|
|
PREPARING ROW
|
AC
|
5.700
|
$20,000.000
|
$1,000.000
|
$4,000.000
|
$23,172.360
|
$20,000.000
|
$30,000.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
3,038.000
|
$10.000
|
$10.000
|
$10.000
|
$15.410
|
$25.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,823.000
|
$15.000
|
$10.000
|
$12.000
|
$7.910
|
$40.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
6,013.000
|
$30.000
|
$32.000
|
$15.000
|
$29.290
|
$60.000
|
$42.000
|
|
|
BACKFILL (TY B)
|
STA
|
233.700
|
$175.000
|
$100.000
|
$200.000
|
$384.470
|
$400.000
|
$680.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
14.600
|
$1,100.000
|
$600.000
|
$3,500.000
|
$1,170.250
|
$1,500.000
|
$1,200.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
7.300
|
$800.000
|
$1.000
|
$4,000.000
|
$936.200
|
$800.000
|
$950.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
7.300
|
$800.000
|
$1.000
|
$4,000.000
|
$936.200
|
$800.000
|
$950.000
|
|
|
VEGETATIVE WATERING
|
MG
|
594.200
|
$50.000
|
$1.000
|
$300.000
|
$74.540
|
$33.000
|
$70.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
4,093.000
|
$100.000
|
$85.000
|
$65.000
|
$114.760
|
$175.000
|
$87.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
3,677.000
|
$5.250
|
$0.100
|
$9.000
|
$7.350
|
$8.000
|
$6.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
1,000.000
|
$67.000
|
$90.000
|
$58.000
|
$121.550
|
$100.000
|
$75.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
31,930.000
|
$5.500
|
$1.000
|
$8.000
|
$5.530
|
$7.000
|
$4.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
147,865.000
|
$2.750
|
$0.750
|
$6.000
|
$4.070
|
$3.000
|
$2.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
55.000
|
$625.000
|
$750.000
|
$900.000
|
$760.660
|
$800.000
|
$850.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
8.000
|
$500.000
|
$870.000
|
$4,000.000
|
$924.500
|
$3,500.000
|
$1,650.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
16.000
|
$600.000
|
$975.000
|
$4,000.000
|
$1,035.670
|
$2,500.000
|
$1,700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
57.000
|
$100.000
|
$100.000
|
$425.000
|
$223.520
|
$200.000
|
$115.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
104.000
|
$120.000
|
$135.000
|
$400.000
|
$280.860
|
$250.000
|
$140.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
2.000
|
$15,000.000
|
$11,000.000
|
$12,000.000
|
$11,117.360
|
$30,000.000
|
$13,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,500.000
|
$4,000.000
|
$2,422.410
|
$3,500.000
|
$2,150.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,000.000
|
$2,000.000
|
$4,800.000
|
$3,036.800
|
$4,500.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
11.000
|
$2,500.000
|
$500.000
|
$650.000
|
$1,638.350
|
$2,500.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$5,000.000
|
$6,436.360
|
$4,500.000
|
$1,250.000
|
|
|
REMOV STR (PIPE)
|
EA
|
6.000
|
$800.000
|
$250.000
|
$300.000
|
$1,509.620
|
$3,000.000
|
$500.000
|
|
|
REMOV STR (SMALL)
|
EA
|
4.000
|
$25.000
|
$1,500.000
|
$650.000
|
$1,989.420
|
$2,500.000
|
$2,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,000.000
|
$730,000.000
|
$675,000.000
|
$774,754.670
|
$1,000,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$8,000.000
|
$13,000.000
|
$5,000.000
|
$6,996.470
|
$25,000.000
|
$20,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
15,262.000
|
$6.000
|
$0.010
|
$3.000
|
$5.030
|
$5.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
15,262.000
|
$2.000
|
$0.010
|
$1.400
|
$0.350
|
$0.500
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,280.000
|
$9.000
|
$4.000
|
$8.000
|
$7.020
|
$7.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,280.000
|
$2.500
|
$1.000
|
$4.000
|
$1.510
|
$1.500
|
$1.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
947.000
|
$85.000
|
$50.000
|
$42.000
|
$104.240
|
$60.000
|
$105.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
491.000
|
$50.000
|
$50.000
|
$28.000
|
$97.590
|
$55.000
|
$75.000
|
|
|
TURNOUTS (ACP)
|
SY
|
134.000
|
$90.000
|
$75.000
|
$46.000
|
$143.470
|
$120.000
|
$220.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
73,000.000
|
$0.200
|
$0.200
|
$1.000
|
$0.130
|
$0.300
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
36,860.000
|
$0.200
|
$0.260
|
$1.000
|
$0.130
|
$0.250
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$30.000
|
$27.000
|
$30.000
|
$31.010
|
$32.000
|
$31.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
3.000
|
$2,000.000
|
$1,350.000
|
$1,650.000
|
$1,755.370
|
$1,700.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
275.000
|
$3.500
|
$2.500
|
$5.000
|
$2.340
|
$2.500
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,000.000
|
$6,550.000
|
$3,949.590
|
$4,000.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$330.000
|
$250.000
|
$300.000
|
$234.050
|
$250.000
|
$250.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$250.000
|
$200.000
|
$335.000
|
$251.600
|
$350.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$900.000
|
$850.000
|
$1,050.000
|
$930.350
|
$1,100.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$900.000
|
$950.000
|
$1,300.000
|
$1,249.830
|
$1,200.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
9.000
|
$600.000
|
$990.000
|
$1,500.000
|
$1,364.510
|
$1,300.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
33.000
|
$375.000
|
$570.000
|
$700.000
|
$574.590
|
$750.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
8.000
|
$440.000
|
$620.000
|
$820.000
|
$692.790
|
$850.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
29.000
|
$200.000
|
$100.000
|
$115.000
|
$227.700
|
$150.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
23.000
|
$60.000
|
$35.000
|
$100.000
|
$55.590
|
$55.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
21.000
|
$70.000
|
$90.000
|
$150.000
|
$90.110
|
$150.000
|
$150.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
288.000
|
$11.000
|
$5.000
|
$10.000
|
$5.850
|
$10.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
73,300.000
|
$1.000
|
$0.500
|
$1.000
|
$0.590
|
$1.150
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,740.000
|
$1.750
|
$1.000
|
$1.000
|
$2.370
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,194.000
|
$2.000
|
$1.000
|
$2.000
|
$1.290
|
$1.750
|
$1.250
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,080.000
|
$1.000
|
$0.500
|
$2.000
|
$0.610
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
74,800.000
|
$0.850
|
$0.500
|
$1.500
|
$0.610
|
$1.000
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
73,720.000
|
$0.850
|
$0.500
|
$1.500
|
$0.610
|
$1.000
|
$0.850
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
130.000
|
$18.000
|
$18.000
|
$10.000
|
$21.060
|
$15.000
|
$21.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$275.000
|
$225.000
|
$1,800.000
|
$263.310
|
$225.000
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
8.000
|
$60.000
|
$25.000
|
$1,800.000
|
$29.260
|
$105.000
|
$90.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
305.000
|
$5.000
|
$4.000
|
$6.000
|
$4.680
|
$5.250
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
922.000
|
$6.500
|
$4.000
|
$6.000
|
$4.680
|
$5.250
|
$6.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
3,035.000
|
$150.000
|
$165.000
|
$150.000
|
$184.290
|
$180.000
|
$160.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
28,736.000
|
$150.000
|
$152.000
|
$150.000
|
$171.900
|
$153.000
|
$205.000
|
|
|
TACK COAT
|
GAL
|
24,904.000
|
$6.000
|
$6.000
|
$10.000
|
$5.700
|
$6.000
|
$0.010
|
|
|
TMA (STATIONARY)
|
DAY
|
102.000
|
$300.000
|
$1.000
|
$250.000
|
$311.090
|
$500.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$600.000
|
$1.000
|
$500.000
|
$735.760
|
$700.000
|
$850.000
|
|
Totals: |
$8,134,561.000
|
$7,369,772.590
|
$8,948,612.800
|
$9,314,405.249
|
$10,098,624.350
|
$10,642,773.540
|