PREPARING ROW
|
STA
|
13.790
|
$4,000.000
|
$910.000
|
$500.000
|
$4,000.000
|
$4,400.000
|
$4,058.000
|
$3,700.000
|
$4,500.000
|
$27,000.000
|
$9,852.440
|
|
|
RMV (14") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,089.000
|
$20.000
|
$14.000
|
$12.000
|
$20.000
|
$20.000
|
$6.580
|
$28.000
|
$20.000
|
$19.700
|
$9.760
|
|
|
EXCAV (ROADWAY)
|
CY
|
846.000
|
$21.000
|
$43.000
|
$35.000
|
$20.000
|
$57.000
|
$12.950
|
$42.000
|
$30.000
|
$31.510
|
$20.270
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
1,295.000
|
$32.000
|
$23.000
|
$45.000
|
$25.000
|
$26.000
|
$12.600
|
$35.000
|
$30.000
|
$40.700
|
$27.920
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
4,221.000
|
$4.000
|
$3.000
|
$5.000
|
$2.500
|
$8.000
|
$1.270
|
$2.300
|
$4.000
|
$6.890
|
$2.200
|
|
|
HYDRO MULCH SEED (PERM_RURAL_SANDY)
|
SY
|
4,221.000
|
$2.000
|
$0.750
|
$0.930
|
$0.830
|
$0.800
|
$0.570
|
$0.820
|
$1.500
|
$1.310
|
$1.410
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
2,111.000
|
$2.000
|
$0.500
|
$0.930
|
$1.000
|
$0.800
|
$0.460
|
$0.700
|
$1.000
|
$1.310
|
$1.500
|
|
|
HYDRO MULCH SEED (TEMP_COOL)
|
SY
|
2,111.000
|
$2.000
|
$0.750
|
$0.930
|
$1.000
|
$0.800
|
$0.610
|
$0.700
|
$1.000
|
$1.310
|
$1.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
42.200
|
$67.000
|
$32.000
|
$70.000
|
$1.000
|
$250.000
|
$47.500
|
$55.000
|
$1.000
|
$164.130
|
$10.590
|
|
|
SOIL RET BLKT(SL_MOD_SAND_LONG)
|
SY
|
284.000
|
$3.000
|
$1.750
|
$4.350
|
$6.700
|
$4.000
|
$1.530
|
$4.000
|
$8.000
|
$6.570
|
$18.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
|
SY
|
3,036.000
|
$20.000
|
$36.000
|
$32.000
|
$30.000
|
$18.000
|
$21.500
|
$32.000
|
$45.000
|
$39.740
|
$37.540
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
21.000
|
$350.000
|
$410.000
|
$445.000
|
$370.000
|
$345.000
|
$348.000
|
$382.000
|
$400.000
|
$459.550
|
$608.770
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
1,583.000
|
$7.000
|
$14.000
|
$8.000
|
$10.000
|
$6.000
|
$8.950
|
$12.500
|
$20.000
|
$6.890
|
$8.310
|
|
|
CEMENT
|
TON
|
15.000
|
$300.000
|
$260.000
|
$235.000
|
$300.000
|
$300.000
|
$288.000
|
$242.000
|
$400.000
|
$459.550
|
$395.000
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
1,583.000
|
$6.000
|
$7.000
|
$5.000
|
$10.000
|
$12.000
|
$4.250
|
$6.000
|
$20.000
|
$6.890
|
$3.280
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
586.000
|
$13.000
|
$9.250
|
$8.600
|
$8.000
|
$11.000
|
$9.950
|
$10.000
|
$15.000
|
$13.130
|
$8.640
|
|
|
ASPH (AC-20XP)
|
GAL
|
1,615.000
|
$3.500
|
$8.250
|
$4.000
|
$8.000
|
$17.000
|
$6.200
|
$3.750
|
$15.000
|
$10.500
|
$8.190
|
|
|
AGGR (TY-PB OR PL, GR-4)(SAC-A)
|
CY
|
32.000
|
$550.000
|
$740.000
|
$995.000
|
$850.000
|
$500.000
|
$272.000
|
$485.000
|
$800.000
|
$984.750
|
$274.290
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
322.000
|
$200.000
|
$180.000
|
$150.000
|
$200.000
|
$230.000
|
$207.000
|
$188.000
|
$250.000
|
$242.910
|
$347.970
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
380.000
|
$215.000
|
$190.000
|
$180.000
|
$200.000
|
$210.000
|
$208.000
|
$197.000
|
$250.000
|
$256.040
|
$270.000
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
29.000
|
$200.000
|
$180.000
|
$140.000
|
$230.000
|
$210.000
|
$399.000
|
$235.000
|
$250.000
|
$269.170
|
$272.270
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
558.000
|
$10.000
|
$15.000
|
$25.000
|
$4.000
|
$16.000
|
$7.700
|
$9.000
|
$30.000
|
$6.570
|
$2.830
|
|
|
CEM STABIL BKFL
|
CY
|
211.000
|
$274.000
|
$130.000
|
$180.000
|
$200.000
|
$130.000
|
$99.400
|
$145.000
|
$300.000
|
$98.480
|
$280.050
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
34.000
|
$30.000
|
$1.500
|
$50.000
|
$100.000
|
$5.000
|
$625.000
|
$80.000
|
$10.000
|
$26.260
|
$13.970
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,611.000
|
$30.000
|
$36.000
|
$15.000
|
$28.000
|
$45.000
|
$65.000
|
$62.000
|
$20.000
|
$26.260
|
$41.970
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
420.000
|
$230.000
|
$142.000
|
$250.000
|
$246.650
|
$235.000
|
$233.250
|
$270.000
|
$170.000
|
$462.830
|
$458.840
|
|
|
CL C CONC (ABUT)
|
CY
|
27.300
|
$1,350.000
|
$1,500.000
|
$1,000.000
|
$1,400.000
|
$1,800.000
|
$1,897.000
|
$1,975.000
|
$2,000.000
|
$2,921.430
|
$2,407.900
|
|
|
REINF CONC SLAB
|
SF
|
2,118.000
|
$30.000
|
$23.000
|
$28.000
|
$27.000
|
$34.000
|
$45.300
|
$49.000
|
$30.000
|
$36.760
|
$42.730
|
|
|
APPROACH SLAB
|
CY
|
65.000
|
$785.000
|
$1,000.000
|
$850.000
|
$725.000
|
$1,500.000
|
$882.900
|
$715.000
|
$900.000
|
$1,253.920
|
$1,179.680
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
396.000
|
$225.000
|
$250.000
|
$250.000
|
$285.520
|
$230.000
|
$224.450
|
$235.000
|
$305.000
|
$321.030
|
$431.640
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
99.000
|
$300.000
|
$250.000
|
$350.000
|
$348.880
|
$290.000
|
$296.000
|
$290.000
|
$305.000
|
$321.030
|
$475.600
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
75.000
|
$700.000
|
$600.000
|
$650.000
|
$725.000
|
$565.000
|
$950.000
|
$964.000
|
$800.000
|
$771.390
|
$1,112.650
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,287.000
|
$167.000
|
$170.000
|
$175.000
|
$180.000
|
$240.000
|
$180.000
|
$170.000
|
$200.000
|
$216.150
|
$348.160
|
|
|
RAIL (TY T223)
|
LF
|
361.000
|
$150.000
|
$160.000
|
$185.000
|
$165.000
|
$140.000
|
$237.000
|
$180.000
|
$160.000
|
$231.420
|
$167.440
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
84.000
|
$150.000
|
$99.000
|
$215.000
|
$145.000
|
$69.000
|
$101.000
|
$141.000
|
$200.000
|
$177.260
|
$198.280
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
128.000
|
$1,400.000
|
$1,500.000
|
$1,520.000
|
$1,650.000
|
$1,300.000
|
$2,000.000
|
$1,896.000
|
$2,000.000
|
$2,571.870
|
$2,779.780
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
83.000
|
$100.000
|
$62.000
|
$90.000
|
$60.000
|
$115.000
|
$97.000
|
$97.000
|
$80.000
|
$140.570
|
$140.790
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
1.000
|
$24,000.000
|
$96,000.000
|
$105,000.000
|
$80,000.000
|
$115,000.000
|
$77,575.000
|
$119,000.000
|
$90,000.000
|
$115,544.000
|
$141,000.000
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
1.000
|
$44,000.000
|
$110,000.000
|
$110,000.000
|
$90,000.000
|
$140,000.000
|
$84,580.000
|
$132,000.000
|
$100,000.000
|
$121,452.500
|
$198,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,750.000
|
$1,300.000
|
$1,250.000
|
$1,000.000
|
$1,400.000
|
$1,410.000
|
$2,075.000
|
$2,500.000
|
$2,691.650
|
$2,023.610
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,500.000
|
$9,500.000
|
$2,600.000
|
$3,500.000
|
$2,300.000
|
$7,850.000
|
$4,276.000
|
$10,000.000
|
$17,069.000
|
$2,445.810
|
|
|
REMOV STR (PIPE)
|
LF
|
55.000
|
$39.000
|
$28.000
|
$22.000
|
$20.000
|
$41.000
|
$24.000
|
$56.000
|
$45.000
|
$34.140
|
$25.510
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
96.000
|
$500.000
|
$290.000
|
$125.000
|
$225.000
|
$95.000
|
$523.000
|
$267.000
|
$750.000
|
$607.260
|
$143.640
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$25,000.000
|
$20,000.000
|
$25,000.000
|
$50,000.000
|
$40,000.000
|
$14,400.000
|
$35,000.000
|
$30,000.000
|
$54,817.750
|
$50,477.920
|
|
|
REMOVING ROCK RIPRAP
|
LF
|
46.000
|
$55.000
|
$27.000
|
$65.000
|
$100.000
|
$24.000
|
$92.400
|
$140.000
|
$32.000
|
$20.350
|
$200.210
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$239,500.000
|
$180,000.000
|
$185,000.000
|
$250,592.350
|
$150,000.000
|
$249,600.000
|
$317,400.000
|
$235,000.000
|
$325,000.000
|
$555,595.750
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$6,800.000
|
$2,600.000
|
$1,500.000
|
$3,000.000
|
$1,100.000
|
$5,236.000
|
$750.000
|
$11,000.000
|
$4,267.250
|
$23,643.570
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$2,100.000
|
$7,500.000
|
$20,000.000
|
$20,000.000
|
$13,000.000
|
$3,545.000
|
$22,000.000
|
$26,260.000
|
$22,121.610
|
|
|
TMA (STATIONARY)
|
DAY
|
18.000
|
$290.000
|
$260.000
|
$65.000
|
$250.000
|
$225.000
|
$500.000
|
$335.000
|
$300.000
|
$984.750
|
$397.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$500.000
|
$710.000
|
$65.000
|
$1.000
|
$350.000
|
$900.000
|
$335.000
|
$300.000
|
$984.750
|
$345.160
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
132.000
|
$50.000
|
$50.000
|
$50.000
|
$40.000
|
$45.000
|
$41.390
|
$49.000
|
$1.000
|
$65.650
|
$67.950
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
132.000
|
$19.000
|
$16.000
|
$10.000
|
$10.000
|
$16.000
|
$13.450
|
$11.000
|
$1.000
|
$26.260
|
$21.910
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
600.000
|
$36.000
|
$36.000
|
$50.000
|
$40.000
|
$70.000
|
$29.670
|
$38.000
|
$1.000
|
$39.390
|
$40.160
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
600.000
|
$13.000
|
$12.000
|
$10.000
|
$10.000
|
$15.000
|
$10.000
|
$13.000
|
$1.000
|
$13.130
|
$15.080
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,572.000
|
$4.750
|
$4.500
|
$5.000
|
$4.000
|
$5.500
|
$3.790
|
$3.800
|
$1.000
|
$6.570
|
$6.910
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,572.000
|
$1.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$2.630
|
$1.870
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
7.000
|
$5,000.000
|
$5,500.000
|
$6,150.000
|
$6,000.000
|
$3,300.000
|
$1,090.000
|
$4,430.000
|
$5,000.000
|
$9,847.500
|
$8,791.730
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
540.000
|
$77.000
|
$64.000
|
$110.000
|
$70.000
|
$75.000
|
$28.000
|
$21.000
|
$120.000
|
$105.700
|
$91.880
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
270.000
|
$65.000
|
$13.000
|
$35.000
|
$20.000
|
$3.000
|
$11.000
|
$17.000
|
$30.000
|
$13.790
|
$11.580
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
540.000
|
$35.000
|
$13.000
|
$45.000
|
$25.000
|
$5.000
|
$28.000
|
$20.000
|
$90.000
|
$20.350
|
$42.780
|
|
|
DRIVEWAYS (ACP)
|
SY
|
262.000
|
$78.000
|
$45.000
|
$110.000
|
$65.000
|
$99.000
|
$58.500
|
$64.000
|
$100.000
|
$65.650
|
$94.040
|
|
|
TURNOUTS (ACP)
|
SY
|
41.000
|
$100.000
|
$47.000
|
$120.000
|
$100.000
|
$99.000
|
$73.700
|
$87.000
|
$100.000
|
$65.650
|
$196.550
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
775.000
|
$27.000
|
$31.000
|
$28.000
|
$26.000
|
$24.000
|
$25.000
|
$26.000
|
$25.000
|
$32.170
|
$46.310
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,000.000
|
$2,400.000
|
$2,300.000
|
$2,000.000
|
$1,800.000
|
$2,535.000
|
$2,776.000
|
$1,600.000
|
$2,698.220
|
$3,325.560
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$285.000
|
$780.000
|
$1,800.000
|
$1,250.000
|
$2,700.000
|
$1,576.000
|
$1,765.000
|
$1,300.000
|
$2,133.630
|
$2,880.380
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,600.000
|
$1,800.000
|
$1,500.000
|
$2,500.000
|
$1,630.000
|
$1,775.000
|
$1,300.000
|
$2,146.760
|
$2,382.620
|
|
|
MTL W-BEAM GD FEN (SPECIAL)
|
LF
|
80.000
|
$75.000
|
$31.000
|
$47.000
|
$38.000
|
$34.000
|
$41.300
|
$46.000
|
$40.000
|
$55.800
|
$180.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
162.500
|
$4.500
|
$4.000
|
$3.000
|
$3.000
|
$2.550
|
$3.000
|
$3.250
|
$2.000
|
$3.940
|
$2.300
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$450.000
|
$260.000
|
$310.000
|
$300.000
|
$170.000
|
$300.000
|
$163.000
|
$500.000
|
$196.950
|
$502.190
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$330.000
|
$185.000
|
$300.000
|
$225.000
|
$163.000
|
$217.000
|
$500.000
|
$262.600
|
$491.510
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,200.000
|
$3,800.000
|
$3,750.000
|
$3,000.000
|
$3,300.000
|
$3,260.000
|
$3,353.000
|
$2,900.000
|
$4,050.610
|
$5,627.050
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$300.000
|
$330.000
|
$350.000
|
$275.000
|
$225.000
|
$300.000
|
$217.000
|
$500.000
|
$262.600
|
$314.550
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,700.000
|
$1,600.000
|
$2,130.000
|
$1,750.000
|
$1,700.000
|
$1,630.000
|
$1,910.000
|
$2,500.000
|
$2,100.800
|
$2,955.780
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$1,150.000
|
$1,000.000
|
$500.000
|
$490.000
|
$1,128.000
|
$1,000.000
|
$1,116.050
|
$1,753.180
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,250.000
|
$7,900.000
|
$9,400.000
|
$8,500.000
|
$6,500.000
|
$9,510.000
|
$1,910.000
|
$9,000.000
|
$9,893.460
|
$15,524.060
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
2.000
|
$305.000
|
$420.000
|
$500.000
|
$400.000
|
$77.000
|
$353.250
|
$342.000
|
$200.000
|
$413.600
|
$405.830
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$750.000
|
$920.000
|
$720.000
|
$800.000
|
$430.000
|
$631.000
|
$668.000
|
$950.000
|
$807.500
|
$1,384.850
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$700.000
|
$790.000
|
$420.000
|
$800.000
|
$115.000
|
$368.000
|
$598.000
|
$600.000
|
$722.150
|
$1,148.140
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$115.000
|
$160.000
|
$118.000
|
$150.000
|
$130.000
|
$100.000
|
$107.000
|
$150.000
|
$177.260
|
$178.920
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$59.000
|
$35.000
|
$30.000
|
$22.000
|
$24.000
|
$27.000
|
$40.000
|
$32.830
|
$50.390
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
23.000
|
$30.000
|
$59.000
|
$35.000
|
$30.000
|
$28.000
|
$38.000
|
$39.000
|
$30.000
|
$46.610
|
$32.370
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
240.000
|
$6.000
|
$5.250
|
$4.970
|
$4.000
|
$4.500
|
$4.350
|
$4.350
|
$4.000
|
$6.570
|
$6.770
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
3,384.000
|
$1.000
|
$1.000
|
$1.060
|
$1.000
|
$1.150
|
$0.920
|
$1.100
|
$1.000
|
$1.310
|
$1.270
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$18.000
|
$10.000
|
$9.940
|
$10.000
|
$11.000
|
$8.700
|
$11.000
|
$14.000
|
$6.570
|
$19.710
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
9,600.000
|
$1.500
|
$1.000
|
$1.060
|
$1.000
|
$1.150
|
$0.920
|
$1.100
|
$1.000
|
$1.310
|
$1.190
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
425.000
|
$1.000
|
$0.750
|
$1.550
|
$1.000
|
$1.150
|
$2.000
|
$1.100
|
$5.000
|
$6.570
|
$0.570
|
|
RE PROFILE PM TY I(W)6"(SLD)(090MIL)
|
LF
|
3,170.000
|
$3.000
|
$1.750
|
$1.680
|
$1.000
|
$1.150
|
$1.470
|
$1.100
|
$1.000
|
$2.630
|
$1.010
|
|
RE PROFILE PM TY I(Y)6"(SLD)(090MIL)
|
LF
|
9,902.000
|
$1.900
|
$1.750
|
$1.680
|
$1.000
|
$1.150
|
$1.470
|
$1.100
|
$1.500
|
$2.630
|
$1.050
|
|
RE PROFILE PM TY I(Y)6"(BRK)(090MIL)
|
LF
|
570.000
|
$2.250
|
$1.750
|
$1.680
|
$1.250
|
$1.500
|
$1.470
|
$1.350
|
$1.500
|
$2.630
|
$1.070
|
|
|
PAVEMENT SLER 6"
|
LF
|
420.000
|
$3.150
|
$1.250
|
$1.240
|
$0.550
|
$0.650
|
$1.090
|
$0.600
|
$0.500
|
$2.630
|
$0.390
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
10.000
|
$35.000
|
$39.000
|
$37.600
|
$12.000
|
$14.000
|
$33.000
|
$13.000
|
$20.000
|
$26.260
|
$21.620
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
155.000
|
$7.000
|
$6.750
|
$6.530
|
$4.500
|
$5.000
|
$5.700
|
$4.900
|
$5.000
|
$19.700
|
$6.340
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
500.000
|
$0.250
|
$1.250
|
$1.240
|
$0.950
|
$1.150
|
$1.090
|
$1.000
|
$1.000
|
$1.310
|
$0.330
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
420.000
|
$0.750
|
$0.250
|
$0.310
|
$0.650
|
$0.800
|
$0.270
|
$0.700
|
$0.700
|
$1.310
|
$0.630
|
|
|
BONDING COURSE
|
GAL
|
707.000
|
$8.000
|
$8.250
|
$6.000
|
$6.000
|
$8.000
|
$5.000
|
$4.550
|
$8.000
|
$65.650
|
$6.870
|
|
Totals: |
$2,394,608.450
|
$2,315,333.300
|
$2,373,773.350
|
$2,508,181.820
|
$2,594,066.925
|
$2,612,038.450
|
$2,782,467.845
|
$2,948,269.700
|
$3,748,865.195
|
$4,259,517.046
|