
|
SY
|
97.000
|
$45.000
|
$40.000
|
$60.000
|
$46.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
171.000
|
$28.000
|
$45.000
|
$16.000
|
$21.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
454.000
|
$34.000
|
$50.000
|
$14.000
|
$25.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
152.000
|
$40.000
|
$40.000
|
$46.600
|
$33.000
|
|
|
REMOVING CONC (GND BOX W/ APRON)
|
EA
|
5.000
|
$825.000
|
$1,000.000
|
$740.000
|
$130.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
734.000
|
$55.000
|
$55.000
|
$40.000
|
$46.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
150.000
|
$75.000
|
$60.000
|
$201.000
|
$59.000
|
|
|
BLOCK SODDING
|
SY
|
458.000
|
$15.000
|
$14.000
|
$22.200
|
$13.000
|
|
|
VEGETATIVE WATERING
|
MG
|
12.000
|
$100.000
|
$400.000
|
$190.000
|
$185.000
|
|
|
PROOF ROLLING
|
HR
|
2.000
|
$120.000
|
$250.000
|
$164.000
|
$5,000.000
|
|
|
HMCL ACP TY-B SAC-B AC-1.5
|
TON
|
20.000
|
$565.000
|
$330.000
|
$489.000
|
$1,100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
760.000
|
$150.000
|
$155.000
|
$164.000
|
$265.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
1,054.000
|
$10.000
|
$11.000
|
$8.900
|
$6.500
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
1,695.000
|
$9.000
|
$15.000
|
$8.700
|
$5.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
15.000
|
$360.000
|
$330.000
|
$634.000
|
$411.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
62.000
|
$185.000
|
$200.000
|
$300.000
|
$171.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
42.000
|
$190.000
|
$180.000
|
$300.000
|
$169.000
|
|
|
INLET (COMPL)(TY C)
|
EA
|
2.000
|
$7,200.000
|
$9,000.000
|
$15,000.000
|
$8,500.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$6,000.000
|
$6,000.000
|
$2,470.000
|
$4,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$75,000.000
|
$84,000.000
|
$82,000.000
|
$165,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$16,000.000
|
$18,000.000
|
$8,000.000
|
$21,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
10.000
|
$45.000
|
$40.000
|
$14.800
|
$33.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
486.000
|
$6.500
|
$7.000
|
$7.400
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
486.000
|
$2.000
|
$1.500
|
$1.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
60.000
|
$22.000
|
$20.000
|
$14.800
|
$9.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
60.000
|
$3.000
|
$1.500
|
$1.500
|
$3.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
547.000
|
$75.000
|
$75.000
|
$91.600
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
117.000
|
$180.000
|
$170.000
|
$218.000
|
$142.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
146.000
|
$130.000
|
$121.000
|
$164.000
|
$101.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
31.000
|
$150.000
|
$137.500
|
$294.000
|
$145.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$2,800.000
|
$4,000.000
|
$5,930.000
|
$3,250.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$3,650.000
|
$4,000.000
|
$5,810.000
|
$3,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$1,050.000
|
$985.000
|
$2,960.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,800.000
|
$1,650.000
|
$2,960.000
|
$1,315.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$300.000
|
$275.000
|
$296.000
|
$190.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$35.000
|
$39.010
|
$51.800
|
$37.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$460.000
|
$529.450
|
$703.000
|
$490.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
2.000
|
$610.000
|
$668.780
|
$888.000
|
$625.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
280.000
|
$1.200
|
$1.390
|
$1.850
|
$1.550
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
25.000
|
$7.250
|
$6.690
|
$8.900
|
$6.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
100.000
|
$3.500
|
$4.460
|
$5.900
|
$4.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
500.000
|
$1.200
|
$1.390
|
$1.850
|
$1.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
200.000
|
$3.250
|
$3.000
|
$3.100
|
$6.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
100.000
|
$3.250
|
$3.000
|
$3.100
|
$3.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
78.000
|
$7.500
|
$6.690
|
$8.900
|
$6.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
890.000
|
$3.500
|
$3.340
|
$4.450
|
$3.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
176.000
|
$12.000
|
$11.150
|
$14.800
|
$12.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
14.000
|
$240.000
|
$278.660
|
$370.000
|
$275.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
10.000
|
$300.000
|
$306.520
|
$407.000
|
$290.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
80.000
|
$1.500
|
$1.110
|
$1.500
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
640.000
|
$1.500
|
$1.110
|
$1.500
|
$1.250
|
|
REFL PAV MRKR TY I-C
|
EA
|
58.000
|
$8.500
|
$11.150
|
$14.800
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$8.500
|
$11.150
|
$14.800
|
$11.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,435.000
|
$1.000
|
$1.110
|
$1.500
|
$1.550
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
160.000
|
$15.000
|
$1.670
|
$2.200
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
190.000
|
$10.000
|
$7.800
|
$10.400
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$110.000
|
$167.190
|
$222.000
|
$169.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$110.000
|
$167.200
|
$222.000
|
$171.000
|
|
|
REMOVE PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,600.000
|
$3,000.000
|
$1,480.000
|
$790.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
443.000
|
$235.000
|
$220.000
|
$318.000
|
$295.000
|
|
|
TACK COAT
|
GAL
|
130.000
|
$7.000
|
$5.500
|
$25.200
|
$4.500
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
459.000
|
$285.000
|
$282.000
|
$340.000
|
$295.000
|
|
|
TACK COAT
|
GAL
|
60.000
|
$7.000
|
$5.500
|
$26.600
|
$4.200
|
|
|
BONDING COURSE
|
GAL
|
372.000
|
$7.000
|
$5.500
|
$44.400
|
$4.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$120.000
|
$150.000
|
$128.000
|
$85.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$300.000
|
$350.000
|
$220.000
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$500.000
|
$350.000
|
$885.000
|
$100.000
|
|
Totals: |
$820,043.250
|
$854,513.150
|
$960,908.000
|
$1,003,477.600
|