PREPARING ROW
|
STA
|
61.000
|
$1,500.000
|
$918.775
|
$1,000.000
|
$400.000
|
$1,100.000
|
$1,000.000
|
$175.000
|
$500.000
|
$600.000
|
$1,100.000
|
$1,108.890
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
836.000
|
$15.000
|
$10.595
|
$10.000
|
$10.000
|
$10.000
|
$12.000
|
$13.000
|
$12.330
|
$18.000
|
$26.000
|
$34.300
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
139.000
|
$23.000
|
$12.131
|
$10.000
|
$40.000
|
$14.000
|
$12.000
|
$20.000
|
$16.300
|
$65.000
|
$29.000
|
$34.300
|
|
|
REMOVING CONC (CURB)
|
LF
|
315.000
|
$7.250
|
$4.090
|
$10.000
|
$15.000
|
$2.500
|
$7.000
|
$10.000
|
$7.220
|
$10.000
|
$8.000
|
$17.150
|
|
|
REMOVING STAB BASE & ASPH PAV (0-2")
|
SY
|
9,714.000
|
$6.000
|
$1.543
|
$2.000
|
$4.500
|
$1.000
|
$1.000
|
$2.200
|
$2.150
|
$4.410
|
$1.200
|
$2.260
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
738.000
|
$11.250
|
$23.320
|
$12.000
|
$25.000
|
$19.000
|
$15.000
|
$50.000
|
$15.000
|
$15.000
|
$25.000
|
$21.210
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
785.000
|
$15.000
|
$15.985
|
$15.000
|
$20.000
|
$22.000
|
$12.000
|
$20.000
|
$15.000
|
$30.000
|
$27.000
|
$51.270
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
11,756.000
|
$2.250
|
$2.501
|
$1.390
|
$1.400
|
$2.250
|
$3.500
|
$1.800
|
$2.000
|
$1.180
|
$3.700
|
$1.300
|
|
|
BLOCK SODDING
|
SY
|
1,194.000
|
$5.000
|
$4.635
|
$4.780
|
$4.700
|
$5.000
|
$4.000
|
$7.500
|
$5.000
|
$4.500
|
$5.000
|
$4.450
|
|
|
STRAW OR HAY MULCH
|
SY
|
11,756.000
|
$0.250
|
$0.433
|
$0.560
|
$0.600
|
$0.450
|
$1.000
|
$0.600
|
$0.470
|
$0.420
|
$0.600
|
$0.520
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
11,756.000
|
$0.120
|
$0.144
|
$0.170
|
$0.170
|
$0.160
|
$0.200
|
$0.200
|
$0.160
|
$0.140
|
$0.200
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
6.700
|
$25.750
|
$97.100
|
$100.000
|
$65.000
|
$15.000
|
$125.000
|
$75.000
|
$100.000
|
$221.190
|
$116.000
|
$96.360
|
|
|
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
|
SY
|
9,714.000
|
$2.900
|
$0.571
|
$4.410
|
$4.500
|
$4.750
|
$4.500
|
$10.000
|
$4.500
|
$4.110
|
$23.000
|
$3.010
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
8,420.000
|
$65.000
|
$55.336
|
$64.050
|
$70.000
|
$69.000
|
$67.000
|
$63.000
|
$69.600
|
$73.000
|
$75.000
|
$86.700
|
|
|
D-GR HMA TY-D SAC-A PG64-22
|
TON
|
1,007.000
|
$80.000
|
$75.819
|
$99.750
|
$80.000
|
$80.000
|
$78.000
|
$86.000
|
$81.200
|
$93.000
|
$93.000
|
$103.500
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
151.000
|
$80.000
|
$74.398
|
$105.000
|
$100.000
|
$100.000
|
$98.000
|
$110.000
|
$101.000
|
$108.000
|
$110.000
|
$125.040
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
2,224.000
|
$87.000
|
$74.398
|
$105.000
|
$100.000
|
$100.000
|
$98.000
|
$110.000
|
$101.000
|
$108.000
|
$110.000
|
$125.040
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
1,336.000
|
$10.000
|
$7.976
|
$10.000
|
$18.000
|
$1.000
|
$55.000
|
$8.000
|
$14.000
|
$1.750
|
$19.000
|
$61.900
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
64.000
|
$133.180
|
$7.415
|
$10.000
|
$40.000
|
$1.000
|
$55.000
|
$20.000
|
$14.000
|
$1.730
|
$23.000
|
$61.900
|
|
|
CEM STABIL BKFL
|
CY
|
537.000
|
$135.000
|
$113.540
|
$100.000
|
$120.000
|
$135.000
|
$125.000
|
$152.000
|
$150.000
|
$125.000
|
$155.000
|
$129.050
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
758.000
|
$2.520
|
$10.270
|
$10.000
|
$10.000
|
$1.000
|
$7.000
|
$6.000
|
$7.500
|
$1.000
|
$6.600
|
$7.610
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.400
|
$254.170
|
$288.400
|
$257.250
|
$400.000
|
$282.000
|
$275.000
|
$280.000
|
$296.000
|
$280.000
|
$260.000
|
$245.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
22.000
|
$398.690
|
$412.000
|
$378.000
|
$450.000
|
$402.000
|
$380.000
|
$400.000
|
$422.000
|
$400.000
|
$385.000
|
$360.000
|
|
|
CL A CONC (MEDIAN)
|
CY
|
19.000
|
$350.000
|
$326.500
|
$395.000
|
$460.000
|
$335.000
|
$400.000
|
$530.000
|
$352.000
|
$500.000
|
$460.000
|
$607.530
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
66.000
|
$490.000
|
$405.560
|
$395.000
|
$375.000
|
$360.000
|
$375.000
|
$470.000
|
$416.000
|
$450.000
|
$435.000
|
$462.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$480.000
|
$467.880
|
$405.000
|
$570.000
|
$410.000
|
$500.000
|
$490.000
|
$550.000
|
$500.000
|
$530.000
|
$496.540
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
118.000
|
$230.000
|
$132.890
|
$167.830
|
$185.000
|
$195.000
|
$200.000
|
$250.000
|
$221.000
|
$240.000
|
$170.000
|
$225.110
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
30.000
|
$270.000
|
$223.700
|
$210.920
|
$240.000
|
$250.000
|
$250.000
|
$300.000
|
$280.000
|
$470.000
|
$210.000
|
$265.540
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
565.000
|
$285.000
|
$226.170
|
$241.540
|
$200.000
|
$240.000
|
$275.000
|
$300.000
|
$286.000
|
$290.000
|
$235.000
|
$300.290
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
81.000
|
$80.000
|
$95.970
|
$71.890
|
$95.000
|
$68.000
|
$80.000
|
$105.000
|
$70.600
|
$110.000
|
$85.000
|
$85.470
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
1.000
|
$3,675.000
|
$3,365.000
|
$3,926.000
|
$3,000.000
|
$4,000.000
|
$4,000.000
|
$3,300.000
|
$4,010.000
|
$3,500.000
|
$1,900.000
|
$4,030.970
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
$5,500.000
|
$7,666.500
|
$5,635.500
|
$6,000.000
|
$5,000.000
|
$7,000.000
|
$9,000.000
|
$9,580.000
|
$8,000.000
|
$5,700.000
|
$7,692.330
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
1.000
|
$3,850.000
|
$3,967.000
|
$6,196.320
|
$4,100.000
|
$5,000.000
|
$5,000.000
|
$4,500.000
|
$5,230.000
|
$5,000.000
|
$2,800.000
|
$5,185.970
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
2.000
|
$3,900.000
|
$4,472.000
|
$5,821.140
|
$4,100.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
$6,020.000
|
$6,000.000
|
$3,300.000
|
$5,185.970
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
$4,030.000
|
$4,675.000
|
$4,030.000
|
$6,500.000
|
$5,200.000
|
$5,500.000
|
$6,500.000
|
$6,450.000
|
$5,000.000
|
$5,900.000
|
$5,763.470
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$7,690.000
|
$4,875.500
|
$4,030.000
|
$6,800.000
|
$5,200.000
|
$10,000.000
|
$7,800.000
|
$7,980.000
|
$5,000.000
|
$6,000.000
|
$9,805.990
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$462.000
|
$435.500
|
$1,000.000
|
$700.000
|
$300.000
|
$500.000
|
$850.000
|
$350.000
|
$1,000.000
|
$500.000
|
$565.950
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$162,800.000
|
$169,464.324
|
$150,000.000
|
$125,000.000
|
$200,000.000
|
$206,000.520
|
$210,000.000
|
$179,000.000
|
$200,000.000
|
$165,000.000
|
$198,167.200
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$8,000.000
|
$4,335.737
|
$7,500.000
|
$7,000.000
|
$10,750.000
|
$4,500.000
|
$2,100.000
|
$12,500.000
|
$3,000.000
|
$1,200.000
|
$2,752.770
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,361.000
|
$2.220
|
$2.215
|
$2.311
|
$2.400
|
$2.300
|
$3.000
|
$2.250
|
$2.250
|
$2.150
|
$2.400
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,361.000
|
$0.500
|
$0.258
|
$0.269
|
$0.300
|
$0.600
|
$0.600
|
$0.600
|
$0.260
|
$0.250
|
$0.300
|
$0.250
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
437.000
|
$75.000
|
$67.910
|
$78.000
|
$88.000
|
$73.000
|
$65.000
|
$72.000
|
$90.000
|
$80.000
|
$90.000
|
$68.710
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
809.000
|
$17.680
|
$20.410
|
$18.590
|
$21.000
|
$18.000
|
$19.000
|
$20.000
|
$28.000
|
$25.000
|
$22.000
|
$21.410
|
|
|
CONC CURB (DOWEL)
|
LF
|
595.000
|
$9.250
|
$15.024
|
$24.700
|
$19.000
|
$18.000
|
$16.000
|
$15.000
|
$19.300
|
$25.000
|
$14.000
|
$17.310
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
787.500
|
$20.800
|
$18.334
|
$19.130
|
$19.000
|
$19.000
|
$18.800
|
$18.800
|
$18.800
|
$17.800
|
$20.000
|
$17.800
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,231.000
|
$2,301.020
|
$2,509.050
|
$2,400.000
|
$2,500.000
|
$2,334.000
|
$2,334.000
|
$2,360.000
|
$2,234.000
|
$2,500.000
|
$2,234.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
1.000
|
$2,250.000
|
$11,716.250
|
$12,228.120
|
$12,300.000
|
$13,000.000
|
$15,000.000
|
$5,500.000
|
$12,000.000
|
$11,375.000
|
$12,500.000
|
$11,375.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
30.000
|
$10.500
|
$11.330
|
$17.200
|
$17.000
|
$11.100
|
$16.000
|
$11.000
|
$11.600
|
$11.000
|
$17.000
|
$16.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
260.000
|
$33.000
|
$41.200
|
$37.620
|
$38.000
|
$41.000
|
$35.000
|
$40.000
|
$42.200
|
$40.000
|
$37.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
720.000
|
$13.750
|
$14.420
|
$13.970
|
$11.000
|
$14.100
|
$14.000
|
$14.000
|
$14.800
|
$14.000
|
$14.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
480.000
|
$29.820
|
$45.320
|
$37.620
|
$43.000
|
$45.000
|
$35.000
|
$44.000
|
$46.400
|
$44.000
|
$37.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
680.000
|
$15.500
|
$18.540
|
$16.120
|
$13.000
|
$18.100
|
$15.000
|
$18.000
|
$19.000
|
$18.000
|
$16.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
230.000
|
$40.450
|
$61.800
|
$43.000
|
$48.000
|
$61.000
|
$40.000
|
$60.000
|
$63.300
|
$60.000
|
$43.000
|
$40.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,400.000
|
$1.050
|
$1.545
|
$1.020
|
$1.300
|
$1.550
|
$0.950
|
$1.500
|
$1.600
|
$1.500
|
$1.000
|
$0.950
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$960.950
|
$1,133.000
|
$1,021.250
|
$2,500.000
|
$1,150.000
|
$950.000
|
$1,100.000
|
$1,160.000
|
$1,100.000
|
$1,000.000
|
$950.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
348.000
|
$36.500
|
$35.720
|
$20.420
|
$33.000
|
$36.000
|
$20.000
|
$34.000
|
$32.200
|
$30.500
|
$18.000
|
$19.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
19.000
|
$419.230
|
$365.650
|
$388.870
|
$390.000
|
$388.000
|
$380.000
|
$390.000
|
$382.000
|
$361.740
|
$380.000
|
$361.740
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$480.000
|
$412.000
|
$416.610
|
$415.000
|
$400.000
|
$420.000
|
$400.000
|
$409.000
|
$387.550
|
$430.000
|
$387.550
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$530.000
|
$386.250
|
$429.210
|
$430.000
|
$435.000
|
$430.000
|
$440.000
|
$421.000
|
$399.270
|
$400.000
|
$399.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$715.000
|
$509.850
|
$568.960
|
$570.000
|
$588.000
|
$550.000
|
$590.000
|
$559.000
|
$529.270
|
$530.000
|
$529.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$900.000
|
$540.750
|
$590.420
|
$590.000
|
$650.000
|
$600.000
|
$650.000
|
$580.000
|
$549.230
|
$560.000
|
$549.230
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
1.000
|
$1,600.000
|
$2,214.500
|
$2,495.660
|
$5,600.000
|
$3,300.000
|
$2,120.000
|
$3,300.000
|
$2,450.000
|
$2,150.000
|
$2,300.000
|
$2,115.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
2.000
|
$150.000
|
$231.750
|
$107.500
|
$107.000
|
$230.000
|
$225.000
|
$230.000
|
$106.000
|
$100.000
|
$360.000
|
$100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$410.000
|
$350.200
|
$439.410
|
$440.000
|
$420.000
|
$430.000
|
$420.000
|
$431.000
|
$408.760
|
$360.000
|
$408.760
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$83.000
|
$51.500
|
$69.870
|
$70.000
|
$186.000
|
$50.000
|
$185.000
|
$68.610
|
$65.000
|
$55.000
|
$65.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,218.000
|
$0.650
|
$1.236
|
$1.290
|
$1.200
|
$1.250
|
$1.200
|
$1.200
|
$1.250
|
$1.200
|
$1.300
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,400.000
|
$0.640
|
$1.236
|
$1.290
|
$1.200
|
$1.250
|
$1.200
|
$1.200
|
$1.250
|
$1.200
|
$1.300
|
$1.200
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
781.000
|
$1.100
|
$0.515
|
$0.530
|
$0.500
|
$0.550
|
$0.500
|
$0.500
|
$0.530
|
$0.500
|
$0.850
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,807.000
|
$0.800
|
$0.721
|
$0.750
|
$0.700
|
$0.750
|
$0.700
|
$0.700
|
$0.740
|
$0.700
|
$0.850
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
382.000
|
$13.000
|
$2.369
|
$2.470
|
$2.300
|
$2.350
|
$2.300
|
$2.300
|
$2.450
|
$2.300
|
$7.100
|
$2.300
|
|
REFL PAV MRK TY II (W) 18" (YLD TRI)
|
EA
|
35.000
|
$21.500
|
$22.660
|
$23.650
|
$22.000
|
$23.000
|
$22.000
|
$22.000
|
$23.200
|
$22.000
|
$18.300
|
$22.000
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
1,292.000
|
$1.250
|
$1.133
|
$1.180
|
$1.100
|
$1.150
|
$1.100
|
$1.100
|
$1.150
|
$1.100
|
$3.200
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,287.000
|
$0.400
|
$0.371
|
$0.380
|
$0.360
|
$0.370
|
$0.360
|
$0.360
|
$0.380
|
$0.360
|
$0.450
|
$0.360
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,317.000
|
$0.340
|
$0.330
|
$0.340
|
$0.320
|
$0.330
|
$0.320
|
$0.320
|
$0.340
|
$0.320
|
$0.400
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,936.000
|
$0.340
|
$0.340
|
$0.350
|
$0.330
|
$0.340
|
$0.330
|
$0.330
|
$0.350
|
$0.330
|
$0.400
|
$0.330
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$198.500
|
$216.300
|
$225.750
|
$210.000
|
$211.000
|
$210.000
|
$210.000
|
$222.000
|
$210.000
|
$260.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
20.000
|
$268.000
|
$226.600
|
$236.500
|
$220.000
|
$221.000
|
$220.000
|
$220.000
|
$232.000
|
$220.000
|
$430.000
|
$220.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
60.000
|
$3.230
|
$4.120
|
$4.300
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
$4.200
|
$4.000
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
139.000
|
$4.070
|
$4.120
|
$4.300
|
$4.000
|
$4.500
|
$4.000
|
$4.000
|
$4.200
|
$4.000
|
$3.800
|
$4.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
1.000
|
$6,000.000
|
$5,665.000
|
$25,800.000
|
$12,500.000
|
$6,500.000
|
$24,000.000
|
$5,500.000
|
$5,800.000
|
$5,500.000
|
$26,000.000
|
$24,000.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$219.110
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
3.000
|
$220.920
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$233.470
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
3.000
|
$215.890
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$250.000
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
3.000
|
$206.080
|
$298.700
|
$215.000
|
$317.000
|
$291.000
|
$200.000
|
$290.000
|
$306.000
|
$290.000
|
$213.000
|
$200.000
|
|
|
BACK PLATE (12")(3 SEC)
|
EA
|
11.000
|
$50.730
|
$76.220
|
$91.370
|
$107.000
|
$75.000
|
$85.000
|
$74.000
|
$78.110
|
$74.000
|
$91.000
|
$85.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
5,560.000
|
$1.500
|
$1.751
|
$1.390
|
$2.110
|
$1.800
|
$1.400
|
$1.700
|
$1.800
|
$1.700
|
$1.400
|
$1.300
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$4,500.000
|
$5,047.000
|
$7,148.750
|
$6,400.000
|
$5,500.000
|
$6,700.000
|
$4,900.000
|
$5,170.000
|
$4,900.000
|
$7,100.000
|
$6,650.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
1.000
|
$7,000.000
|
$6,592.000
|
$9,030.000
|
$6,900.000
|
$7,000.000
|
$8,500.000
|
$6,400.000
|
$6,750.000
|
$6,400.000
|
$9,000.000
|
$8,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')
|
EA
|
1.000
|
$11,400.000
|
$15,965.000
|
$24,402.500
|
$14,000.000
|
$17,000.000
|
$23,000.000
|
$15,500.000
|
$16,400.000
|
$15,500.000
|
$24,200.000
|
$22,700.000
|
|
|
REMOVAL OF SIGNAL POLE ASSM
|
EA
|
3.000
|
$914.780
|
$1,133.000
|
$860.000
|
$1,600.000
|
$1,200.000
|
$800.000
|
$1,100.000
|
$1,160.000
|
$1,100.000
|
$850.000
|
$800.000
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
4.000
|
$1,575.000
|
$2,214.500
|
$1,935.000
|
$2,700.000
|
$2,300.000
|
$1,800.000
|
$2,500.000
|
$2,270.000
|
$2,150.000
|
$1,900.000
|
$1,800.000
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
3,810.000
|
$2.700
|
$2.575
|
$1.610
|
$4.400
|
$2.550
|
$1.500
|
$2.500
|
$2.650
|
$2.500
|
$1.600
|
$1.500
|
|
Totals: |
$2,017,885.083
|
$1,769,284.117
|
$1,985,115.405
|
$2,016,847.060
|
$2,074,950.700
|
$2,127,356.260
|
$2,132,227.190
|
$2,144,857.040
|
$2,155,434.183
|
$2,357,049.350
|
$2,431,325.052
|