PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
22.000
|
$1,200.000
|
$923.000
|
$500.000
|
$1,972.910
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
14.000
|
$2,500.000
|
$2,260.000
|
$2,000.000
|
$1,972.910
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
2.000
|
$3,000.000
|
$3,560.000
|
$2,000.000
|
$1,972.910
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
852.000
|
$120.000
|
$30.600
|
$60.000
|
$15.780
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,339.000
|
$30.000
|
$30.100
|
$45.000
|
$25.150
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,650.000
|
$40.000
|
$36.200
|
$45.000
|
$39.460
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
12.000
|
$21.000
|
$110.000
|
$100.000
|
$197.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
3,819.000
|
$0.200
|
$0.570
|
$2.000
|
$1.360
|
|
|
VEGETATIVE WATERING
|
MG
|
25.000
|
$200.000
|
$74.000
|
$1.000
|
$197.290
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
3,819.000
|
$5.000
|
$2.950
|
$3.000
|
$2.450
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
356.000
|
$70.000
|
$113.000
|
$150.000
|
$50.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
788.000
|
$9.000
|
$20.900
|
$20.000
|
$4.750
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
1,308.000
|
$8.000
|
$16.600
|
$20.000
|
$3.360
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,135.000
|
$7.000
|
$14.200
|
$20.000
|
$3.620
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
14.000
|
$160.000
|
$418.000
|
$1,800.000
|
$154.200
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
39.000
|
$180.000
|
$1,350.000
|
$1,500.000
|
$110.900
|
|
|
CEM STABIL BKFL
|
CY
|
147.000
|
$370.000
|
$509.000
|
$300.000
|
$394.580
|
|
|
TEMPORARY SPL SHORING
|
SF
|
830.000
|
$55.000
|
$117.000
|
$85.000
|
$98.650
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
438.000
|
$400.000
|
$451.000
|
$300.000
|
$1,035.650
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
53.600
|
$2,600.000
|
$2,870.000
|
$2,800.000
|
$3,760.420
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
41.000
|
$2,700.000
|
$2,970.000
|
$2,800.000
|
$4,914.490
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
24.000
|
$2,760.000
|
$3,010.000
|
$2,800.000
|
$2,564.780
|
|
|
REINF CONC SLAB
|
SF
|
9,890.000
|
$38.000
|
$43.700
|
$55.000
|
$69.050
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$1,850.000
|
$1,280.000
|
$1,500.000
|
$1,381.040
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,281.000
|
$320.000
|
$223.000
|
$325.000
|
$442.360
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
1,589.000
|
$18.000
|
$18.800
|
$10.000
|
$78.820
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
603.000
|
$290.000
|
$342.000
|
$200.000
|
$352.690
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
80.000
|
$700.000
|
$1,290.000
|
$700.000
|
$1,282.390
|
|
|
RAIL (TY SSTR)
|
LF
|
478.000
|
$165.000
|
$163.000
|
$200.000
|
$157.830
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
92.000
|
$280.000
|
$430.000
|
$200.000
|
$386.690
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$260,000.000
|
$232,000.000
|
$300,000.000
|
$155,859.740
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$288,393.380
|
$384,000.000
|
$295,000.000
|
$443,904.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$12,000.000
|
$6,580.000
|
$22,000.000
|
$49,322.700
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
127.000
|
$45.000
|
$90.000
|
$1.000
|
$35.820
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
127.000
|
$38.000
|
$23.300
|
$1.000
|
$8.570
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$34.000
|
$57.000
|
$1.000
|
$197.290
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$14.000
|
$13.800
|
$1.000
|
$19.730
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
958.000
|
$6.000
|
$10.700
|
$5.000
|
$3.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
958.000
|
$3.500
|
$3.050
|
$1.000
|
$1.160
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$6,500.000
|
$12,100.000
|
$6,000.000
|
$3,184.570
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
840.000
|
$120.000
|
$114.000
|
$100.000
|
$187.430
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$15.000
|
$12.700
|
$50.000
|
$29.590
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$21.000
|
$15.200
|
$50.000
|
$39.460
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$32.000
|
$37.000
|
$30.000
|
$50.310
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$3,110.000
|
$2,000.000
|
$4,143.110
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
383.000
|
$5.000
|
$3.110
|
$4.000
|
$3.950
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$361.000
|
$500.000
|
$394.580
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,700.000
|
$4,450.000
|
$3,000.000
|
$6,855.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$360.000
|
$404.000
|
$500.000
|
$394.580
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,100.000
|
$1,660.000
|
$3,000.000
|
$4,932.270
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$1,450.000
|
$1,000.000
|
$2,959.360
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$16,700.000
|
$12,000.000
|
$13,254.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$950.000
|
$1,950.000
|
$1,200.000
|
$1,471.790
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$140.000
|
$262.000
|
$500.000
|
$246.610
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$50.000
|
$79.000
|
$50.000
|
$49.320
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$40.000
|
$78.000
|
$50.000
|
$49.320
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$181.000
|
$25.000
|
$11.840
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,768.000
|
$0.970
|
$2.430
|
$4.000
|
$1.360
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,880.000
|
$3.000
|
$2.090
|
$3.000
|
$3.260
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,880.000
|
$1.000
|
$1.970
|
$3.000
|
$3.260
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
24.000
|
$5.500
|
$144.000
|
$25.000
|
$15.780
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,760.000
|
$1.000
|
$1.110
|
$2.000
|
$1.480
|
|
|
TMA (STATIONARY)
|
DAY
|
3.000
|
$260.000
|
$806.000
|
$200.000
|
$354.580
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
3.000
|
$400.000
|
$936.000
|
$200.000
|
$1,479.680
|
|
Totals: |
$3,172,327.140
|
$3,377,698.150
|
$3,499,410.000
|
$4,642,822.426
|