|
|
PREPARING ROW
|
STA
|
244.300
|
$500.000
|
$250.000
|
$650.000
|
$520.000
|
$882.000
|
$1,000.000
|
$1,292.310
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
20,512.000
|
$10.000
|
$15.000
|
$25.000
|
$25.000
|
$15.840
|
$30.000
|
$31.890
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,208.000
|
$12.000
|
$15.000
|
$18.000
|
$10.000
|
$11.840
|
$23.750
|
$25.420
|
|
|
BLADING
|
HR
|
50.000
|
$115.000
|
$160.000
|
$100.000
|
$100.000
|
$104.520
|
$132.000
|
$71.830
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
88,278.000
|
$1.750
|
$1.000
|
$2.750
|
$1.510
|
$3.690
|
$2.500
|
$4.310
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
88,278.000
|
$0.200
|
$0.180
|
$0.140
|
$0.230
|
$0.180
|
$0.140
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
44,139.000
|
$0.130
|
$0.140
|
$0.090
|
$0.230
|
$0.140
|
$0.100
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
2,207.000
|
$22.000
|
$35.000
|
$25.000
|
$15.000
|
$27.500
|
$10.000
|
$19.840
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
88,278.000
|
$1.000
|
$1.400
|
$0.850
|
$1.390
|
$1.530
|
$0.900
|
$0.850
|
|
|
PROOF ROLLING
|
HR
|
50.000
|
$120.000
|
$75.000
|
$60.000
|
$95.000
|
$165.050
|
$200.000
|
$55.250
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
6,036.000
|
$42.000
|
$53.000
|
$52.500
|
$62.000
|
$59.970
|
$80.000
|
$71.940
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
4,343.000
|
$5.500
|
$5.000
|
$3.750
|
$4.500
|
$5.100
|
$5.500
|
$4.410
|
|
|
ASPH (TIER II)
|
GAL
|
41,260.000
|
$3.250
|
$4.500
|
$3.400
|
$3.500
|
$4.530
|
$4.000
|
$3.770
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
897.000
|
$100.000
|
$110.000
|
$81.000
|
$130.000
|
$113.320
|
$115.000
|
$90.940
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
578.000
|
$95.000
|
$165.000
|
$101.260
|
$115.000
|
$169.980
|
$125.000
|
$98.150
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,000.000
|
$45.000
|
$63.000
|
$38.910
|
$43.500
|
$62.330
|
$74.000
|
$54.600
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
4,611.000
|
$4.000
|
$2.000
|
$3.500
|
$3.000
|
$2.550
|
$5.500
|
$4.420
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
332.000
|
$435.000
|
$500.000
|
$450.000
|
$575.000
|
$430.620
|
$525.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
177.000
|
$475.000
|
$520.000
|
$390.000
|
$523.000
|
$441.950
|
$445.000
|
$550.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
106.000
|
$54.000
|
$115.000
|
$56.670
|
$69.750
|
$45.240
|
$64.000
|
$45.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
19.900
|
$70.000
|
$190.000
|
$168.800
|
$104.000
|
$83.490
|
$95.000
|
$90.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
12.600
|
$70.000
|
$280.000
|
$262.700
|
$146.000
|
$131.400
|
$133.000
|
$120.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
45.000
|
$59.000
|
$235.000
|
$82.350
|
$119.000
|
$94.160
|
$106.000
|
$80.000
|
|
|
CMP (GAL STL 96 IN)
|
LF
|
24.000
|
$150.000
|
$400.000
|
$375.000
|
$640.000
|
$312.760
|
$584.000
|
$400.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$7,500.000
|
$7,800.000
|
$9,000.000
|
$5,250.000
|
$7,932.420
|
$4,780.000
|
$9,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$1,000.000
|
$1,500.000
|
$840.000
|
$1,400.000
|
$785.870
|
$1,275.000
|
$750.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$1,400.000
|
$1,550.000
|
$930.000
|
$1,740.000
|
$1,295.040
|
$1,590.000
|
$900.000
|
|
|
SET (TY II) (DES 2) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$700.000
|
$1,800.000
|
$1,200.000
|
$1,740.000
|
$1,497.580
|
$1,590.000
|
$900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$2,500.000
|
$3,000.000
|
$1,000.000
|
$1,740.000
|
$1,200.850
|
$1,590.000
|
$1,200.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
3.000
|
$228.000
|
$500.000
|
$1,750.000
|
$580.000
|
$863.870
|
$530.000
|
$750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$222,900.000
|
$140,000.000
|
$289,000.000
|
$325,000.000
|
$330,321.420
|
$281,000.000
|
$447,473.450
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$800.000
|
$700.000
|
$10,000.000
|
$11,468.020
|
$17,000.000
|
$18,149.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,872.000
|
$22.500
|
$30.000
|
$32.550
|
$40.000
|
$31.460
|
$29.000
|
$27.760
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,872.000
|
$8.000
|
$6.400
|
$7.250
|
$20.000
|
$11.690
|
$6.250
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$13.000
|
$23.000
|
$19.450
|
$15.000
|
$24.530
|
$23.000
|
$21.650
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.000
|
$6.400
|
$6.600
|
$12.000
|
$6.800
|
$6.370
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,840.000
|
$2.000
|
$2.500
|
$2.150
|
$3.200
|
$2.660
|
$2.500
|
$2.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,840.000
|
$0.500
|
$0.400
|
$0.250
|
$0.900
|
$0.400
|
$0.370
|
$0.350
|
|
|
DRIVEWAYS (CONC)
|
SY
|
63.000
|
$75.000
|
$22.000
|
$100.000
|
$99.000
|
$133.160
|
$248.000
|
$121.050
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,629.000
|
$23.250
|
$30.000
|
$40.500
|
$31.000
|
$23.100
|
$51.000
|
$34.100
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
400.000
|
$14.000
|
$37.000
|
$32.500
|
$31.000
|
$33.080
|
$111.000
|
$36.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,525.000
|
$20.000
|
$22.000
|
$24.500
|
$27.000
|
$23.170
|
$20.190
|
$20.450
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
250.000
|
$25.000
|
$22.000
|
$24.500
|
$27.000
|
$23.170
|
$21.250
|
$20.450
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,225.000
|
$1.250
|
$1.100
|
$2.500
|
$2.900
|
$1.130
|
$2.120
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
14.000
|
$255.000
|
$160.000
|
$230.000
|
$260.000
|
$169.980
|
$212.490
|
$150.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
22.000
|
$2,900.000
|
$2,800.000
|
$3,050.000
|
$3,400.000
|
$3,002.990
|
$2,762.430
|
$2,650.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
12.000
|
$200.000
|
$190.000
|
$185.000
|
$210.000
|
$201.090
|
$188.540
|
$212.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$240.000
|
$290.000
|
$195.000
|
$220.000
|
$311.350
|
$291.910
|
$255.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
7.000
|
$483.000
|
$640.000
|
$498.000
|
$570.000
|
$685.590
|
$642.800
|
$491.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$458.000
|
$480.000
|
$475.000
|
$550.000
|
$509.030
|
$477.260
|
$432.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
30.000
|
$350.000
|
$470.000
|
$400.000
|
$460.000
|
$497.480
|
$466.430
|
$375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$80.000
|
$80.000
|
$115.000
|
$125.000
|
$121.390
|
$79.690
|
$95.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
135.000
|
$12.000
|
$45.000
|
$46.000
|
$53.000
|
$48.090
|
$45.090
|
$47.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
49.000
|
$14.000
|
$12.000
|
$13.000
|
$15.000
|
$12.300
|
$11.530
|
$18.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
21.000
|
$56.000
|
$35.000
|
$51.000
|
$59.000
|
$37.100
|
$34.790
|
$47.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
47,916.000
|
$0.250
|
$0.200
|
$0.190
|
$0.300
|
$0.220
|
$0.200
|
$0.190
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
554.000
|
$0.200
|
$0.200
|
$0.190
|
$0.350
|
$0.220
|
$0.200
|
$0.190
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
44,879.000
|
$0.250
|
$0.200
|
$0.190
|
$0.300
|
$0.220
|
$0.200
|
$0.190
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,443.000
|
$0.950
|
$1.650
|
$1.000
|
$0.850
|
$0.570
|
$1.780
|
$1.380
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
149.000
|
$6.000
|
$7.700
|
$7.250
|
$6.900
|
$8.220
|
$7.700
|
$7.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
93,498.000
|
$0.120
|
$0.100
|
$0.100
|
$0.140
|
$0.110
|
$0.110
|
$0.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
47,916.000
|
$0.320
|
$0.300
|
$0.270
|
$0.400
|
$0.310
|
$0.290
|
$0.270
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
554.000
|
$0.380
|
$0.300
|
$0.280
|
$0.450
|
$0.320
|
$0.300
|
$0.280
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
44,879.000
|
$0.320
|
$0.300
|
$0.280
|
$0.420
|
$0.320
|
$0.300
|
$0.280
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
588.000
|
$3.000
|
$3.700
|
$3.500
|
$5.800
|
$3.970
|
$3.720
|
$3.500
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$10,000.000
|
$8,500.000
|
$20,000.000
|
$10,000.000
|
$17,338.010
|
$30,000.000
|
$28,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
30.000
|
$200.000
|
$65.000
|
$65.000
|
$60.000
|
$84.990
|
$155.400
|
$120.000
|
|
Totals: |
$2,430,395.250
|
$2,692,128.550
|
$3,083,196.990
|
$3,302,955.860
|
$3,357,788.271
|
$3,887,732.080
|
$4,067,860.963
|