CALDWELL SH 304 (0573-02-008)

Items: 97

County: CALDWELL
Length: 3.2000 MILES
Highway: SH 304
District: AUSTIN
Control Number: 0573-02-008
DBE Goal: 0.0%
Project: F 2026(976)
Guaranty: $100,000.00
Time: 121 WORKING DAYS
Engineer's Estimate: $5,431,676.47
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263208
Type: WIDEN ROAD - ADD SHOULDERS
Project ID: A00061184
Contract Type: FEDERAL
Project Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$5,431,676.47
Over/Under Est: -5.9% -$320,198.62
Over/Under Est: 0.92% $50,196.73
Amt Left: 7.25% $370,395.35
Over/Under Est: 4.47% $242,796.16
Amt Left: 11.01% $562,994.78
Delta: -3.51% -$192,599.43
Over/Under Est: 19.11% $1,037,929.28
Amt Left: 26.57% $1,358,127.90
Delta: -14.01% -$795,133.12
Over/Under Est: 24.95% $1,354,954.74
Amt Left: 32.77% $1,675,153.36
Delta: -4.90% -$317,025.46
$6,831,569.15
Over/Under Est: 25.77% $1,399,892.68
Amt Left: 33.65% $1,720,091.30
Delta: -0.66% -$44,937.94
$7,061,719.40
Over/Under Est: 30.01% $1,630,042.93
Amt Left: 38.15% $1,950,241.55
Delta: -3.37% -$230,150.25
Over/Under Est: 40.75% $2,213,238.78
Amt Left: 49.56% $2,533,437.40
Delta: -8.26% -$583,195.85

Bid Items & Bid Tabulations

97 Total 0 of 97
CALDWELL  |  SH 304  |  AUSTIN  |  0573-02-008  |  09/03/2026 1:00 PM CDT  |  $5,431,676.47  |  F 2026(976)  |  WIDEN ROAD - ADD SHOULDERS  |  121 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HUNTER INDUSTRIES, LTD.
TEXAS MATERIALS GROUP, INC.
D&S CONCRETE CONTRACTORS LLC
JOE BLAND CONSTRUCTION LLC
AARON CONCRETE CONTRACTORS, LLC
DAN WILLIAMS COMPANY
STX CIVIL
CLARK CONSTRUCTION OF TEXAS, INC.
PREPARING ROW
STA 169.000 $1,150.000 $388.500 $385.000 $500.000 $750.000 $229.000 $3,350.000 $300.750 $562.120
REMOV CONC (DRIVEWAYS)
SY 127.000 $20.000 $19.620 $32.000 $40.000 $28.000 $40.000 $15.000 $22.410 $36.300
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
SY 12,084.000 $4.000 $3.000 $4.250 $9.000 $4.000 $7.500 $3.500 $3.700 $13.270
EXCAV (ROADWAY)
CY 14,690.000 $14.000 $13.110 $14.500 $24.000 $8.000 $14.000 $12.000 $13.090 $15.170
EMBANK (FNL)(OC)(TY B)
CY 9,687.000 $13.500 $13.110 $14.500 $27.000 $6.000 $11.000 $24.000 $22.400 $18.340
FURN & PLACE TOPSOIL (4")
SY 69,282.000 $1.500 $0.870 $1.250 $0.400 $1.000 $3.000 $1.500 $6.030 $3.500
BROADCAST SEED (PERM_RURAL_SAND)
SY 69,282.000 $0.200 $0.210 $0.200 $0.250 $0.250 $0.260 $0.200 $0.160 $0.260
BROADCAST SEED (TEMP_WARM)
SY 69,282.000 $0.200 $0.100 $0.100 $0.250 $0.150 $0.130 $0.100 $0.140 $0.260
BROADCAST SEED (TEMP_COOL)
SY 69,282.000 $0.200 $0.110 $0.110 $0.250 $0.150 $0.140 $0.110 $0.140 $0.260
VEGETATIVE WATERING
TGL 1,164.000 $10.000 $22.750 $2.000 $4.000 $20.000 $57.000 $22.000 $40.490 $50.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT)
SY 69,282.000 $0.750 $1.250 $1.200 $1.200 $1.250 $2.000 $1.200 $1.420 $1.270
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 13,819.000 $57.500 $59.830 $74.000 $27.000 $69.000 $106.000 $85.000 $83.000 $118.100
PRIME COAT (MULTI OPTION)
GAL 9,335.000 $3.900 $4.650 $4.150 $4.000 $4.000 $5.000 $4.000 $4.220 $6.740
D-GR HMA TY-C PG76-22
TON 5,135.000 $107.500 $93.610 $97.400 $130.000 $128.000 $124.000 $105.000 $136.490 $125.310
D-GR HMA TY-D PG76-22
TON 7,597.000 $112.500 $93.610 $105.000 $125.000 $132.000 $133.000 $110.000 $142.280 $123.910
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 1,362.000 $115.000 $97.980 $107.500 $135.000 $150.000 $134.000 $115.000 $156.160 $172.730
TOM-C PG76-22 SAC-B
TON 4,863.000 $125.000 $116.710 $97.000 $140.000 $160.000 $176.000 $145.000 $167.730 $163.120
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,129.000 $43.500 $39.370 $38.000 $1.500 $48.000 $49.000 $42.000 $50.030 $58.090
CUT & RESTORE ASPH PAVING
SY 12.000 $125.000 $210.020 $95.000 $76.000 $200.000 $375.000 $300.000 $93.010 $207.400
CEM STABIL BKFL
CY 117.000 $180.000 $194.270 $230.000 $150.000 $375.000 $436.000 $275.000 $176.250 $191.850
TRENCH EXCAVATION PROTECTION
LF 48.000 $10.000 $12.600 $20.500 $12.000 $105.000 $2.000 $3.000 $7.870 $12.440
RIPRAP (CONC)(4 IN)
CY 7.000 $600.000 $892.580 $550.000 $900.000 $1,015.000 $822.000 $575.000 $1,198.060 $881.450
RIPRAP (CONC)(5 IN)
CY 82.000 $550.000 $997.590 $397.000 $900.000 $625.000 $700.000 $450.000 $587.820 $985.150
RIPRAP (MOW STRIP)(4 IN)
CY 46.000 $625.000 $945.080 $605.000 $900.000 $745.000 $727.000 $700.000 $547.070 $933.300
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 9.000 $225.000 $192.040 $635.000 $300.000 $720.000 $815.000 $750.000 $165.030 $171.110
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 52.000 $275.000 $250.390 $280.000 $250.000 $315.000 $359.000 $350.000 $164.990 $233.330
RC PIPE (CL III)(18 IN)
LF 202.000 $85.000 $65.110 $108.000 $110.000 $115.000 $147.000 $90.000 $84.770 $64.290
RC PIPE (CL III)(24 IN)
LF 57.000 $115.000 $141.760 $192.000 $128.000 $175.000 $169.000 $165.000 $101.400 $140.000
RC PIPE (CL III)(30 IN)
LF 107.000 $125.000 $204.770 $255.000 $155.000 $215.000 $149.000 $165.000 $130.790 $202.220
RC PIPE (CL III)(36 IN)
LF 19.000 $180.000 $236.270 $566.000 $200.000 $295.000 $286.000 $435.000 $179.210 $233.330
RC PIPE (CL III)(48 IN)
LF 13.000 $260.000 $341.280 $855.000 $350.000 $450.000 $449.000 $650.000 $254.240 $337.030
RC PIPE (ARCH)(CL III)(DES 1)
LF 688.000 $195.000 $236.270 $203.500 $300.000 $255.000 $209.000 $183.000 $167.770 $233.330
RC PIPE (ARCH)(CL III)(DES 3)
LF 98.000 $275.000 $299.280 $218.000 $350.000 $315.000 $237.000 $210.000 $212.170 $295.550
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 16.000 $1,500.000 $945.080 $1,960.000 $1,000.000 $2,150.000 $2,009.000 $2,000.000 $1,851.980 $933.300
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $2,100.000 $2,100.180 $2,100.000 $2,400.000 $2,875.000 $1,968.000 $2,000.000 $2,016.940 $2,074.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $2,625.230 $2,235.000 $2,500.000 $2,900.000 $2,141.000 $2,400.000 $2,243.200 $2,592.500
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $3,000.000 $3,360.290 $4,075.000 $3,000.000 $3,425.000 $2,008.000 $2,600.000 $3,137.910 $3,318.400
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,500.000 $3,675.320 $4,200.000 $3,000.000 $3,450.000 $2,328.000 $2,800.000 $3,423.640 $3,629.500
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $4,000.000 $5,250.450 $6,300.000 $4,000.000 $5,150.000 $3,834.000 $4,000.000 $4,763.400 $5,185.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 2.000 $8,500.000 $6,300.550 $13,400.000 $5,000.000 $10,850.000 $5,657.000 $6,200.000 $7,763.530 $6,222.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 50.000 $1,250.000 $1,260.110 $2,240.000 $3,500.000 $7,250.000 $2,129.000 $2,000.000 $1,853.730 $1,244.400
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 8.000 $3,000.000 $4,725.410 $4,215.000 $6,500.000 $8,500.000 $2,326.000 $2,400.000 $3,079.590 $4,666.500
REMOV STR (SET)
EA 18.000 $500.000 $682.560 $332.000 $350.000 $1,000.000 $331.000 $450.000 $599.270 $674.050
REMOV STR (PIPE)
LF 48.000 $20.000 $42.000 $22.000 $10.000 $50.000 $22.000 $35.000 $24.270 $41.480
REMOVE STR (DRIVEWAY CULVERT)
EA 29.000 $550.000 $997.590 $550.000 $300.000 $1,500.000 $361.000 $850.000 $1,644.830 $985.150
MOBILIZATION
LS 1.000 $375,725.000 $396,332.300 $500,000.000 $400,000.000 $285,000.000 $200,332.000 $650,000.000 $499,592.260 $623,850.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $7,978.270 $5,150.000 $5,000.000 $20,000.000 $2,764.000 $20,000.000 $3,088.940 $5,251.840
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $3,642.520 $2,000.000 $4,000.000 $12,750.000 $10,812.000 $15,000.000 $8,791.040 $18,500.000
TMA (STATIONARY)
DAY 36.000 $200.000 $156.110 $25.000 $500.000 $390.000 $415.000 $200.000 $174.870 $175.000
TMA (MOBILE OPERATION)
HR 32.000 $98.000 $104.070 $250.000 $700.000 $210.000 $26.000 $85.000 $204.540 $55.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 270.000 $60.000 $56.160 $54.000 $50.000 $65.000 $69.000 $54.000 $78.660 $71.400
ROCK FILTER DAMS (REMOVE)
LF 270.000 $10.000 $16.640 $16.000 $5.000 $25.000 $21.000 $16.000 $20.820 $18.900
TEMP SEDMT CONT FENCE (INSTALL)
LF 990.000 $4.000 $2.860 $2.750 $5.000 $5.000 $4.000 $2.750 $5.780 $5.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 990.000 $1.000 $0.990 $0.950 $1.000 $1.000 $1.000 $0.950 $1.160 $1.060
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,614.000 $5.500 $3.640 $3.500 $2.000 $7.000 $4.000 $3.500 $7.230 $6.440
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,614.000 $1.100 $1.040 $1.000 $0.500 $2.000 $1.000 $1.000 $1.740 $1.610
CONSTRUCTING DETOURS
SY 333.000 $80.000 $34.560 $25.000 $5.000 $32.000 $36.000 $32.000 $143.660 $72.060
DRIVEWAYS (CONC)
SY 126.000 $115.000 $240.770 $121.000 $110.000 $180.000 $171.000 $120.000 $120.940 $233.330
DRIVEWAYS (ACP)
SY 3,612.000 $47.500 $40.980 $53.750 $75.000 $33.000 $60.000 $60.000 $68.990 $80.400
MTL W-BEAM GD FEN (TIM POST)
LF 825.000 $27.000 $25.490 $25.000 $32.000 $28.000 $30.000 $30.000 $29.460 $26.740
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,523.750 $1,350.000 $1,800.000 $1,525.000 $1,622.000 $1,600.000 $1,494.190 $1,356.320
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,300.000 $3,463.070 $3,500.000 $3,000.000 $4,000.000 $4,205.000 $4,200.000 $4,085.560 $3,708.580
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $675.000 $520.000 $520.000 $500.000 $650.000 $631.000 $525.000 $607.290 $546.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 10.000 $340.000 $210.000 $210.000 $300.000 $400.000 $330.000 $215.000 $318.100 $220.500
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 4.000 $350.000 $220.000 $220.000 $300.000 $350.000 $360.000 $220.000 $347.020 $231.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $725.000 $675.000 $675.000 $650.000 $800.000 $781.000 $675.000 $751.880 $708.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $800.000 $815.000 $815.000 $700.000 $1,100.000 $901.000 $825.000 $867.550 $855.750
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 16.000 $725.000 $730.000 $730.000 $750.000 $975.000 $901.000 $735.000 $867.550 $766.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,050.000 $870.000 $870.000 $875.000 $1,200.000 $1,051.000 $875.000 $1,012.140 $913.500
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $1,000.000 $1,000.000 $1,000.000 $850.000 $1,325.000 $1,021.000 $1,000.000 $983.230 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,215.000 $1,100.000 $1,100.000 $1,000.000 $1,400.000 $1,201.000 $1,100.000 $1,156.730 $1,155.000
REMOVE SM RD SN SUP&AM
EA 34.000 $100.000 $100.000 $100.000 $100.000 $55.000 $120.000 $105.000 $115.670 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $34.000 $31.000 $40.000 $25.000 $65.000 $26.000 $25.000 $56.280 $42.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 48.000 $2.750 $4.000 $4.000 $4.000 $8.000 $5.000 $4.000 $4.630 $4.120
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $7.500 $10.000 $10.000 $10.000 $9.000 $12.000 $10.000 $11.570 $10.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 33,780.000 $0.750 $0.650 $0.650 $0.650 $1.000 $1.000 $0.650 $0.750 $0.670
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 422.000 $1.000 $1.600 $1.750 $1.000 $1.250 $2.000 $2.350 $0.970 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,429.000 $1.000 $0.870 $0.870 $0.870 $1.000 $1.000 $0.870 $1.010 $0.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 50.000 $7.000 $10.000 $10.000 $10.000 $22.000 $12.000 $10.000 $11.570 $10.300
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $150.000 $200.000 $200.000 $200.000 $310.000 $240.000 $200.000 $231.350 $206.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $175.000 $200.000 $200.000 $200.000 $330.000 $240.000 $200.000 $231.350 $206.000
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 16,890.000 $0.750 $0.650 $0.650 $0.650 $1.000 $1.000 $0.650 $0.750 $0.670
RE PM TY II (W) 6" (SLD)
LF 33,921.000 $0.220 $0.200 $0.200 $0.200 $0.250 $0.240 $0.200 $0.230 $0.210
RE PM TY II (W) 8" (SLD)
LF 1,429.000 $0.400 $0.200 $0.200 $0.200 $0.500 $0.240 $0.200 $0.230 $0.210
RE PM TY II (W) 24" (SLD)
LF 50.000 $4.000 $3.000 $3.000 $3.000 $7.000 $4.000 $3.000 $3.470 $3.090
RE PM TY II (W) (ARROW)
EA 4.000 $65.000 $50.000 $50.000 $50.000 $85.000 $60.000 $50.000 $57.840 $51.500
RE PM TY II (W) (WORD)
EA 4.000 $75.000 $50.000 $50.000 $50.000 $90.000 $60.000 $50.000 $57.840 $51.500
RE PM TY II (Y) 6" (BRK)
LF 5,690.000 $0.220 $0.200 $0.200 $0.200 $0.500 $0.250 $0.200 $0.230 $0.210
RE PM TY II (Y) 6" (SLD)
LF 13,105.000 $0.220 $0.200 $0.200 $0.200 $0.500 $0.250 $0.200 $0.230 $0.210
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 33,921.000 $0.750 $0.700 $0.700 $0.700 $1.150 $1.000 $0.700 $0.810 $0.720
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 13,105.000 $0.600 $0.700 $0.700 $0.700 $1.150 $1.000 $0.700 $0.810 $0.720
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 5,690.000 $0.750 $0.750 $0.750 $0.750 $1.200 $1.000 $0.750 $0.870 $0.770
PRFB RUMBLE STRIP (BLK)(1')(CENTERLINE)
LF 2,845.000 $8.500 $3.500 $3.500 $3.500 $4.000 $4.000 $3.500 $4.050 $3.610
REFL PAV MRKR TY I-C
EA 57.000 $4.000 $3.750 $3.750 $3.750 $7.000 $5.000 $3.750 $4.340 $3.860
REFL PAV MRKR TY II-A-A
EA 845.000 $4.000 $3.750 $3.750 $3.750 $6.500 $5.000 $3.750 $4.340 $3.860
BONDING COURSE
GAL 15,724.000 $3.250 $3.370 $4.000 $4.000 $4.000 $5.000 $4.250 $4.280 $5.000
SUBSURFACE UTIL LOCATE (NON-PAVED AREA)
EA 4.000 $650.000 $1,250.000 $1,500.000 $250.000 $7,250.000 $1,655.000 $700.000 $2,501.450 $2,000.000
Totals: $5,431,676.470 $5,111,477.850 $5,481,873.200 $5,674,472.630 $6,469,605.750 $6,786,631.210 $6,831,569.150 $7,061,719.400 $7,644,915.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $15,000.00