|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,526.000
|
$6.000
|
$9.000
|
$18.000
|
$10.000
|
$4.250
|
$11.000
|
$4.000
|
$9.950
|
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
200.000
|
$14.000
|
$5.000
|
$6.000
|
$3.000
|
$6.700
|
$10.000
|
$5.000
|
$4.500
|
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
10.000
|
$125.000
|
$260.000
|
$200.000
|
$150.000
|
$80.000
|
$550.000
|
$275.000
|
$146.000
|
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
100.000
|
$4.000
|
$14.000
|
$19.000
|
$10.000
|
$19.500
|
$30.000
|
$17.000
|
$10.500
|
|
|
|
RMV STAB BASE & ASPH PV (17")
|
SY
|
43,513.000
|
$3.000
|
$4.500
|
$4.000
|
$9.250
|
$4.500
|
$7.750
|
$9.000
|
$6.250
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,960.000
|
$2.500
|
$9.000
|
$10.000
|
$10.000
|
$12.000
|
$5.000
|
$8.000
|
$8.750
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
960.000
|
$3.500
|
$7.000
|
$12.000
|
$12.000
|
$13.800
|
$5.000
|
$10.000
|
$6.150
|
|
|
|
BACKFILL (TY A)
|
STA
|
132.000
|
$110.000
|
$225.000
|
$160.000
|
$550.000
|
$206.000
|
$150.000
|
$288.000
|
$153.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$20.000
|
$35.000
|
$25.000
|
$120.000
|
$33.000
|
$40.000
|
$29.000
|
$34.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
2.440
|
$1,200.000
|
$1,500.000
|
$1,400.000
|
$550.000
|
$1,780.000
|
$1,500.000
|
$743.000
|
$1,710.000
|
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
2.440
|
$700.000
|
$1,400.000
|
$1,300.000
|
$570.000
|
$1,650.000
|
$1,400.000
|
$764.000
|
$1,590.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,000.000
|
$5.000
|
$30.000
|
$24.000
|
$15.000
|
$30.000
|
$20.000
|
$27.000
|
$23.750
|
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,000.000
|
$1.000
|
$30.000
|
$1.000
|
$20.000
|
$70.000
|
$1.000
|
$11.000
|
$23.750
|
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$35.000
|
$75.000
|
$75.000
|
$60.000
|
$30.000
|
$50.000
|
$45.000
|
$50.000
|
|
|
|
CM TRT(PT MX)(CL M)(TYA)(GR1-2)(FN POS)
|
CY
|
19,821.000
|
$67.000
|
$52.000
|
$52.500
|
$21.000
|
$65.000
|
$60.000
|
$76.000
|
$83.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,194.000
|
$3.250
|
$3.500
|
$4.000
|
$4.750
|
$4.250
|
$3.450
|
$3.000
|
$4.180
|
|
|
|
ASPH (SPG 73-19)
|
GAL
|
15,720.000
|
$2.500
|
$2.750
|
$4.000
|
$3.750
|
$4.500
|
$3.000
|
$3.000
|
$3.720
|
|
|
|
AGGR (TY-PD GR-4P)(SAC-B)
|
CY
|
450.000
|
$67.000
|
$105.000
|
$65.000
|
$120.000
|
$125.000
|
$75.000
|
$112.000
|
$103.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
8,200.000
|
$80.000
|
$69.800
|
$81.000
|
$95.000
|
$91.000
|
$80.000
|
$92.000
|
$105.000
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
1,200.000
|
$1.000
|
$9.000
|
$7.000
|
$10.000
|
$3.200
|
$3.000
|
$3.000
|
$1.850
|
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,800.000
|
$1.700
|
$9.000
|
$5.000
|
$8.500
|
$3.200
|
$3.000
|
$3.000
|
$1.750
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$450.000
|
$250.000
|
$500.000
|
$425.000
|
$320.000
|
$450.000
|
$339.000
|
$450.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
182.000
|
$900.000
|
$650.000
|
$600.000
|
$350.000
|
$900.000
|
$785.000
|
$833.000
|
$762.000
|
|
|
|
REMOV STR (SET)
|
EA
|
186.000
|
$225.000
|
$115.000
|
$220.000
|
$200.000
|
$200.000
|
$150.000
|
$335.000
|
$143.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
3,432.000
|
$8.000
|
$6.500
|
$19.000
|
$10.000
|
$10.000
|
$11.000
|
$4.000
|
$7.800
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$266,000.000
|
$343,434.000
|
$310,000.000
|
$345,000.000
|
$60,000.000
|
$375,000.000
|
$270,000.000
|
$435,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$3,500.000
|
$5,750.000
|
$4,500.000
|
$1,850.000
|
$5,000.000
|
$3,000.000
|
$5,513.000
|
$8,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
40.000
|
$40.000
|
$80.000
|
$78.000
|
$25.000
|
$95.000
|
$55.000
|
$100.000
|
$22.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$10.000
|
$25.000
|
$24.000
|
$5.000
|
$30.000
|
$25.000
|
$31.000
|
$11.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
1,882.280
|
$20.000
|
$20.000
|
$21.000
|
$12.000
|
$25.000
|
$15.000
|
$10.000
|
$14.500
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,882.280
|
$7.000
|
$8.000
|
$9.000
|
$5.000
|
$9.000
|
$3.000
|
$11.000
|
$8.250
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,150.000
|
$2.500
|
$3.250
|
$4.000
|
$4.000
|
$3.900
|
$4.250
|
$0.600
|
$2.100
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,150.000
|
$0.700
|
$0.650
|
$1.000
|
$1.000
|
$0.750
|
$1.200
|
$1.000
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,160.000
|
$2.500
|
$3.500
|
$4.000
|
$7.000
|
$4.100
|
$3.750
|
$4.000
|
$3.500
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,160.000
|
$0.700
|
$0.500
|
$1.000
|
$1.000
|
$0.600
|
$0.500
|
$1.000
|
$1.000
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
200.000
|
$25.000
|
$26.000
|
$25.000
|
$12.000
|
$23.000
|
$21.500
|
$29.000
|
$14.500
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,526.000
|
$50.000
|
$47.000
|
$44.000
|
$55.000
|
$36.500
|
$53.000
|
$40.000
|
$62.500
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
6,690.000
|
$27.500
|
$24.000
|
$26.000
|
$32.000
|
$18.000
|
$28.000
|
$15.000
|
$25.000
|
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$1,800.000
|
$455.000
|
$1,550.000
|
$1,500.000
|
$700.000
|
$1,750.000
|
$1,100.000
|
$1,010.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$19.000
|
$26.000
|
$29.000
|
$15.000
|
$30.000
|
$35.000
|
$30.000
|
$29.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,000.000
|
$2,400.000
|
$3,500.000
|
$1,350.000
|
$2,950.000
|
$3,000.000
|
$3,300.000
|
$2,790.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
42.000
|
$180.000
|
$165.000
|
$200.000
|
$200.000
|
$215.000
|
$400.000
|
$222.000
|
$201.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
9.000
|
$180.000
|
$200.000
|
$225.000
|
$195.000
|
$280.000
|
$400.000
|
$285.000
|
$218.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$300.000
|
$385.000
|
$600.000
|
$250.000
|
$370.000
|
$500.000
|
$349.000
|
$493.000
|
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$14.000
|
$18.800
|
$34.000
|
$50.000
|
$120.000
|
$100.000
|
$28.000
|
$21.500
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
22.000
|
$400.000
|
$540.000
|
$400.000
|
$500.000
|
$200.000
|
$600.000
|
$730.000
|
$445.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$800.000
|
$820.000
|
$660.000
|
$650.000
|
$300.000
|
$750.000
|
$1,600.000
|
$619.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$40.000
|
$85.000
|
$70.000
|
$150.000
|
$32.000
|
$75.000
|
$150.000
|
$77.000
|
|
|
|
INSTL OM ASSM (OM-4)(FLX)GND
|
EA
|
8.000
|
$100.000
|
$225.000
|
$200.000
|
$400.000
|
$60.000
|
$75.000
|
$500.000
|
$171.000
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
200.000
|
$0.750
|
$0.800
|
$0.800
|
$1.000
|
$1.000
|
$0.850
|
$1.000
|
$0.950
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
26,580.000
|
$0.600
|
$0.600
|
$0.600
|
$1.000
|
$0.750
|
$0.800
|
$1.000
|
$0.900
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
27,760.000
|
$0.600
|
$0.600
|
$0.600
|
$1.000
|
$0.750
|
$0.800
|
$1.000
|
$0.900
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
200.000
|
$0.540
|
$1.400
|
$1.000
|
$5.000
|
$0.950
|
$2.000
|
$4.000
|
$1.350
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,200.000
|
$0.540
|
$1.000
|
$1.000
|
$3.000
|
$0.950
|
$2.000
|
$4.000
|
$2.300
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
880.000
|
$0.740
|
$1.800
|
$1.800
|
$1.600
|
$2.150
|
$1.500
|
$2.000
|
$1.700
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
860.000
|
$2.740
|
$3.400
|
$3.400
|
$3.200
|
$4.000
|
$3.000
|
$4.000
|
$3.400
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
300.000
|
$6.000
|
$7.800
|
$7.800
|
$6.500
|
$9.200
|
$6.000
|
$7.000
|
$6.850
|
|
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
235.000
|
$3.000
|
$3.800
|
$3.800
|
$3.250
|
$4.500
|
$3.000
|
$4.000
|
$3.400
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,226.000
|
$0.310
|
$0.450
|
$0.450
|
$0.800
|
$0.750
|
$0.600
|
$0.750
|
$0.700
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
27,600.000
|
$0.290
|
$0.340
|
$0.340
|
$0.700
|
$0.500
|
$0.600
|
$0.750
|
$0.700
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,340.000
|
$0.310
|
$0.360
|
$0.360
|
$0.700
|
$0.500
|
$0.600
|
$0.750
|
$0.700
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
15,100.000
|
$0.280
|
$0.340
|
$0.340
|
$0.700
|
$0.500
|
$0.600
|
$0.750
|
$0.700
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$200.000
|
$220.000
|
$220.000
|
$300.000
|
$260.000
|
$275.000
|
$350.000
|
$313.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$225.000
|
$240.000
|
$240.000
|
$400.000
|
$300.000
|
$375.000
|
$475.000
|
$427.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
500.000
|
$3.000
|
$2.800
|
$2.800
|
$3.750
|
$3.300
|
$3.500
|
$4.000
|
$4.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
50.000
|
$3.000
|
$4.800
|
$4.800
|
$3.700
|
$5.700
|
$3.500
|
$4.000
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
28,800.000
|
$0.450
|
$0.800
|
$0.800
|
$1.000
|
$1.000
|
$0.750
|
$1.000
|
$0.800
|
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,200.000
|
$0.500
|
$0.900
|
$0.900
|
$1.700
|
$1.100
|
$1.500
|
$2.000
|
$1.700
|
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,100.000
|
$2.000
|
$2.000
|
$2.000
|
$2.350
|
$2.500
|
$2.250
|
$3.000
|
$2.550
|
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
300.000
|
$2.500
|
$4.800
|
$4.800
|
$4.750
|
$5.700
|
$4.500
|
$6.000
|
$5.100
|
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
15.000
|
$40.000
|
$60.000
|
$60.000
|
$85.000
|
$70.000
|
$80.000
|
$100.000
|
$91.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
8.000
|
$50.000
|
$60.000
|
$60.000
|
$120.000
|
$70.000
|
$100.000
|
$127.000
|
$114.000
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,440.000
|
$0.350
|
$0.020
|
$0.020
|
$0.500
|
$0.200
|
$0.080
|
$0.500
|
$0.450
|
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
280.000
|
$0.600
|
$0.200
|
$0.200
|
$1.000
|
$0.250
|
$0.750
|
$1.000
|
$0.800
|
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
40.000
|
$1.000
|
$1.000
|
$1.000
|
$2.500
|
$1.250
|
$2.000
|
$2.500
|
$2.300
|
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$18,000.000
|
$20,000.000
|
$24,000.000
|
$27,500.000
|
$27,500.000
|
$16,200.000
|
$29,000.000
|
$18,400.000
|
|
|
|
THERMOPLASTIC PIPE (18 )(HDPE)
|
LF
|
3,336.000
|
$48.000
|
$29.850
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$30.000
|
$0.000
|
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
52,345.000
|
$1.500
|
$1.850
|
$1.600
|
$3.750
|
$2.000
|
$1.350
|
$1.000
|
$1.150
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
510.000
|
$50.000
|
$16.000
|
$18.890
|
$80.000
|
$65.000
|
$40.000
|
$65.000
|
$37.500
|
|
|
|
VIVDS PROCESSOR SYSTEM
|
EA
|
2.000
|
$6,000.000
|
$5,350.000
|
$8,500.000
|
$16,500.000
|
$9,950.000
|
$4,800.000
|
$10,800.000
|
$5,460.000
|
|
|
|
VIVDS CAMERA ASSEMBLY
|
EA
|
8.000
|
$1,500.000
|
$1,890.000
|
$1,600.000
|
$5,000.000
|
$2,000.000
|
$1,650.000
|
$1,969.000
|
$1,880.000
|
|
|
|
VIVDS SET-UP SYSTEM
|
EA
|
2.000
|
$450.000
|
$610.000
|
$900.000
|
$600.000
|
$1,000.000
|
$590.000
|
$1,000.000
|
$671.000
|
|
|
|
VIVDS COMMUNICATION CABLE (COAXIAL)
|
LF
|
1,275.000
|
$1.850
|
$4.250
|
$3.000
|
$5.000
|
$4.000
|
$4.100
|
$4.000
|
$4.650
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,336.000
|
$48.000
|
$0.000
|
$30.000
|
$38.000
|
$25.000
|
$40.000
|
$0.000
|
$34.000
|
|
Totals: |
$3,749,729.370
|
$3,399,954.240
|
$3,488,856.700
|
$3,527,438.610
|
$3,707,447.720
|
$3,828,310.640
|
$4,210,994.460
|
$4,544,630.440
|