|
|
|
PREPARING ROW
|
STA
|
5.000
|
$4,500.000
|
$5,000.000
|
$25,000.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,070.000
|
$22.000
|
$45.000
|
$20.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
450.000
|
$20.000
|
$40.000
|
$35.000
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
1.200
|
$500.000
|
$1,700.000
|
$2,500.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
AC
|
0.600
|
$500.000
|
$3,400.000
|
$2,500.000
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
AC
|
0.600
|
$500.000
|
$3,400.000
|
$2,500.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
522.000
|
$25.000
|
$20.000
|
$50.000
|
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$70.000
|
$80.000
|
$150.000
|
|
|
|
ASPH (CRS-2)
|
GAL
|
8,153.000
|
$5.000
|
$2.500
|
$6.500
|
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
200.000
|
$170.000
|
$80.000
|
$300.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,595.000
|
$100.000
|
$100.000
|
$110.000
|
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
109.000
|
$240.000
|
$120.000
|
$125.000
|
|
|
|
PFC-C (AGGREGATE) (PG76 MIX) SAC-B
|
TON
|
1,698.000
|
$105.000
|
$120.000
|
$135.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,666.000
|
$40.000
|
$35.000
|
$55.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
6,800.000
|
$2.000
|
$1.750
|
$6.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
11,111.000
|
$2.500
|
$3.000
|
$6.000
|
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
66.000
|
$520.000
|
$650.000
|
$550.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$500.000
|
$700.000
|
$550.000
|
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
28.000
|
$250.000
|
$300.000
|
$185.000
|
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
6.000
|
$400.000
|
$500.000
|
$300.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$90,000.000
|
$175,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
2.000
|
$5,000.000
|
$30,000.000
|
$25,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
15.000
|
$40.000
|
$60.000
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
15.000
|
$20.000
|
$20.000
|
$15.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$4.000
|
$5.500
|
$4.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.500
|
$1.000
|
$2.000
|
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
170.000
|
$40.000
|
$8.000
|
$42.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
10,100.000
|
$1.000
|
$0.350
|
$0.750
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
10,100.000
|
$1.000
|
$0.450
|
$0.750
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,087.500
|
$25.000
|
$21.000
|
$25.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,300.000
|
$2,750.000
|
$2,850.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$300.000
|
$225.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$900.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
11.000
|
$500.000
|
$850.000
|
$650.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$560.000
|
$850.000
|
$650.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$110.000
|
$110.000
|
$50.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
856.000
|
$1.500
|
$1.000
|
$5.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,040.000
|
$1.000
|
$1.500
|
$6.000
|
|
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$125.000
|
$130.000
|
$250.000
|
|
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$140.000
|
$190.000
|
$250.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,700.000
|
$0.500
|
$0.400
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
20,200.000
|
$0.400
|
$0.400
|
$0.500
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
31.000
|
$5.500
|
$5.000
|
$15.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,010.000
|
$4.000
|
$5.000
|
$15.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$125.000
|
$155.000
|
$150.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$300.000
|
$775.000
|
$550.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$30.000
|
$80.000
|
$150.000
|
|
1
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
1,698.000
|
$105.000
|
$0.000
|
$0.000
|
|
Totals: |
$1,289,834.500
|
$1,175,289.000
|
$1,585,913.000
|