|
|
|
PREPARING ROW
|
STA
|
77.560
|
$310.000
|
$443.000
|
$500.000
|
$150.000
|
$230.000
|
$423.650
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
77.560
|
$235.000
|
$430.000
|
$300.000
|
$285.000
|
$280.000
|
$726.600
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
127.000
|
$6.000
|
$29.000
|
$30.000
|
$23.000
|
$35.000
|
$16.980
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
783.000
|
$10.000
|
$26.500
|
$12.000
|
$23.000
|
$20.000
|
$22.830
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
17,234.000
|
$0.500
|
$0.350
|
$1.000
|
$0.750
|
$0.500
|
$3.160
|
|
|
|
BLOCK SODDING
|
SY
|
164.000
|
$5.000
|
$4.500
|
$4.500
|
$4.000
|
$5.000
|
$5.560
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
17,234.000
|
$0.130
|
$0.160
|
$0.160
|
$0.140
|
$0.100
|
$0.190
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
8,617.000
|
$0.130
|
$0.110
|
$0.120
|
$0.100
|
$0.100
|
$0.120
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
8,617.000
|
$0.130
|
$0.110
|
$0.120
|
$0.100
|
$0.100
|
$0.110
|
|
|
|
VEGETATIVE WATERING
|
MG
|
172.300
|
$20.000
|
$18.000
|
$10.000
|
$15.000
|
$21.000
|
$35.020
|
|
|
|
FLBS (CMP IN PLC)(TY D GR 1-2 OR 5)(8")
|
SY
|
24,318.000
|
$13.000
|
$14.500
|
$15.000
|
$22.000
|
$20.000
|
$16.460
|
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
20,827.000
|
$3.500
|
$0.430
|
$2.250
|
$1.000
|
$1.000
|
$2.060
|
|
|
|
CEMENT
|
TON
|
442.000
|
$148.000
|
$158.000
|
$150.000
|
$150.000
|
$150.000
|
$169.470
|
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(8")
|
SY
|
29,456.000
|
$1.300
|
$1.820
|
$2.250
|
$1.500
|
$2.000
|
$2.330
|
|
|
|
ASPH (RC-250)
|
GAL
|
7,364.000
|
$3.600
|
$3.530
|
$3.250
|
$4.700
|
$4.000
|
$4.970
|
|
|
|
ASPH (SPG 67-19)
|
GAL
|
18,456.000
|
$3.200
|
$3.350
|
$3.500
|
$3.400
|
$3.000
|
$3.630
|
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
218.000
|
$148.000
|
$221.000
|
$90.000
|
$112.000
|
$140.000
|
$141.580
|
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
388.000
|
$131.000
|
$263.500
|
$125.000
|
$146.000
|
$179.000
|
$150.250
|
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
260.000
|
$160.000
|
$94.500
|
$100.000
|
$130.000
|
$120.000
|
$163.890
|
|
|
|
CEM STABIL BKFL
|
CY
|
114.800
|
$143.000
|
$49.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CUT & RESTORING PAV
|
SY
|
102.000
|
$172.000
|
$37.000
|
$100.000
|
$150.000
|
$50.000
|
$92.170
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
177.000
|
$3.000
|
$19.000
|
$6.000
|
$15.000
|
$20.000
|
$16.430
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.400
|
$450.000
|
$690.000
|
$500.000
|
$650.000
|
$850.000
|
$1,178.410
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
52.300
|
$100.000
|
$188.000
|
$120.000
|
$220.000
|
$180.000
|
$302.930
|
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
50.000
|
$300.000
|
$421.000
|
$500.000
|
$490.000
|
$800.000
|
$560.260
|
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
76.000
|
$550.000
|
$550.000
|
$570.000
|
$625.000
|
$700.000
|
$567.510
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
282.000
|
$58.000
|
$52.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
76.000
|
$100.000
|
$75.000
|
$72.000
|
$100.000
|
$100.000
|
$113.880
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
108.000
|
$120.000
|
$131.000
|
$170.000
|
$185.000
|
$180.000
|
$158.930
|
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$6,250.000
|
$11,600.000
|
$8,300.000
|
$5,000.000
|
$13,000.000
|
$13,929.980
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$13,600.000
|
$10,500.000
|
$8,500.000
|
$14,000.000
|
$9,086.290
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$850.000
|
$650.000
|
$975.000
|
$800.000
|
$1,600.000
|
$1,643.310
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,150.000
|
$1,050.000
|
$1,200.000
|
$900.000
|
$1,800.000
|
$2,049.560
|
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,900.000
|
$3,700.000
|
$3,100.000
|
$3,000.000
|
$6,200.000
|
$4,527.430
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$2,645.000
|
$3,500.000
|
$3,500.000
|
$5,200.000
|
$5,012.310
|
|
|
|
REMOV STR (PIPE)
|
EA
|
21.000
|
$800.000
|
$300.000
|
$350.000
|
$750.000
|
$200.000
|
$358.200
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$85,000.000
|
$65,150.000
|
$135,000.000
|
$65,000.000
|
$80,000.000
|
$260,069.760
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$1,500.000
|
$1,000.000
|
$5,000.000
|
$5,000.000
|
$9,300.000
|
$3,591.770
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
320.000
|
$27.000
|
$27.780
|
$30.000
|
$25.000
|
$28.000
|
$35.580
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
320.000
|
$9.500
|
$10.000
|
$4.000
|
$9.000
|
$10.000
|
$9.180
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
840.000
|
$4.250
|
$3.280
|
$3.000
|
$2.950
|
$3.000
|
$4.540
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
840.000
|
$1.000
|
$0.720
|
$0.500
|
$2.950
|
$1.000
|
$1.240
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
470.000
|
$4.800
|
$3.890
|
$5.500
|
$3.500
|
$4.000
|
$6.030
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
470.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$2.460
|
|
|
|
CONCRETE GUTTER (MODIFIED)
|
LF
|
150.000
|
$16.000
|
$61.000
|
$30.000
|
$50.000
|
$40.000
|
$44.680
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
63.000
|
$45.000
|
$93.800
|
$38.000
|
$55.000
|
$200.000
|
$88.300
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,412.000
|
$40.000
|
$45.500
|
$22.000
|
$25.400
|
$50.000
|
$39.550
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
168.000
|
$87.000
|
$119.000
|
$25.000
|
$44.000
|
$70.000
|
$66.870
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
9.000
|
$265.000
|
$265.500
|
$270.000
|
$240.000
|
$270.000
|
$276.370
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$320.000
|
$325.500
|
$425.000
|
$295.000
|
$320.000
|
$334.420
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$375.000
|
$516.600
|
$400.000
|
$465.000
|
$520.000
|
$530.150
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$400.000
|
$575.000
|
$425.000
|
$520.000
|
$580.000
|
$580.820
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$500.000
|
$872.200
|
$600.000
|
$785.000
|
$880.000
|
$875.620
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$75.000
|
$107.800
|
$60.000
|
$97.000
|
$110.000
|
$120.960
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$80.000
|
$83.000
|
$60.000
|
$75.000
|
$80.000
|
$97.650
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$10.500
|
$22.000
|
$15.000
|
$10.000
|
$80.000
|
$94.620
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
1,033.000
|
$0.500
|
$0.220
|
$0.300
|
$0.200
|
$0.200
|
$0.330
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
13,742.000
|
$0.180
|
$0.220
|
$0.300
|
$0.200
|
$0.200
|
$0.230
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
207.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.840
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
32.000
|
$15.000
|
$23.000
|
$22.000
|
$20.000
|
$22.000
|
$25.790
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
16,512.000
|
$0.600
|
$0.890
|
$1.000
|
$0.800
|
$1.000
|
$0.890
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
1,158.000
|
$0.650
|
$0.890
|
$1.000
|
$0.800
|
$1.000
|
$0.980
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
14,242.000
|
$0.600
|
$0.890
|
$1.000
|
$0.800
|
$1.000
|
$0.890
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
155.000
|
$4.250
|
$11.000
|
$12.000
|
$10.000
|
$11.000
|
$11.780
|
|
|
|
THERMOPLASTIC PIPE (SIZE)(PP)
|
LF
|
78.000
|
$5.200
|
$27.500
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$2,800.000
|
$2,800.000
|
$10,000.000
|
$1,000.000
|
$5,600.000
|
$10,506.000
|
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
133.000
|
$22.000
|
$16.670
|
$20.000
|
$15.000
|
$40.000
|
$17.410
|
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$1,500.000
|
$1,000.000
|
$10,000.000
|
$1,000.000
|
$11,000.000
|
$12,607.190
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$500.000
|
$415.000
|
$300.000
|
$100.000
|
$390.000
|
$726.200
|
|
1
|
|
CEM STABIL BKFL
|
CY
|
86.000
|
$143.000
|
$0.000
|
$160.000
|
$125.000
|
$170.000
|
$174.480
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
360.000
|
$58.000
|
$0.000
|
$60.000
|
$52.000
|
$80.000
|
$73.270
|
|
Totals: |
$1,258,828.850
|
$1,323,982.400
|
$1,387,063.770
|
$1,418,827.360
|
$1,594,814.700
|
$1,790,970.939
|