PREPARING ROW
|
STA
|
169.000
|
$1,150.000
|
$388.500
|
$385.000
|
$500.000
|
$750.000
|
$229.000
|
$3,350.000
|
$300.750
|
$562.120
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
127.000
|
$20.000
|
$19.620
|
$32.000
|
$40.000
|
$28.000
|
$40.000
|
$15.000
|
$22.410
|
$36.300
|
|
|
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
12,084.000
|
$4.000
|
$3.000
|
$4.250
|
$9.000
|
$4.000
|
$7.500
|
$3.500
|
$3.700
|
$13.270
|
|
|
EXCAV (ROADWAY)
|
CY
|
14,690.000
|
$14.000
|
$13.110
|
$14.500
|
$24.000
|
$8.000
|
$14.000
|
$12.000
|
$13.090
|
$15.170
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
9,687.000
|
$13.500
|
$13.110
|
$14.500
|
$27.000
|
$6.000
|
$11.000
|
$24.000
|
$22.400
|
$18.340
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
69,282.000
|
$1.500
|
$0.870
|
$1.250
|
$0.400
|
$1.000
|
$3.000
|
$1.500
|
$6.030
|
$3.500
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
69,282.000
|
$0.200
|
$0.210
|
$0.200
|
$0.250
|
$0.250
|
$0.260
|
$0.200
|
$0.160
|
$0.260
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
69,282.000
|
$0.200
|
$0.100
|
$0.100
|
$0.250
|
$0.150
|
$0.130
|
$0.100
|
$0.140
|
$0.260
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
69,282.000
|
$0.200
|
$0.110
|
$0.110
|
$0.250
|
$0.150
|
$0.140
|
$0.110
|
$0.140
|
$0.260
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,164.000
|
$10.000
|
$22.750
|
$2.000
|
$4.000
|
$20.000
|
$57.000
|
$22.000
|
$40.490
|
$50.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
|
SY
|
69,282.000
|
$0.750
|
$1.250
|
$1.200
|
$1.200
|
$1.250
|
$2.000
|
$1.200
|
$1.420
|
$1.270
|
|
|
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
|
CY
|
13,819.000
|
$57.500
|
$59.830
|
$74.000
|
$27.000
|
$69.000
|
$106.000
|
$85.000
|
$83.000
|
$118.100
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
9,335.000
|
$3.900
|
$4.650
|
$4.150
|
$4.000
|
$4.000
|
$5.000
|
$4.000
|
$4.220
|
$6.740
|
|
|
D-GR HMA TY-C PG76-22
|
TON
|
5,135.000
|
$107.500
|
$93.610
|
$97.400
|
$130.000
|
$128.000
|
$124.000
|
$105.000
|
$136.490
|
$125.310
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
7,597.000
|
$112.500
|
$93.610
|
$105.000
|
$125.000
|
$132.000
|
$133.000
|
$110.000
|
$142.280
|
$123.910
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
1,362.000
|
$115.000
|
$97.980
|
$107.500
|
$135.000
|
$150.000
|
$134.000
|
$115.000
|
$156.160
|
$172.730
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
4,863.000
|
$125.000
|
$116.710
|
$97.000
|
$140.000
|
$160.000
|
$176.000
|
$145.000
|
$167.730
|
$163.120
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,129.000
|
$43.500
|
$39.370
|
$38.000
|
$1.500
|
$48.000
|
$49.000
|
$42.000
|
$50.030
|
$58.090
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
12.000
|
$125.000
|
$210.020
|
$95.000
|
$76.000
|
$200.000
|
$375.000
|
$300.000
|
$93.010
|
$207.400
|
|
|
CEM STABIL BKFL
|
CY
|
117.000
|
$180.000
|
$194.270
|
$230.000
|
$150.000
|
$375.000
|
$436.000
|
$275.000
|
$176.250
|
$191.850
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
48.000
|
$10.000
|
$12.600
|
$20.500
|
$12.000
|
$105.000
|
$2.000
|
$3.000
|
$7.870
|
$12.440
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
7.000
|
$600.000
|
$892.580
|
$550.000
|
$900.000
|
$1,015.000
|
$822.000
|
$575.000
|
$1,198.060
|
$881.450
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
82.000
|
$550.000
|
$997.590
|
$397.000
|
$900.000
|
$625.000
|
$700.000
|
$450.000
|
$587.820
|
$985.150
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
46.000
|
$625.000
|
$945.080
|
$605.000
|
$900.000
|
$745.000
|
$727.000
|
$700.000
|
$547.070
|
$933.300
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
9.000
|
$225.000
|
$192.040
|
$635.000
|
$300.000
|
$720.000
|
$815.000
|
$750.000
|
$165.030
|
$171.110
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
52.000
|
$275.000
|
$250.390
|
$280.000
|
$250.000
|
$315.000
|
$359.000
|
$350.000
|
$164.990
|
$233.330
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
202.000
|
$85.000
|
$65.110
|
$108.000
|
$110.000
|
$115.000
|
$147.000
|
$90.000
|
$84.770
|
$64.290
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
57.000
|
$115.000
|
$141.760
|
$192.000
|
$128.000
|
$175.000
|
$169.000
|
$165.000
|
$101.400
|
$140.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
107.000
|
$125.000
|
$204.770
|
$255.000
|
$155.000
|
$215.000
|
$149.000
|
$165.000
|
$130.790
|
$202.220
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
19.000
|
$180.000
|
$236.270
|
$566.000
|
$200.000
|
$295.000
|
$286.000
|
$435.000
|
$179.210
|
$233.330
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
13.000
|
$260.000
|
$341.280
|
$855.000
|
$350.000
|
$450.000
|
$449.000
|
$650.000
|
$254.240
|
$337.030
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
688.000
|
$195.000
|
$236.270
|
$203.500
|
$300.000
|
$255.000
|
$209.000
|
$183.000
|
$167.770
|
$233.330
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
98.000
|
$275.000
|
$299.280
|
$218.000
|
$350.000
|
$315.000
|
$237.000
|
$210.000
|
$212.170
|
$295.550
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,500.000
|
$945.080
|
$1,960.000
|
$1,000.000
|
$2,150.000
|
$2,009.000
|
$2,000.000
|
$1,851.980
|
$933.300
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,100.000
|
$2,100.180
|
$2,100.000
|
$2,400.000
|
$2,875.000
|
$1,968.000
|
$2,000.000
|
$2,016.940
|
$2,074.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$2,625.230
|
$2,235.000
|
$2,500.000
|
$2,900.000
|
$2,141.000
|
$2,400.000
|
$2,243.200
|
$2,592.500
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$3,360.290
|
$4,075.000
|
$3,000.000
|
$3,425.000
|
$2,008.000
|
$2,600.000
|
$3,137.910
|
$3,318.400
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$3,675.320
|
$4,200.000
|
$3,000.000
|
$3,450.000
|
$2,328.000
|
$2,800.000
|
$3,423.640
|
$3,629.500
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$5,250.450
|
$6,300.000
|
$4,000.000
|
$5,150.000
|
$3,834.000
|
$4,000.000
|
$4,763.400
|
$5,185.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$8,500.000
|
$6,300.550
|
$13,400.000
|
$5,000.000
|
$10,850.000
|
$5,657.000
|
$6,200.000
|
$7,763.530
|
$6,222.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
50.000
|
$1,250.000
|
$1,260.110
|
$2,240.000
|
$3,500.000
|
$7,250.000
|
$2,129.000
|
$2,000.000
|
$1,853.730
|
$1,244.400
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$3,000.000
|
$4,725.410
|
$4,215.000
|
$6,500.000
|
$8,500.000
|
$2,326.000
|
$2,400.000
|
$3,079.590
|
$4,666.500
|
|
|
REMOV STR (SET)
|
EA
|
18.000
|
$500.000
|
$682.560
|
$332.000
|
$350.000
|
$1,000.000
|
$331.000
|
$450.000
|
$599.270
|
$674.050
|
|
|
REMOV STR (PIPE)
|
LF
|
48.000
|
$20.000
|
$42.000
|
$22.000
|
$10.000
|
$50.000
|
$22.000
|
$35.000
|
$24.270
|
$41.480
|
|
|
REMOVE STR (DRIVEWAY CULVERT)
|
EA
|
29.000
|
$550.000
|
$997.590
|
$550.000
|
$300.000
|
$1,500.000
|
$361.000
|
$850.000
|
$1,644.830
|
$985.150
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$375,725.000
|
$396,332.300
|
$500,000.000
|
$400,000.000
|
$285,000.000
|
$200,332.000
|
$650,000.000
|
$499,592.260
|
$623,850.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$7,978.270
|
$5,150.000
|
$5,000.000
|
$20,000.000
|
$2,764.000
|
$20,000.000
|
$3,088.940
|
$5,251.840
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$3,642.520
|
$2,000.000
|
$4,000.000
|
$12,750.000
|
$10,812.000
|
$15,000.000
|
$8,791.040
|
$18,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
36.000
|
$200.000
|
$156.110
|
$25.000
|
$500.000
|
$390.000
|
$415.000
|
$200.000
|
$174.870
|
$175.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
32.000
|
$98.000
|
$104.070
|
$250.000
|
$700.000
|
$210.000
|
$26.000
|
$85.000
|
$204.540
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
270.000
|
$60.000
|
$56.160
|
$54.000
|
$50.000
|
$65.000
|
$69.000
|
$54.000
|
$78.660
|
$71.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
270.000
|
$10.000
|
$16.640
|
$16.000
|
$5.000
|
$25.000
|
$21.000
|
$16.000
|
$20.820
|
$18.900
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
990.000
|
$4.000
|
$2.860
|
$2.750
|
$5.000
|
$5.000
|
$4.000
|
$2.750
|
$5.780
|
$5.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
990.000
|
$1.000
|
$0.990
|
$0.950
|
$1.000
|
$1.000
|
$1.000
|
$0.950
|
$1.160
|
$1.060
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,614.000
|
$5.500
|
$3.640
|
$3.500
|
$2.000
|
$7.000
|
$4.000
|
$3.500
|
$7.230
|
$6.440
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,614.000
|
$1.100
|
$1.040
|
$1.000
|
$0.500
|
$2.000
|
$1.000
|
$1.000
|
$1.740
|
$1.610
|
|
|
CONSTRUCTING DETOURS
|
SY
|
333.000
|
$80.000
|
$34.560
|
$25.000
|
$5.000
|
$32.000
|
$36.000
|
$32.000
|
$143.660
|
$72.060
|
|
|
DRIVEWAYS (CONC)
|
SY
|
126.000
|
$115.000
|
$240.770
|
$121.000
|
$110.000
|
$180.000
|
$171.000
|
$120.000
|
$120.940
|
$233.330
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,612.000
|
$47.500
|
$40.980
|
$53.750
|
$75.000
|
$33.000
|
$60.000
|
$60.000
|
$68.990
|
$80.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
825.000
|
$27.000
|
$25.490
|
$25.000
|
$32.000
|
$28.000
|
$30.000
|
$30.000
|
$29.460
|
$26.740
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,500.000
|
$1,523.750
|
$1,350.000
|
$1,800.000
|
$1,525.000
|
$1,622.000
|
$1,600.000
|
$1,494.190
|
$1,356.320
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,300.000
|
$3,463.070
|
$3,500.000
|
$3,000.000
|
$4,000.000
|
$4,205.000
|
$4,200.000
|
$4,085.560
|
$3,708.580
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$675.000
|
$520.000
|
$520.000
|
$500.000
|
$650.000
|
$631.000
|
$525.000
|
$607.290
|
$546.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
10.000
|
$340.000
|
$210.000
|
$210.000
|
$300.000
|
$400.000
|
$330.000
|
$215.000
|
$318.100
|
$220.500
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$350.000
|
$220.000
|
$220.000
|
$300.000
|
$350.000
|
$360.000
|
$220.000
|
$347.020
|
$231.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$725.000
|
$675.000
|
$675.000
|
$650.000
|
$800.000
|
$781.000
|
$675.000
|
$751.880
|
$708.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$800.000
|
$815.000
|
$815.000
|
$700.000
|
$1,100.000
|
$901.000
|
$825.000
|
$867.550
|
$855.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
$725.000
|
$730.000
|
$730.000
|
$750.000
|
$975.000
|
$901.000
|
$735.000
|
$867.550
|
$766.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,050.000
|
$870.000
|
$870.000
|
$875.000
|
$1,200.000
|
$1,051.000
|
$875.000
|
$1,012.140
|
$913.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$850.000
|
$1,325.000
|
$1,021.000
|
$1,000.000
|
$983.230
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,215.000
|
$1,100.000
|
$1,100.000
|
$1,000.000
|
$1,400.000
|
$1,201.000
|
$1,100.000
|
$1,156.730
|
$1,155.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
34.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$55.000
|
$120.000
|
$105.000
|
$115.670
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$34.000
|
$31.000
|
$40.000
|
$25.000
|
$65.000
|
$26.000
|
$25.000
|
$56.280
|
$42.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$2.750
|
$4.000
|
$4.000
|
$4.000
|
$8.000
|
$5.000
|
$4.000
|
$4.630
|
$4.120
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$7.500
|
$10.000
|
$10.000
|
$10.000
|
$9.000
|
$12.000
|
$10.000
|
$11.570
|
$10.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
33,780.000
|
$0.750
|
$0.650
|
$0.650
|
$0.650
|
$1.000
|
$1.000
|
$0.650
|
$0.750
|
$0.670
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
422.000
|
$1.000
|
$1.600
|
$1.750
|
$1.000
|
$1.250
|
$2.000
|
$2.350
|
$0.970
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,429.000
|
$1.000
|
$0.870
|
$0.870
|
$0.870
|
$1.000
|
$1.000
|
$0.870
|
$1.010
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
50.000
|
$7.000
|
$10.000
|
$10.000
|
$10.000
|
$22.000
|
$12.000
|
$10.000
|
$11.570
|
$10.300
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$150.000
|
$200.000
|
$200.000
|
$200.000
|
$310.000
|
$240.000
|
$200.000
|
$231.350
|
$206.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$175.000
|
$200.000
|
$200.000
|
$200.000
|
$330.000
|
$240.000
|
$200.000
|
$231.350
|
$206.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
|
LF
|
16,890.000
|
$0.750
|
$0.650
|
$0.650
|
$0.650
|
$1.000
|
$1.000
|
$0.650
|
$0.750
|
$0.670
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
33,921.000
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$0.250
|
$0.240
|
$0.200
|
$0.230
|
$0.210
|
|
RE PM TY II (W) 8" (SLD)
|
LF
|
1,429.000
|
$0.400
|
$0.200
|
$0.200
|
$0.200
|
$0.500
|
$0.240
|
$0.200
|
$0.230
|
$0.210
|
|
RE PM TY II (W) 24" (SLD)
|
LF
|
50.000
|
$4.000
|
$3.000
|
$3.000
|
$3.000
|
$7.000
|
$4.000
|
$3.000
|
$3.470
|
$3.090
|
|
RE PM TY II (W) (ARROW)
|
EA
|
4.000
|
$65.000
|
$50.000
|
$50.000
|
$50.000
|
$85.000
|
$60.000
|
$50.000
|
$57.840
|
$51.500
|
|
RE PM TY II (W) (WORD)
|
EA
|
4.000
|
$75.000
|
$50.000
|
$50.000
|
$50.000
|
$90.000
|
$60.000
|
$50.000
|
$57.840
|
$51.500
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
5,690.000
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$0.500
|
$0.250
|
$0.200
|
$0.230
|
$0.210
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
13,105.000
|
$0.220
|
$0.200
|
$0.200
|
$0.200
|
$0.500
|
$0.250
|
$0.200
|
$0.230
|
$0.210
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
33,921.000
|
$0.750
|
$0.700
|
$0.700
|
$0.700
|
$1.150
|
$1.000
|
$0.700
|
$0.810
|
$0.720
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
13,105.000
|
$0.600
|
$0.700
|
$0.700
|
$0.700
|
$1.150
|
$1.000
|
$0.700
|
$0.810
|
$0.720
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
5,690.000
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
$1.200
|
$1.000
|
$0.750
|
$0.870
|
$0.770
|
|
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
|
LF
|
2,845.000
|
$8.500
|
$3.500
|
$3.500
|
$3.500
|
$4.000
|
$4.000
|
$3.500
|
$4.050
|
$3.610
|
|
REFL PAV MRKR TY I-C
|
EA
|
57.000
|
$4.000
|
$3.750
|
$3.750
|
$3.750
|
$7.000
|
$5.000
|
$3.750
|
$4.340
|
$3.860
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
845.000
|
$4.000
|
$3.750
|
$3.750
|
$3.750
|
$6.500
|
$5.000
|
$3.750
|
$4.340
|
$3.860
|
|
|
BONDING COURSE
|
GAL
|
15,724.000
|
$3.250
|
$3.370
|
$4.000
|
$4.000
|
$4.000
|
$5.000
|
$4.250
|
$4.280
|
$5.000
|
|
|
SUBSURFACE UTIL LOCATE (NON-PAVED AREA)
|
EA
|
4.000
|
$650.000
|
$1,250.000
|
$1,500.000
|
$250.000
|
$7,250.000
|
$1,655.000
|
$700.000
|
$2,501.450
|
$2,000.000
|
|
Totals: |
$5,431,676.470
|
$5,111,477.850
|
$5,481,873.200
|
$5,674,472.630
|
$6,469,605.750
|
$6,786,631.210
|
$6,831,569.150
|
$7,061,719.400
|
$7,644,915.250
|