|
|
PREPARING ROW
|
STA
|
130.500
|
$1,750.000
|
$500.000
|
$310.670
|
$2,300.000
|
$900.000
|
$1,000.000
|
$3,150.000
|
$739.260
|
$1,200.000
|
$1,980.000
|
|
|
REMOVING STB BASE AND ASPH PAV(10-14")
|
SY
|
1,433.000
|
$14.050
|
$10.000
|
$9.500
|
$6.000
|
$7.500
|
$9.000
|
$20.000
|
$4.380
|
$5.000
|
$11.650
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
34,566.000
|
$15.000
|
$10.000
|
$9.520
|
$16.000
|
$13.000
|
$23.000
|
$20.000
|
$35.710
|
$23.000
|
$39.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,173.000
|
$15.500
|
$10.000
|
$4.470
|
$8.000
|
$4.500
|
$8.000
|
$28.000
|
$21.390
|
$15.000
|
$11.250
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
55,282.000
|
$1.200
|
$2.000
|
$2.160
|
$1.750
|
$2.500
|
$1.100
|
$1.700
|
$1.520
|
$2.250
|
$5.590
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
55,282.000
|
$0.250
|
$0.170
|
$0.120
|
$0.170
|
$0.280
|
$0.300
|
$0.240
|
$0.160
|
$0.180
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
1,105.640
|
$18.000
|
$12.000
|
$34.770
|
$12.000
|
$20.000
|
$35.000
|
$30.000
|
$16.650
|
$20.000
|
$25.900
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
5,533.330
|
$1.500
|
$1.500
|
$1.100
|
$1.250
|
$1.690
|
$1.650
|
$1.250
|
$1.200
|
$1.350
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
9,873.000
|
$42.500
|
$32.500
|
$40.540
|
$37.500
|
$36.000
|
$53.000
|
$40.000
|
$56.510
|
$46.000
|
$38.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
8,880.000
|
$3.650
|
$3.500
|
$3.530
|
$3.500
|
$4.050
|
$4.000
|
$3.650
|
$4.060
|
$3.500
|
$4.250
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
431.000
|
$105.000
|
$100.000
|
$145.990
|
$95.000
|
$108.840
|
$106.000
|
$99.000
|
$95.940
|
$110.000
|
$106.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
6,290.000
|
$105.000
|
$100.000
|
$127.810
|
$95.000
|
$108.840
|
$106.000
|
$99.000
|
$95.940
|
$110.000
|
$107.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
6,400.000
|
$52.000
|
$55.000
|
$43.450
|
$48.000
|
$57.890
|
$56.000
|
$52.000
|
$47.090
|
$65.000
|
$56.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
100.000
|
$6.000
|
$100.000
|
$53.550
|
$50.000
|
$30.000
|
$38.000
|
$105.000
|
$108.150
|
$115.000
|
$34.250
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
37.000
|
$760.000
|
$750.000
|
$548.360
|
$500.000
|
$1,200.000
|
$780.000
|
$685.000
|
$702.970
|
$750.000
|
$820.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
37.000
|
$970.000
|
$850.000
|
$615.930
|
$610.000
|
$1,400.000
|
$785.000
|
$790.000
|
$811.110
|
$865.000
|
$880.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
130.000
|
$77.000
|
$65.000
|
$52.610
|
$88.000
|
$80.000
|
$205.000
|
$58.000
|
$59.480
|
$63.000
|
$121.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$92.000
|
$100.000
|
$80.260
|
$93.000
|
$141.000
|
$340.000
|
$100.000
|
$103.820
|
$110.000
|
$143.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
36.000
|
$111.000
|
$150.000
|
$112.550
|
$126.000
|
$180.000
|
$265.000
|
$145.000
|
$151.410
|
$161.000
|
$173.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
32.000
|
$135.000
|
$200.000
|
$148.150
|
$160.000
|
$212.000
|
$310.000
|
$175.000
|
$181.690
|
$193.000
|
$213.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$12,500.000
|
$20,000.000
|
$16,032.150
|
$19,250.000
|
$35,000.000
|
$31,000.000
|
$16,350.000
|
$16,222.290
|
$17,250.000
|
$19,300.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$10,000.000
|
$27,500.000
|
$18,087.130
|
$27,000.000
|
$67,000.000
|
$41,000.000
|
$22,200.000
|
$22,711.210
|
$24,150.000
|
$26,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,250.000
|
$800.000
|
$1,077.640
|
$1,400.000
|
$1,850.000
|
$2,000.000
|
$900.000
|
$919.260
|
$975.000
|
$1,490.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,800.000
|
$1,000.000
|
$1,202.640
|
$1,500.000
|
$1,950.000
|
$2,200.000
|
$1,055.000
|
$1,081.490
|
$1,150.000
|
$2,190.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,750.000
|
$1,500.000
|
$1,515.140
|
$2,700.000
|
$2,800.000
|
$3,000.000
|
$2,600.000
|
$2,703.720
|
$2,875.000
|
$2,890.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$2,500.000
|
$2,923.760
|
$3,800.000
|
$4,800.000
|
$3,700.000
|
$3,600.000
|
$3,785.200
|
$3,900.000
|
$4,220.000
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$450.000
|
$500.000
|
$337.700
|
$300.000
|
$400.000
|
$595.000
|
$580.000
|
$594.820
|
$600.000
|
$270.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,250.000
|
$2,000.000
|
$2,062.030
|
$1,500.000
|
$1,200.000
|
$4,300.000
|
$1,580.000
|
$1,622.230
|
$1,600.000
|
$3,090.000
|
|
|
REMOV STR (PIPE)
|
LF
|
168.000
|
$17.500
|
$20.000
|
$18.090
|
$15.000
|
$28.000
|
$53.000
|
$26.000
|
$27.040
|
$28.000
|
$29.950
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$449,509.680
|
$400,000.000
|
$313,626.990
|
$465,000.000
|
$400,000.000
|
$350,000.000
|
$500,000.000
|
$545,000.000
|
$587,000.000
|
$433,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$2,500.000
|
$4,198.190
|
$4,600.000
|
$6,400.000
|
$1,500.000
|
$8,000.000
|
$4,900.000
|
$12,500.000
|
$13,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
590.000
|
$26.000
|
$25.000
|
$32.170
|
$32.000
|
$33.860
|
$33.000
|
$40.000
|
$30.480
|
$35.000
|
$31.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
590.000
|
$11.500
|
$7.000
|
$12.100
|
$11.400
|
$16.930
|
$16.500
|
$6.500
|
$11.360
|
$12.000
|
$11.650
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
100.000
|
$16.000
|
$25.000
|
$34.810
|
$34.000
|
$33.860
|
$33.000
|
$36.000
|
$32.210
|
$33.000
|
$33.050
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$12.000
|
$5.000
|
$12.280
|
$10.750
|
$16.930
|
$16.500
|
$13.000
|
$10.750
|
$11.000
|
$11.050
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,229.000
|
$2.500
|
$3.000
|
$2.380
|
$2.250
|
$4.510
|
$4.400
|
$3.500
|
$2.260
|
$3.000
|
$2.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,229.000
|
$0.750
|
$0.500
|
$0.680
|
$0.650
|
$1.690
|
$1.650
|
$0.650
|
$0.640
|
$0.750
|
$0.650
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,856.000
|
$55.000
|
$70.000
|
$59.700
|
$57.500
|
$54.420
|
$69.000
|
$62.000
|
$53.210
|
$75.000
|
$60.900
|
|
|
DRIVEWAYS (ACP)
|
SY
|
849.000
|
$37.500
|
$30.000
|
$44.000
|
$36.000
|
$63.680
|
$62.000
|
$75.000
|
$48.180
|
$40.000
|
$76.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$1.900
|
$5.000
|
$3.090
|
$4.000
|
$5.640
|
$5.500
|
$5.250
|
$5.000
|
$6.000
|
$5.150
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$195.000
|
$500.000
|
$301.160
|
$260.000
|
$282.150
|
$275.000
|
$260.000
|
$250.000
|
$450.000
|
$260.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
4.000
|
$176.000
|
$250.000
|
$204.180
|
$194.000
|
$203.150
|
$198.000
|
$190.000
|
$185.000
|
$215.000
|
$185.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$565.000
|
$450.000
|
$471.930
|
$463.000
|
$1,471.690
|
$717.000
|
$685.000
|
$440.000
|
$510.000
|
$670.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$560.000
|
$550.000
|
$527.580
|
$518.000
|
$894.980
|
$872.000
|
$830.000
|
$493.000
|
$570.000
|
$810.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$720.000
|
$750.000
|
$663.030
|
$654.000
|
$1,224.530
|
$1,200.000
|
$1,100.000
|
$622.000
|
$715.000
|
$1,110.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
13.000
|
$465.000
|
$275.000
|
$402.440
|
$395.000
|
$600.410
|
$585.000
|
$560.000
|
$376.000
|
$435.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$92.000
|
$100.000
|
$109.680
|
$13.000
|
$282.150
|
$275.000
|
$260.000
|
$95.000
|
$100.000
|
$260.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
5,872.000
|
$0.180
|
$0.300
|
$0.380
|
$0.370
|
$0.400
|
$0.300
|
$0.240
|
$0.230
|
$0.350
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
13,050.000
|
$0.200
|
$0.300
|
$0.380
|
$0.370
|
$0.400
|
$0.300
|
$0.240
|
$0.230
|
$0.350
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
208.000
|
$3.200
|
$3.000
|
$5.730
|
$5.250
|
$5.640
|
$3.300
|
$4.200
|
$4.000
|
$3.450
|
$4.100
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,306.000
|
$4.500
|
$3.000
|
$3.300
|
$3.150
|
$3.390
|
$2.750
|
$2.100
|
$2.000
|
$2.880
|
$2.050
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
1,306.000
|
$4.500
|
$3.000
|
$3.300
|
$3.150
|
$3.390
|
$2.750
|
$2.100
|
$2.000
|
$2.880
|
$2.050
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
230.000
|
$0.820
|
$1.500
|
$1.480
|
$1.050
|
$1.130
|
$1.550
|
$0.670
|
$0.650
|
$1.610
|
$0.650
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$150.000
|
$150.000
|
$184.550
|
$165.000
|
$180.580
|
$165.000
|
$165.000
|
$160.000
|
$170.000
|
$164.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$160.000
|
$150.000
|
$217.640
|
$165.000
|
$180.580
|
$165.000
|
$210.000
|
$200.000
|
$170.000
|
$205.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
500.000
|
$7.500
|
$6.000
|
$5.450
|
$5.250
|
$5.640
|
$6.600
|
$7.250
|
$7.000
|
$6.900
|
$7.200
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$700.000
|
$350.000
|
$623.500
|
$470.000
|
$507.870
|
$380.000
|
$525.000
|
$500.000
|
$375.000
|
$510.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
8,701.000
|
$0.500
|
$0.400
|
$0.330
|
$0.260
|
$0.340
|
$0.450
|
$0.400
|
$0.370
|
$0.450
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,667.000
|
$0.450
|
$0.400
|
$0.330
|
$0.260
|
$0.340
|
$0.450
|
$0.400
|
$0.370
|
$0.450
|
$0.400
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
24,337.000
|
$0.600
|
$0.700
|
$0.640
|
$0.580
|
$0.680
|
$0.750
|
$0.600
|
$0.590
|
$0.750
|
$0.600
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
26,148.000
|
$0.600
|
$0.700
|
$0.640
|
$0.580
|
$0.680
|
$0.750
|
$0.600
|
$0.590
|
$0.750
|
$0.600
|
|
REFL PAV MRKR TY I-C
|
EA
|
326.000
|
$3.250
|
$4.000
|
$6.600
|
$6.250
|
$6.770
|
$4.400
|
$5.250
|
$5.000
|
$4.500
|
$5.150
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
524.000
|
$3.550
|
$4.000
|
$4.910
|
$4.700
|
$5.080
|
$4.400
|
$5.250
|
$5.000
|
$4.500
|
$5.150
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,100.000
|
$0.360
|
$0.500
|
$0.320
|
$0.260
|
$0.340
|
$0.500
|
$0.500
|
$0.450
|
$0.500
|
$0.450
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
2.000
|
$3,000.000
|
$10,000.000
|
$9,759.280
|
$9,600.000
|
$3,385.790
|
$12,000.000
|
$9,500.000
|
$9,200.000
|
$12,000.000
|
$9,400.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
12,151.000
|
$70.000
|
$71.000
|
$65.050
|
$55.400
|
$71.790
|
$70.000
|
$65.000
|
$62.870
|
$75.000
|
$61.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
6,390.000
|
$95.000
|
$80.000
|
$83.570
|
$71.500
|
$89.160
|
$87.000
|
$81.250
|
$73.450
|
$85.000
|
$77.300
|
|
|
TACK COAT
|
GAL
|
3,413.000
|
$3.120
|
$3.000
|
$6.150
|
$2.600
|
$3.470
|
$3.400
|
$3.150
|
$3.170
|
$3.000
|
$3.800
|
|
|
UNDERSEAL COURSE
|
GAL
|
34,920.000
|
$3.300
|
$3.000
|
$3.690
|
$2.650
|
$2.890
|
$2.800
|
$2.600
|
$3.170
|
$3.000
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$7,000.000
|
$17,892.060
|
$9,500.000
|
$3,600.000
|
$6,100.000
|
$17,000.000
|
$7,562.680
|
$20,000.000
|
$10,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$150.000
|
$245.000
|
$271.360
|
$130.000
|
$190.000
|
$275.000
|
$400.000
|
$180.000
|
$250.000
|
$480.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$250.000
|
$300.000
|
$615.990
|
$130.000
|
$220.000
|
$440.000
|
$800.000
|
$180.000
|
$500.000
|
$480.000
|
|
Totals: |
$5,145,701.565
|
$4,562,496.915
|
$4,616,428.391
|
$4,692,426.302
|
$5,076,256.628
|
$5,449,619.694
|
$5,584,548.622
|
$5,645,200.362
|
$5,871,255.316
|
$6,195,250.376
|