|
|
PREPARING ROW
|
STA
|
562.420
|
$300.000
|
$500.000
|
$96.000
|
$500.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
165.000
|
$10.000
|
$40.650
|
$33.300
|
$35.000
|
$20.000
|
$30.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
220.000
|
$20.000
|
$63.650
|
$45.000
|
$25.000
|
$20.000
|
$30.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
11,668.000
|
$20.000
|
$31.300
|
$22.750
|
$15.000
|
$20.000
|
$30.000
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
5,680.000
|
$10.000
|
$11.000
|
$8.000
|
$5.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
15,129.000
|
$10.000
|
$11.000
|
$8.000
|
$5.500
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
10,842.000
|
$20.000
|
$31.050
|
$11.000
|
$12.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
170.000
|
$15.000
|
$26.150
|
$28.000
|
$35.000
|
$20.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
9,245.000
|
$15.000
|
$9.250
|
$9.750
|
$10.000
|
$20.000
|
$20.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
3,773.000
|
$15.000
|
$2.400
|
$22.000
|
$25.000
|
$20.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
138.000
|
$25.000
|
$9.700
|
$6.750
|
$63.000
|
$30.000
|
$20.000
|
|
|
BLOCK SODDING
|
SY
|
23,178.000
|
$3.000
|
$5.750
|
$5.500
|
$5.650
|
$6.000
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1.620
|
$1,000.000
|
$36.050
|
$34.500
|
$1,500.000
|
$2,000.000
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,234.000
|
$5.000
|
$4.750
|
$8.000
|
$5.000
|
$8.000
|
$5.000
|
|
|
D-GR HMA(SQ) TY-D SAC-A PG64-22
|
TON
|
464.000
|
$100.000
|
$105.000
|
$380.000
|
$150.000
|
$165.000
|
$200.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
394.000
|
$80.000
|
$102.500
|
$70.000
|
$40.000
|
$85.000
|
$100.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
16.000
|
$500.000
|
$206.200
|
$450.000
|
$650.000
|
$650.000
|
$600.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
1.000
|
$650.000
|
$193.600
|
$665.000
|
$650.000
|
$1,500.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
9.000
|
$500.000
|
$163.400
|
$475.000
|
$650.000
|
$550.000
|
$600.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
172.000
|
$150.000
|
$107.350
|
$125.000
|
$115.000
|
$185.000
|
$400.000
|
|
|
GRATE & FRAME
|
EA
|
15.000
|
$1,000.000
|
$2,150.000
|
$950.000
|
$512.000
|
$5,000.000
|
$2,500.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
15.000
|
$1,000.000
|
$3,080.000
|
$712.000
|
$400.000
|
$2,500.000
|
$1,200.000
|
|
|
ADJUSTING INLETS
|
EA
|
4.000
|
$2,000.000
|
$1,460.000
|
$902.000
|
$400.000
|
$2,500.000
|
$1,500.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
25.000
|
$650.000
|
$640.000
|
$617.000
|
$250.000
|
$750.000
|
$800.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
8.000
|
$500.000
|
$640.000
|
$917.000
|
$250.000
|
$750.000
|
$800.000
|
|
|
ADJUSTING MANHOLES (IRRIGATION BOX)
|
EA
|
1.000
|
$700.000
|
$640.000
|
$760.000
|
$600.000
|
$750.000
|
$800.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
5.000
|
$100.000
|
$800.000
|
$95.000
|
$125.000
|
$1,000.000
|
$300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$574,011.100
|
$800,000.000
|
$459,000.000
|
$200,000.000
|
$800,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$2,500.000
|
$2,500.000
|
$7,060.000
|
$100.000
|
$8,500.000
|
$7,999.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
395.000
|
$5.000
|
$5.850
|
$5.500
|
$0.010
|
$10.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
39,723.000
|
$3.000
|
$3.950
|
$3.300
|
$0.010
|
$4.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
39,723.000
|
$1.000
|
$1.050
|
$0.950
|
$0.010
|
$2.000
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,035.000
|
$5.000
|
$5.850
|
$4.250
|
$0.010
|
$19.000
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,035.000
|
$1.000
|
$1.050
|
$0.950
|
$0.010
|
$9.000
|
$0.500
|
|
|
LANDSCAPE PAVERS
|
SY
|
40.000
|
$60.000
|
$105.600
|
$95.000
|
$95.000
|
$125.000
|
$100.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
524.000
|
$100.000
|
$73.200
|
$161.000
|
$40.000
|
$125.000
|
$500.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
8,093.000
|
$20.000
|
$14.300
|
$19.000
|
$30.000
|
$40.000
|
$30.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
19,954.000
|
$70.000
|
$43.700
|
$60.000
|
$80.000
|
$75.000
|
$75.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
26,684.000
|
$60.000
|
$31.800
|
$50.000
|
$80.000
|
$55.000
|
$60.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
4,141.000
|
$70.000
|
$40.200
|
$55.000
|
$80.000
|
$65.000
|
$60.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
430.000
|
$100.000
|
$55.000
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
365.000
|
$100.000
|
$55.200
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
249.000
|
$120.000
|
$68.500
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
781.000
|
$120.000
|
$45.500
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
923.000
|
$120.000
|
$44.000
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
355.000
|
$100.000
|
$56.600
|
$160.000
|
$80.000
|
$200.000
|
$200.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
55.000
|
$200.000
|
$35.450
|
$190.000
|
$175.000
|
$85.000
|
$500.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
202.000
|
$200.000
|
$33.500
|
$170.000
|
$175.000
|
$105.000
|
$500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$30.000
|
$36.160
|
$57.000
|
$40.000
|
$25.000
|
$40.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,500.000
|
$2,074.420
|
$1,425.000
|
$1,000.000
|
$1,850.000
|
$1,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
154.000
|
$10.000
|
$8.130
|
$7.600
|
$3.000
|
$3.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$1,000.000
|
$840.980
|
$475.000
|
$195.000
|
$650.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,500.000
|
$3,195.730
|
$2,375.000
|
$3,000.000
|
$2,850.000
|
$3,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
3.000
|
$500.000
|
$897.040
|
$475.000
|
$500.000
|
$650.000
|
$400.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
21.000
|
$200.000
|
$448.520
|
$166.000
|
$190.000
|
$650.000
|
$400.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$250.000
|
$728.850
|
$280.000
|
$325.000
|
$650.000
|
$400.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
19.000
|
$1,000.000
|
$1,065.240
|
$1,055.000
|
$825.000
|
$1,000.000
|
$800.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,200.000
|
$1,491.340
|
$1,475.000
|
$1,100.000
|
$1,200.000
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
21.000
|
$200.000
|
$291.540
|
$290.000
|
$150.000
|
$250.000
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
124.000
|
$500.000
|
$476.560
|
$570.000
|
$300.000
|
$650.000
|
$400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
25.000
|
$50.000
|
$140.160
|
$66.500
|
$70.000
|
$250.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
6.000
|
$30.000
|
$95.310
|
$26.500
|
$30.000
|
$100.000
|
$25.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,326.000
|
$5.000
|
$4.930
|
$5.000
|
$5.000
|
$6.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,904.000
|
$10.000
|
$9.870
|
$9.750
|
$10.000
|
$10.000
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$150.000
|
$106.530
|
$105.500
|
$150.000
|
$250.000
|
$250.000
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
5,326.000
|
$3.000
|
$1.120
|
$1.150
|
$1.000
|
$5.000
|
$3.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,904.000
|
$5.000
|
$2.240
|
$2.250
|
$2.000
|
$8.000
|
$5.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
6.000
|
$50.000
|
$39.250
|
$39.000
|
$200.000
|
$250.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
4,430.000
|
$3.000
|
$2.240
|
$2.250
|
$3.000
|
$5.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,842.000
|
$3.000
|
$4.490
|
$4.450
|
$6.000
|
$8.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$50.000
|
$89.710
|
$89.000
|
$100.000
|
$250.000
|
$80.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
5,326.000
|
$1.000
|
$0.670
|
$0.750
|
$0.600
|
$3.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,904.000
|
$1.000
|
$1.350
|
$1.500
|
$1.300
|
$6.000
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$10.000
|
$11.210
|
$11.250
|
$50.000
|
$250.000
|
$10.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
14.000
|
$1,000.000
|
$263.510
|
$260.000
|
$600.000
|
$1,800.000
|
$1,000.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
14.000
|
$100.000
|
$72.890
|
$72.000
|
$50.000
|
$650.000
|
$500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
4.000
|
$1,000.000
|
$1,889.400
|
$1,870.000
|
$1,500.000
|
$1,500.000
|
$2,500.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
11.000
|
$1,100.000
|
$2,113.660
|
$2,092.000
|
$1,750.000
|
$1,800.000
|
$3,500.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
3.000
|
$1,200.000
|
$2,337.920
|
$2,315.000
|
$2,000.000
|
$2,000.000
|
$3,000.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
3.000
|
$1,300.000
|
$2,562.190
|
$2,537.000
|
$2,000.000
|
$3,000.000
|
$4,500.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
3.000
|
$1,500.000
|
$2,786.440
|
$2,760.000
|
$2,500.000
|
$5,000.000
|
$6,000.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
2.000
|
$100.000
|
$242.770
|
$380.000
|
$500.000
|
$5,000.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
355.000
|
$250.000
|
$500.000
|
$650.000
|
$20.000
|
$250.000
|
$200.000
|
|
Totals: |
$6,314,122.100
|
$5,394,454.041
|
$5,990,608.410
|
$6,252,016.110
|
$8,141,516.000
|
$8,611,857.200
|