PREPARING ROW
|
AC
|
1.000
|
$10,000.000
|
$5,000.000
|
$7,000.000
|
$17,000.000
|
$120,000.000
|
$27,500.000
|
$20,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
5.000
|
$20.000
|
$200.000
|
$20.000
|
$25.000
|
$800.000
|
$63.840
|
$50.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
962.000
|
$25.000
|
$11.000
|
$25.000
|
$20.000
|
$27.000
|
$33.181
|
$50.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,743.000
|
$15.000
|
$4.000
|
$12.500
|
$10.000
|
$4.000
|
$8.528
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
837.000
|
$18.000
|
$12.000
|
$20.000
|
$15.000
|
$26.000
|
$22.882
|
$50.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
23.400
|
$35.000
|
$94.000
|
$40.000
|
$20.000
|
$200.000
|
$136.410
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
416.800
|
$100.000
|
$50.000
|
$40.000
|
$30.000
|
$25.000
|
$45.950
|
$50.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
8,560.000
|
$5.000
|
$4.000
|
$4.500
|
$4.000
|
$8.000
|
$5.346
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
8,560.000
|
$7.000
|
$9.000
|
$7.000
|
$10.000
|
$9.800
|
$7.700
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
145.200
|
$50.000
|
$40.000
|
$100.000
|
$230.000
|
$84.000
|
$1.100
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
197.000
|
$75.000
|
$116.000
|
$250.000
|
$100.000
|
$104.000
|
$137.500
|
$200.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$700.000
|
$4,532.000
|
$650.000
|
$1,000.000
|
$2,500.000
|
$4,950.000
|
$1,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
5.500
|
$700.000
|
$1,946.000
|
$750.000
|
$550.000
|
$1,000.000
|
$986.513
|
$1,500.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
1.800
|
$740.000
|
$1,583.000
|
$650.000
|
$1,000.000
|
$1,000.000
|
$986.513
|
$1,500.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
449.000
|
$100.000
|
$83.000
|
$95.000
|
$110.000
|
$90.000
|
$137.775
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
12.000
|
$130.000
|
$266.000
|
$205.000
|
$130.000
|
$200.000
|
$163.405
|
$200.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
1.000
|
$10,000.000
|
$4,820.000
|
$9,500.000
|
$9,000.000
|
$4,900.000
|
$9,410.500
|
$2,500.000
|
|
|
SET (TY II) (12 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,400.000
|
$1,838.000
|
$1,225.000
|
$2,200.000
|
$1,800.000
|
$2,040.500
|
$2,500.000
|
|
|
GRATE & FRAME
|
EA
|
19.000
|
$1,800.000
|
$3,307.000
|
$2,100.000
|
$2,200.000
|
$4,700.000
|
$3,058.125
|
$3,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
4.000
|
$2,000.000
|
$4,167.000
|
$1,500.000
|
$1,200.000
|
$4,200.000
|
$79.800
|
$1,000.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
3.000
|
$1,000.000
|
$2,393.000
|
$1,200.000
|
$800.000
|
$3,800.000
|
$65.056
|
$500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,250.000
|
$1,428.000
|
$700.000
|
$700.000
|
$1,200.000
|
$935.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$1,290.000
|
$320.000
|
$450.000
|
$500.000
|
$650.000
|
$935.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
260.000
|
$20.000
|
$23.000
|
$25.000
|
$20.000
|
$12.000
|
$27.500
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$216,000.000
|
$180,000.000
|
$191,000.000
|
$170,000.000
|
$123,000.000
|
$326,298.341
|
$260,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,000.000
|
$3,000.000
|
$8,500.000
|
$3,000.000
|
$4,800.000
|
$2,750.000
|
$4,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
59.000
|
$10.000
|
$10.000
|
$0.100
|
$26.000
|
$11.200
|
$0.110
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,529.000
|
$9.000
|
$5.000
|
$0.100
|
$9.000
|
$8.000
|
$0.110
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,529.000
|
$3.000
|
$1.000
|
$0.100
|
$3.000
|
$1.000
|
$0.110
|
$1.000
|
|
|
CONC CURB (TY II)
|
LF
|
203.000
|
$30.000
|
$60.000
|
$28.000
|
$30.000
|
$33.000
|
$58.148
|
$30.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
89.000
|
$31.000
|
$55.000
|
$32.500
|
$40.000
|
$33.000
|
$58.148
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
4,549.000
|
$40.000
|
$25.000
|
$32.500
|
$40.000
|
$30.000
|
$58.148
|
$40.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
12.000
|
$45.000
|
$275.000
|
$45.000
|
$40.000
|
$1,200.000
|
$53.303
|
$50.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
14.000
|
$385.000
|
$575.000
|
$396.600
|
$160.000
|
$1,200.000
|
$1,066.056
|
$500.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,812.000
|
$100.000
|
$100.000
|
$88.000
|
$84.000
|
$128.840
|
$136.542
|
$100.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
8,995.000
|
$90.000
|
$78.000
|
$78.000
|
$85.000
|
$128.370
|
$134.358
|
$80.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
99.000
|
$165.000
|
$165.000
|
$185.190
|
$145.000
|
$203.820
|
$145.608
|
$200.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
16.000
|
$165.000
|
$130.000
|
$185.190
|
$145.000
|
$226.910
|
$145.608
|
$200.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
138.000
|
$165.000
|
$100.000
|
$185.190
|
$145.000
|
$226.910
|
$145.608
|
$200.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
62.000
|
$165.000
|
$160.000
|
$185.190
|
$145.000
|
$226.910
|
$145.608
|
$200.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
312.000
|
$165.000
|
$90.000
|
$185.190
|
$145.000
|
$376.910
|
$141.564
|
$200.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
35.000
|
$165.000
|
$150.000
|
$185.190
|
$145.000
|
$176.910
|
$141.564
|
$200.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
81.000
|
$200.000
|
$250.000
|
$350.000
|
$115.000
|
$276.910
|
$330.153
|
$200.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
10.000
|
$50.000
|
$17.000
|
$25.000
|
$20.000
|
$50.000
|
$11.000
|
$20.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
3.000
|
$400.000
|
$900.000
|
$425.000
|
$150.000
|
$800.000
|
$165.000
|
$200.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
180.000
|
$20.000
|
$45.000
|
$22.000
|
$74.000
|
$16.200
|
$68.200
|
$4.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
205.000
|
$2.300
|
$2.000
|
$2.750
|
$3.000
|
$2.590
|
$2.860
|
$4.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
4.000
|
$1,200.000
|
$1,650.000
|
$1,320.000
|
$2,140.000
|
$1,242.000
|
$1,980.000
|
$800.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$1,000.000
|
$1,319.000
|
$1,650.000
|
$3,500.000
|
$1,566.000
|
$3,245.000
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
4.000
|
$55.000
|
$381.000
|
$495.000
|
$416.000
|
$378.000
|
$385.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$800.000
|
$940.000
|
$650.000
|
$900.000
|
$812.000
|
$275.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
23.000
|
$900.000
|
$991.000
|
$750.000
|
$900.000
|
$879.200
|
$275.000
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
10.000
|
$650.000
|
$425.000
|
$450.000
|
$325.000
|
$924.000
|
$275.000
|
$300.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
15.000
|
$700.000
|
$422.000
|
$475.000
|
$350.000
|
$980.000
|
$275.000
|
$300.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
286.000
|
$1.000
|
$1.000
|
$1.320
|
$1.500
|
$1.300
|
$1.320
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,732.000
|
$10.000
|
$12.000
|
$13.200
|
$14.500
|
$12.960
|
$13.200
|
$8.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
23,780.000
|
$1.000
|
$0.360
|
$0.400
|
$0.500
|
$0.390
|
$0.396
|
$4.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,732.000
|
$5.000
|
$1.000
|
$0.970
|
$1.000
|
$0.950
|
$0.968
|
$8.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
21.000
|
$60.000
|
$85.000
|
$93.500
|
$101.000
|
$91.800
|
$93.500
|
$60.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$60.000
|
$85.000
|
$93.500
|
$101.000
|
$91.800
|
$93.500
|
$60.000
|
|
|
PAVEMENT SEALER (BIKE SYMBOL)
|
EA
|
16.000
|
$65.000
|
$85.000
|
$93.500
|
$101.000
|
$91.800
|
$93.500
|
$60.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
23,494.000
|
$1.000
|
$1.000
|
$1.010
|
$1.500
|
$0.990
|
$1.012
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
21.000
|
$250.000
|
$225.000
|
$247.500
|
$270.000
|
$243.000
|
$247.500
|
$60.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$300.000
|
$300.000
|
$330.000
|
$360.000
|
$324.000
|
$330.000
|
$60.000
|
|
PREFAB PAV MRK TY C (W)(BIKE SYMBOL)
|
EA
|
16.000
|
$250.000
|
$275.000
|
$302.500
|
$330.000
|
$297.000
|
$302.500
|
$60.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,328.000
|
$1.000
|
$0.850
|
$0.940
|
$1.000
|
$0.920
|
$0.935
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,061.000
|
$2.000
|
$0.950
|
$1.050
|
$1.000
|
$1.030
|
$1.045
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
266.000
|
$5.000
|
$10.000
|
$11.000
|
$12.000
|
$10.800
|
$11.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
5.000
|
$50.000
|
$125.000
|
$137.500
|
$150.000
|
$135.000
|
$137.500
|
$50.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$75.000
|
$125.000
|
$137.500
|
$150.000
|
$135.000
|
$137.500
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
23,393.000
|
$1.000
|
$0.250
|
$0.260
|
$0.500
|
$0.260
|
$0.264
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,732.000
|
$3.000
|
$0.850
|
$0.880
|
$1.000
|
$0.860
|
$0.880
|
$4.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
8.000
|
$600.000
|
$557.000
|
$990.000
|
$1,150.000
|
$720.900
|
$1,056.000
|
$5,000.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
1,889.000
|
$3.000
|
$2.000
|
$3.300
|
$5.000
|
$2.700
|
$3.300
|
$10.000
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
1,769.000
|
$2.000
|
$2.000
|
$2.750
|
$5.000
|
$2.270
|
$2.860
|
$10.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
8.000
|
$3,500.000
|
$2,512.000
|
$3,850.000
|
$4,800.000
|
$2,700.000
|
$4,400.000
|
$8,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
8.000
|
$850.000
|
$934.000
|
$1,100.000
|
$1,200.000
|
$955.800
|
$1,100.000
|
$3,000.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
1.000
|
$4,000.000
|
$2,391.000
|
$3,850.000
|
$4,500.000
|
$3,780.000
|
$4,070.000
|
$10,000.000
|
|
|
VEH LP DETECT (SAWCUT)
|
LF
|
2,726.000
|
$15.000
|
$15.000
|
$22.000
|
$15.000
|
$13.500
|
$13.750
|
$10.000
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
8.000
|
$200.000
|
$133.000
|
$275.000
|
$145.000
|
$253.800
|
$132.000
|
$4,000.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
8.000
|
$50.000
|
$69.000
|
$137.500
|
$70.000
|
$91.800
|
$66.000
|
$1,000.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$1,500.000
|
$1,200.000
|
$1,250.000
|
$1,000.000
|
$2,800.000
|
$1,210.000
|
$500.000
|
|
|
LANDSCAPE AMENITY (BENCH)
|
EA
|
2.000
|
$5,000.000
|
$3,800.000
|
$2,000.000
|
$1,800.000
|
$6,800.000
|
$1,375.000
|
$10,000.000
|
|
|
D-GR HMA TY-D PG 76-22 (EXEMPT)
|
TON
|
16.000
|
$153.000
|
$400.000
|
$325.000
|
$400.000
|
$32.000
|
$330.000
|
$200.000
|
|
|
GATE (INSTALL)(TYPE 1)(OTU)
|
EA
|
1.000
|
$447.000
|
$950.000
|
$5,000.000
|
$450.000
|
$18,000.000
|
$1,650.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
320.000
|
$155.000
|
$8.000
|
$125.000
|
$75.000
|
$52.000
|
$1.100
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$200.000
|
$10.000
|
$125.000
|
$265.000
|
$350.000
|
$1.100
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$250.000
|
$50.000
|
$125.000
|
$285.000
|
$500.000
|
$1.100
|
$300.000
|
|
Totals: |
$2,423,194.500
|
$2,002,875.000
|
$2,207,508.690
|
$2,281,958.500
|
$2,943,243.000
|
$2,954,388.632
|
$3,081,072.800
|