EXCAVATION (ROADWAY)
|
CY
|
578.000
|
$15.000
|
$31.170
|
$50.000
|
$75.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
19.000
|
$8.000
|
$249.370
|
$50.000
|
$250.000
|
$100.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
AC
|
4.000
|
$2,200.000
|
$1,870.250
|
$5,000.000
|
$2,500.000
|
$3,000.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
4,009.000
|
$1.250
|
$0.750
|
$2.000
|
$1.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
4,009.000
|
$1.250
|
$0.750
|
$2.000
|
$1.000
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
68.000
|
$20.000
|
$62.340
|
$150.000
|
$25.000
|
$49.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
694.000
|
$10.000
|
$22.440
|
$30.000
|
$18.250
|
$20.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
14.000
|
$160.000
|
$1,122.150
|
$3,000.000
|
$500.000
|
$1,000.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
193.000
|
$12.000
|
$57.350
|
$80.000
|
$42.500
|
$80.000
|
|
|
CEM STABIL BKFL
|
CY
|
212.000
|
$250.000
|
$218.200
|
$300.000
|
$500.000
|
$350.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
910.000
|
$300.000
|
$294.980
|
$250.000
|
$400.000
|
$400.000
|
|
|
CL C CONC (ABUT)
|
CY
|
96.000
|
$1,500.000
|
$1,496.200
|
$2,200.000
|
$3,000.000
|
$2,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
72.000
|
$1,800.000
|
$1,870.250
|
$2,200.000
|
$3,000.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
34.000
|
$1,700.000
|
$1,371.520
|
$2,500.000
|
$4,000.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
13,800.000
|
$25.000
|
$43.520
|
$35.000
|
$60.000
|
$40.000
|
|
|
APPROACH SLAB
|
CY
|
122.000
|
$900.000
|
$748.100
|
$1,500.000
|
$1,700.000
|
$1,500.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,486.000
|
$250.000
|
$342.210
|
$330.000
|
$250.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
325.000
|
$650.000
|
$623.420
|
$700.000
|
$1,300.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.000
|
$650.000
|
$872.780
|
$600.000
|
$2,000.000
|
$850.000
|
|
|
RAIL (TY SSTR)
|
LF
|
696.000
|
$200.000
|
$112.220
|
$225.000
|
$250.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
166.000
|
$250.000
|
$218.200
|
$250.000
|
$250.000
|
$200.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$400,000.000
|
$249,366.690
|
$200,000.000
|
$200,000.000
|
$600,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$600,000.000
|
$548,606.710
|
$690,000.000
|
$832,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$18,702.500
|
$35,000.000
|
$20,000.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
57.000
|
$60.000
|
$124.680
|
$1.000
|
$30.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
57.000
|
$15.000
|
$24.940
|
$1.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
264.000
|
$25.000
|
$28.310
|
$1.000
|
$35.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
264.000
|
$10.000
|
$8.920
|
$1.000
|
$15.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,271.000
|
$6.000
|
$9.970
|
$5.000
|
$4.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,271.000
|
$1.500
|
$1.250
|
$2.000
|
$1.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
6,282.000
|
$110.000
|
$94.560
|
$248.000
|
$229.000
|
$325.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,930.000
|
$100.000
|
$81.770
|
$95.000
|
$122.000
|
$125.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
3,000.000
|
$10.000
|
$10.900
|
$20.000
|
$51.000
|
$40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,800.000
|
$7.000
|
$10.900
|
$15.000
|
$44.500
|
$10.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
9,930.000
|
$20.000
|
$10.900
|
$20.000
|
$32.000
|
$40.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
7,717.000
|
$0.500
|
$0.410
|
$1.500
|
$0.750
|
$2.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$30.000
|
$31.170
|
$30.000
|
$27.000
|
$50.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,493.670
|
$1,800.000
|
$2,281.000
|
$3,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$5.000
|
$2.490
|
$5.000
|
$2.000
|
$5.000
|
|
|
CABLE BARRIER SYSTEM (TL-4)
|
LF
|
5,255.000
|
$35.000
|
$18.700
|
$10.000
|
$20.000
|
$75.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-4)
|
EA
|
4.000
|
$12,000.000
|
$3,740.500
|
$6,000.000
|
$5,577.000
|
$5,000.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
5,255.000
|
$4.000
|
$2.490
|
$5.000
|
$4.000
|
$5.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
4.000
|
$750.000
|
$374.050
|
$4,000.000
|
$253.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,740.500
|
$3,000.000
|
$3,042.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$311.710
|
$1,000.000
|
$200.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,500.000
|
$1,870.250
|
$4,000.000
|
$2,535.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
5.000
|
$2,000.000
|
$1,870.250
|
$1,000.000
|
$1,014.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$11,500.000
|
$10,353.700
|
$15,000.000
|
$10,978.000
|
$10,000.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,662.000
|
$2.000
|
$1.250
|
$1.500
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,455.000
|
$2.000
|
$1.250
|
$1.500
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
1.000
|
$500.000
|
$311.710
|
$200.000
|
$202.000
|
$500.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
1.000
|
$1,000.000
|
$935.130
|
$500.000
|
$456.000
|
$500.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,300.000
|
$1.000
|
$0.940
|
$1.000
|
$0.700
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,271.000
|
$1.000
|
$0.940
|
$0.750
|
$0.700
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,848.000
|
$1.000
|
$0.940
|
$0.750
|
$0.700
|
$2.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
14.000
|
$10.000
|
$6.230
|
$8.000
|
$6.000
|
$20.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
115.000
|
$8.000
|
$6.230
|
$8.000
|
$5.000
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
21,419.000
|
$0.720
|
$1.250
|
$1.000
|
$0.700
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (EXIT GORE)
|
EA
|
1.000
|
$225.000
|
$617.180
|
$400.000
|
$404.000
|
$501.180
|
|
|
SP MIXES SP-C PG64-22 (LEVEL-UP)
|
TON
|
95.000
|
$175.000
|
$386.520
|
$300.000
|
$253.000
|
$400.000
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
8.000
|
$200.000
|
$1,122.150
|
$500.000
|
$405.000
|
$400.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
190.000
|
$218.000
|
$357.840
|
$250.000
|
$253.000
|
$400.000
|
|
|
TACK COAT
|
GAL
|
202.000
|
$10.000
|
$5.050
|
$5.000
|
$15.000
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$6,234.170
|
$20,000.000
|
$15,212.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
540.000
|
$300.000
|
$187.030
|
$150.000
|
$253.000
|
$40.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$500.000
|
$311.710
|
$150.000
|
$304.000
|
$500.000
|
|
|
TEMP Q-DETECT SYS
|
EA
|
2.000
|
$200,000.000
|
$89,248.340
|
$125,000.000
|
$114,000.000
|
$90,000.000
|
|
Totals: |
$6,217,446.180
|
$5,593,534.430
|
$7,252,927.250
|
$8,477,102.350
|
$10,217,446.180
|