|
|
DRILL SHAFT (24 IN)
|
LF
|
120.000
|
$230.000
|
$283.000
|
$120.000
|
$210.000
|
$311.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
60.000
|
$265.000
|
$326.690
|
$290.000
|
$340.000
|
$488.450
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
88.000
|
$550.000
|
$417.630
|
$750.000
|
$480.000
|
$789.300
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$90,000.000
|
$100,542.490
|
$85,500.000
|
$103,400.000
|
$88,135.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$9,538.730
|
$3,000.000
|
$6,700.000
|
$2,232.000
|
|
|
TMA (STATIONARY)
|
DAY
|
71.000
|
$100.000
|
$0.010
|
$200.000
|
$60.000
|
$265.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
160.000
|
$5.000
|
$0.010
|
$12.000
|
$5.000
|
$11.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
160.000
|
$1.320
|
$0.010
|
$1.250
|
$1.500
|
$4.400
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
50.000
|
$190.000
|
$319.040
|
$150.000
|
$120.000
|
$329.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
163.000
|
$62.000
|
$102.580
|
$125.000
|
$92.000
|
$102.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
12.000
|
$2,000.000
|
$2,120.490
|
$3,800.000
|
$2,700.000
|
$3,257.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
835.000
|
$14.000
|
$6.390
|
$10.000
|
$17.000
|
$15.550
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
780.000
|
$25.000
|
$9.070
|
$18.000
|
$20.000
|
$23.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
165.000
|
$17.000
|
$32.740
|
$30.000
|
$32.000
|
$35.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
715.000
|
$35.000
|
$21.150
|
$38.000
|
$40.000
|
$46.400
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,005.000
|
$1.800
|
$4.020
|
$1.200
|
$1.950
|
$1.600
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
65.000
|
$2.250
|
$13.480
|
$1.500
|
$2.250
|
$1.900
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
560.000
|
$2.300
|
$7.130
|
$1.600
|
$2.450
|
$2.400
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
1,945.000
|
$2.800
|
$5.070
|
$2.000
|
$2.950
|
$3.550
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
18.000
|
$1,200.000
|
$2,502.040
|
$990.000
|
$1,200.000
|
$1,113.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,500.000
|
$3,682.160
|
$1,150.000
|
$1,600.000
|
$1,166.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/16")
|
LF
|
950.000
|
$5.000
|
$4.740
|
$1.500
|
$3.100
|
$1.900
|
|
|
ZINC-COAT STL WIRE STRAND (5/16")
|
LF
|
475.000
|
$4.000
|
$5.860
|
$2.000
|
$3.100
|
$2.400
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
3.000
|
$500.000
|
$1,081.340
|
$450.000
|
$270.000
|
$1,659.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TP(O)
|
EA
|
1.000
|
$4,000.000
|
$5,178.000
|
$3,500.000
|
$4,800.000
|
$6,043.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
|
EA
|
1.000
|
$3,150.000
|
$5,178.000
|
$2,150.000
|
$3,700.000
|
$4,008.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
140.000
|
$35.000
|
$23.400
|
$65.000
|
$38.000
|
$61.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$940.000
|
$1,174.750
|
$985.000
|
$930.000
|
$987.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,180.000
|
$1,174.500
|
$1,500.000
|
$1,400.000
|
$1,541.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$80.000
|
$254.000
|
$220.000
|
$200.000
|
$96.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(060MIL)
|
LF
|
2,055.000
|
$0.700
|
$5.080
|
$3.000
|
$2.000
|
$2.220
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,280.000
|
$1.000
|
$5.080
|
$3.000
|
$2.500
|
$2.220
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
14.000
|
$40.000
|
$38.100
|
$60.000
|
$45.000
|
$72.220
|
|
REFL PAV MRK TY I (Y)12"(SLD)(060MIL)
|
LF
|
720.000
|
$2.000
|
$2.540
|
$7.500
|
$4.000
|
$4.440
|
|
|
PAVEMENT SLER 6"
|
LF
|
5,740.000
|
$0.500
|
$5.080
|
$0.300
|
$0.700
|
$0.700
|
|
|
PAVEMENT SLER 8"
|
LF
|
1,280.000
|
$1.000
|
$5.080
|
$0.600
|
$0.800
|
$1.100
|
|
|
PAVEMENT SLER 24"
|
LF
|
1,057.000
|
$2.500
|
$5.080
|
$1.200
|
$2.000
|
$4.440
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
12.000
|
$20.000
|
$38.100
|
$12.000
|
$15.000
|
$66.700
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
16.000
|
$20.000
|
$38.100
|
$12.000
|
$25.000
|
$66.700
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
4.000
|
$35.000
|
$38.100
|
$25.000
|
$25.000
|
$133.000
|
|
|
PAVEMENT SLER (UTURN ARROW)
|
EA
|
4.000
|
$30.000
|
$38.100
|
$25.000
|
$25.000
|
$66.700
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
14.000
|
$20.000
|
$38.100
|
$7.000
|
$15.000
|
$50.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(060MIL)
|
LF
|
1,260.000
|
$0.500
|
$1.270
|
$0.900
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,000.000
|
$0.650
|
$1.270
|
$0.900
|
$2.000
|
$1.500
|
|
REFL PAV MRK TY I (W)6"(SLD)(060MIL)
|
LF
|
1,940.000
|
$0.500
|
$1.270
|
$0.900
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
2,000.000
|
$1.000
|
$1.270
|
$0.900
|
$2.000
|
$12.600
|
|
REFL PAV MRK TY I (Y)6"(BRK)(060MIL)
|
LF
|
3,560.000
|
$0.500
|
$1.270
|
$0.800
|
$1.100
|
$1.500
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,740.000
|
$1.000
|
$1.270
|
$0.900
|
$2.000
|
$1.500
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
1,057.000
|
$17.000
|
$1.270
|
$14.000
|
$16.000
|
$25.550
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
21.000
|
$180.000
|
$63.500
|
$300.000
|
$150.000
|
$500.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
8.000
|
$310.000
|
$63.250
|
$380.000
|
$330.000
|
$1,000.000
|
|
PREFAB PM TY C (W)(UTURN ARROW)
|
EA
|
4.000
|
$350.000
|
$63.500
|
$480.000
|
$350.000
|
$533.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
25.000
|
$240.000
|
$63.500
|
$300.000
|
$250.000
|
$516.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
110.000
|
$5.000
|
$5.080
|
$6.000
|
$7.500
|
$11.110
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
354.000
|
$5.000
|
$6.350
|
$6.500
|
$7.500
|
$11.110
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
154.000
|
$4.500
|
$6.350
|
$7.000
|
$7.500
|
$11.110
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
5,600.000
|
$0.380
|
$0.250
|
$1.000
|
$0.500
|
$0.900
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
1,280.000
|
$0.750
|
$0.250
|
$1.400
|
$0.600
|
$1.110
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
168.000
|
$2.000
|
$0.250
|
$5.000
|
$0.850
|
$3.330
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
877.000
|
$2.900
|
$0.250
|
$8.000
|
$3.000
|
$6.700
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
21.000
|
$50.000
|
$25.400
|
$85.000
|
$50.000
|
$88.900
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
8.000
|
$55.000
|
$25.400
|
$210.000
|
$50.000
|
$177.800
|
|
|
ELIM EXT PM & MRKS (UTURN ARROW)
|
EA
|
4.000
|
$68.000
|
$25.400
|
$190.000
|
$50.000
|
$111.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
25.000
|
$40.000
|
$25.400
|
$85.000
|
$50.000
|
$90.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,740.000
|
$0.150
|
$0.640
|
$0.160
|
$0.100
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,280.000
|
$0.300
|
$0.640
|
$0.300
|
$0.150
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,057.000
|
$1.300
|
$0.640
|
$0.600
|
$0.300
|
$2.300
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
21.000
|
$27.000
|
$38.100
|
$7.000
|
$25.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$43.000
|
$38.100
|
$15.000
|
$25.000
|
$94.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
4.000
|
$30.000
|
$38.100
|
$15.000
|
$25.000
|
$72.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$33.000
|
$38.100
|
$7.000
|
$25.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
14.000
|
$11.000
|
$38.100
|
$7.000
|
$25.000
|
$50.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$20,000.000
|
$27,916.510
|
$32,500.000
|
$32,650.000
|
$34,222.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$3,400.000
|
$3,244.010
|
$2,850.000
|
$3,000.000
|
$5,641.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
26.000
|
$330.000
|
$253.110
|
$350.000
|
$310.000
|
$255.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$330.000
|
$257.270
|
$350.000
|
$310.000
|
$255.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
26.000
|
$330.000
|
$240.630
|
$350.000
|
$310.000
|
$255.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
12.000
|
$330.000
|
$243.750
|
$350.000
|
$310.000
|
$255.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
26.000
|
$330.000
|
$240.630
|
$350.000
|
$310.000
|
$255.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
6.000
|
$335.000
|
$257.270
|
$350.000
|
$310.000
|
$255.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
20.000
|
$800.000
|
$668.750
|
$510.000
|
$740.000
|
$614.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)
|
EA
|
6.000
|
$225.000
|
$521.250
|
$185.000
|
$190.000
|
$211.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)
|
EA
|
26.000
|
$180.000
|
$438.920
|
$120.000
|
$150.000
|
$184.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
4,550.000
|
$2.250
|
$2.160
|
$1.450
|
$1.700
|
$1.800
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
7,220.000
|
$3.000
|
$3.280
|
$2.400
|
$3.200
|
$2.850
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,390.000
|
$3.000
|
$4.870
|
$2.850
|
$3.950
|
$3.500
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
4.000
|
$13,500.000
|
$11,703.790
|
$12,500.000
|
$13,100.000
|
$10,098.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
2.000
|
$40,000.000
|
$40,105.540
|
$35,800.000
|
$38,600.000
|
$35,104.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
|
EA
|
2.000
|
$50,000.000
|
$43,007.490
|
$41,750.000
|
$44,200.000
|
$36,591.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
20.000
|
$2,300.000
|
$1,067.350
|
$1,100.000
|
$1,200.000
|
$3,799.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$980.000
|
$827.500
|
$860.000
|
$870.000
|
$851.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$4,000.000
|
$3,569.800
|
$3,250.000
|
$3,400.000
|
$4,421.000
|
|
|
REMOVAL OF PEDESTRIAN RAMPS
|
EA
|
8.000
|
$710.000
|
$604.480
|
$1,150.000
|
$760.000
|
$1,428.000
|
|
|
RVDS (PRESENCE DETECTION ONLY)
|
EA
|
4.000
|
$8,800.000
|
$2,038.900
|
$7,850.000
|
$7,400.000
|
$5,530.000
|
|
|
RVDS (ADVANCE DETECTION ONLY)
|
EA
|
4.000
|
$9,500.000
|
$1,721.400
|
$9,500.000
|
$7,400.000
|
$5,530.000
|
|
|
RVDS (PRESENCE AND ADVANCE DETECTION)
|
EA
|
4.000
|
$11,500.000
|
$2,001.000
|
$9,500.000
|
$7,400.000
|
$5,530.000
|
|
Totals: |
$1,035,935.350
|
$1,004,819.780
|
$1,021,939.500
|
$1,034,487.650
|
$1,165,645.830
|