BACKFILL (TY B)
|
STA
|
904.300
|
$230.000
|
$350.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,734.000
|
$65.000
|
$66.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
402,940.000
|
$1.500
|
$1.600
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
2,791.000
|
$4.000
|
$6.250
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
35.000
|
$120.000
|
$210.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
52.000
|
$350.000
|
$270.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
738.000
|
$750.000
|
$815.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
2,438.000
|
$55.000
|
$43.200
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$700,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$20,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,568.000
|
$8.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,568.000
|
$2.500
|
$2.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
172,470.000
|
$0.250
|
$0.160
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
12,075.000
|
$30.000
|
$28.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
49.000
|
$2,500.000
|
$2,820.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,600.000
|
$2,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,700.000
|
$3.500
|
$2.200
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
12.000
|
$400.000
|
$360.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
49.000
|
$350.000
|
$360.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
45.000
|
$3,400.000
|
$3,960.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
45.000
|
$330.000
|
$300.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
631.000
|
$36.500
|
$38.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
503.000
|
$36.500
|
$38.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,424.800
|
$7.500
|
$11.700
|
|
|
REMOVE LRSA
|
EA
|
8.000
|
$1,850.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
85.000
|
$50.000
|
$104.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
70.000
|
$23.000
|
$72.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
22.000
|
$75.000
|
$108.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
235.000
|
$21.000
|
$54.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
207,374.000
|
$0.600
|
$0.360
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
186,760.000
|
$0.600
|
$0.360
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,156.000
|
$3.000
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,670.000
|
$3.000
|
$3.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
23,370.000
|
$0.850
|
$0.650
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
94,160.000
|
$0.850
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
93,907.000
|
$0.950
|
$0.650
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
9,157.000
|
$6.500
|
$1.500
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
2,122.000
|
$9.000
|
$9.600
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,897.000
|
$5.500
|
$5.100
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
8,789.100
|
$125.000
|
$140.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
24,609.300
|
$165.000
|
$185.000
|
|
|
TACK COAT
|
GAL
|
40,483.000
|
$5.500
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$18,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
135.000
|
$250.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$500.000
|
$500.000
|
|
Totals: |
$9,406,067.550
|