PREPARING ROW
|
AC
|
8.100
|
$12,345.000
|
$1,000.000
|
$5,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5,478.000
|
$12.000
|
$20.000
|
$37.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,385.000
|
$13.000
|
$20.000
|
$11.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,279.000
|
$2.000
|
$10.000
|
$6.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
16,279.000
|
$0.600
|
$0.350
|
$0.600
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
8,140.000
|
$0.600
|
$0.150
|
$0.600
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
8,140.000
|
$0.600
|
$0.150
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
254.200
|
$35.000
|
$1.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
172.000
|
$2.000
|
$5.000
|
$9.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
4,650.000
|
$53.000
|
$90.000
|
$115.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
3,998.000
|
$6.500
|
$6.000
|
$6.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (6")
|
SY
|
45.000
|
$200.000
|
$120.000
|
$160.000
|
|
|
CEM STABIL BKFL
|
CY
|
107.000
|
$103.000
|
$160.000
|
$440.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
240.000
|
$25.470
|
$50.000
|
$32.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
16.000
|
$1,777.000
|
$800.000
|
$1,500.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
184.000
|
$154.000
|
$200.000
|
$210.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$10,586.000
|
$5,000.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$30,055.000
|
$18,000.000
|
$20,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$2,684.000
|
$1,800.000
|
$3,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,105.000
|
$1,800.000
|
$3,800.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$1,555.000
|
$1,000.000
|
$780.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,260.000
|
$1,000.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
34.000
|
$22.000
|
$100.000
|
$110.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$117,369.340
|
$140,000.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$3,000.000
|
$4,000.000
|
$800.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
80.000
|
$33.000
|
$100.000
|
$53.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$16.500
|
$10.000
|
$38.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$28.460
|
$10.000
|
$85.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$10.000
|
$1.000
|
$41.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,399.000
|
$5.100
|
$10.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,399.000
|
$2.520
|
$1.000
|
$2.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
37.000
|
$100.000
|
$100.000
|
$83.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
50.000
|
$674.000
|
$500.000
|
$960.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$655.000
|
$800.000
|
$680.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$655.000
|
$800.000
|
$860.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$80.000
|
$100.000
|
$76.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
755.000
|
$1.300
|
$3.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
305.000
|
$10.700
|
$20.000
|
$7.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
31.000
|
$177.000
|
$700.000
|
$230.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$211.000
|
$700.000
|
$275.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
42.000
|
$73.000
|
$50.000
|
$75.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
99.000
|
$4.100
|
$4.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
9,567.000
|
$0.530
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,347.000
|
$0.560
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
42.000
|
$4.500
|
$5.000
|
$10.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
361.000
|
$4.500
|
$5.000
|
$6.400
|
|
|
DECOMPOSED GRANITE
|
SY
|
269.000
|
$115.000
|
$80.000
|
$185.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
1,922.000
|
$130.000
|
$150.000
|
$168.000
|
|
|
AUTOMATIC SWING GATE (SINGLE)
|
EA
|
1.000
|
$7,500.000
|
$8,000.000
|
$12,500.000
|
|
|
AUTOMATIC SWING GATE (DOUBLE)
|
EA
|
1.000
|
$10,000.000
|
$15,000.000
|
$22,200.000
|
|
|
NATURAL STONE VENEER
|
SF
|
819.000
|
$120.000
|
$30.000
|
$93.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
240.000
|
$105.000
|
$100.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
63.000
|
$175.000
|
$500.000
|
$310.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$250.000
|
$500.000
|
$925.000
|
|
Totals: |
$1,363,562.770
|
$1,637,722.850
|
$2,015,791.300
|