Show Job Controls
Bid Cobra

CAMERON FM 1575 (1505-01-016)

Items: 132

County: CAMERON
Length: 4.0000 MILES
Highway: FM 1575
District: PHARR
Control Number: 1505-01-016
DBE Goal: 0.0%
Project: F 2026(950)
Guaranty: $100,000.00
Time: 345 WORKING DAYS
Engineer's Estimate: $11,236,733.53
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263202
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00123454
Contract Type: FEDERAL
Project Description: REHABILITATE ROADWAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$11,236,733.53
Over/Under Est: -14.61% -$1,641,231.63
Over/Under Est: -6.47% -$727,423.48
Amt Left: 9.52% $913,808.15
$11,172,179.74
Over/Under Est: -0.57% -$64,553.79
Amt Left: 16.43% $1,576,677.84
Delta: -6.31% -$662,869.69
$11,423,678.64
Over/Under Est: 1.66% $186,945.11
Amt Left: 19.05% $1,828,176.74
Delta: -2.25% -$251,498.90
Over/Under Est: 3.19% $357,950.12
Amt Left: 20.83% $1,999,181.75
Delta: -1.50% -$171,005.01

Bid Items & Bid Tabulations

132 Total 0 of 132
CAMERON  |  FM 1575  |  PHARR  |  1505-01-016  |  09/03/2026 1:00 PM CDT  |  $11,236,733.53  |  F 2026(950)  |  REHAB EXIST ROADWAY  |  345 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REIM CONSTRUCTION, INC.
TEXAS CORDIA CONSTRUCTION, LLC
IOC COMPANY, LLC
FOREMOST PAVING, INC.
GO UNDERGROUND, LIMITED LIABILITY COMPANY
PREPARING ROW
STA 211.500 $2,500.000 $685.000 $2,700.000 $2,750.000 $2,500.000 $1,000.000
REMOV CONC (RIPRAP)
SY 92.000 $20.000 $13.000 $14.000 $50.000 $127.080 $12.000
REMOV CONC (DRIVEWAYS)
SY 1,807.000 $20.000 $12.150 $10.000 $15.000 $27.760 $12.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 1,004.000 $15.000 $10.850 $15.000 $15.000 $13.070 $12.000
REMOV CONC (CURB & GUTTER)
LF 2,015.000 $8.000 $3.150 $5.000 $10.000 $7.090 $12.000
REMOV CONC (GUTTER)
LF 85.000 $15.000 $10.300 $11.000 $35.000 $9.900 $12.000
EXCAV (ROADWAY)
CY 27,945.000 $10.000 $5.000 $8.000 $10.000 $15.840 $12.000
EMBANK (FNL)(DC)(TY C)
CY 1,956.000 $12.000 $10.050 $4.000 $7.000 $29.260 $33.000
BACKFILL (TY A)
STA 211.500 $280.000 $175.000 $350.000 $150.000 $256.480 $150.000
FURN & PLACE TOPSOIL (VEH)
CY 50.000 $75.000 $24.000 $50.000 $10.000 $30.010 $93.000
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 75,299.000 $0.500 $0.400 $0.400 $0.360 $0.330 $0.440
HYDRO MULCH SEED (TEMP_WARM)
SY 75,299.000 $0.400 $0.240 $0.250 $0.230 $0.200 $0.420
VEGETATIVE WATERING
TGL 1,266.000 $20.000 $31.800 $2.000 $28.000 $42.510 $34.630
SPRINKLING (DUST CONTROL)
TGL 846.000 $10.000 $31.800 $19.000 $1.000 $1.000 $2.000
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 17,447.000 $40.000 $54.600 $63.000 $55.000 $47.230 $32.620
GEOGRID BASE REINFORCEMENT (TYPE 2)
SY 97,708.000 $1.500 $1.500 $3.000 $1.500 $1.560 $1.000
REWORK BS MTL (TY B)(8")(DC)(ORG POS)
CY 22,522.000 $5.000 $7.650 $3.000 $8.500 $6.850 $5.000
LIME (COM OR QK)(SLURRY)
TON 1,603.000 $260.000 $315.000 $250.000 $300.000 $272.170 $360.000
LIME TRT (EXIST MATL)(12")
SY 107,835.000 $3.000 $2.050 $3.000 $1.000 $4.850 $4.000
CEMENT
TON 1,350.000 $190.000 $190.000 $226.000 $175.000 $186.510 $140.000
CEMENT TRT (EXIST MATL & NEW BASE)(14")
SY 102,749.000 $2.500 $2.800 $2.000 $1.000 $5.830 $3.000
SALV,HAUL & STKPL RCL APH PV (0 TO 3")
SY 101,343.000 $3.000 $1.950 $3.000 $1.000 $1.550 $4.170
PRIME COAT (MC-30)
GAL 19,543.000 $6.000 $6.200 $5.000 $5.750 $6.730 $10.000
ASPH (TIER II)
GAL 29,314.000 $6.000 $4.300 $5.000 $4.500 $6.980 $7.000
AGGR (TY-D GR-4P) (SAC B)
CY 784.000 $80.000 $88.500 $210.000 $100.000 $73.420 $90.000
SP MIXES SP-D SAC-A PG76-22
TON 16,714.000 $125.000 $122.000 $125.000 $145.000 $125.000 $151.400
STRUCT EXCAV (SPECIAL)
CY 42.000 $95.000 $91.900 $112.000 $125.000 $110.550 $97.000
CUT & RESTORE ASPH PAVING
SY 262.000 $100.000 $81.750 $95.000 $130.000 $105.530 $90.000
CEM STABIL BKFL
CY 96.000 $100.000 $82.900 $73.000 $100.000 $110.550 $55.000
TRENCH EXCAVATION PROTECTION
LF 192.000 $10.000 $2.550 $12.000 $0.100 $1.010 $2.000
RIPRAP (CONC)(4 IN)
CY 92.000 $600.000 $500.000 $695.000 $555.000 $804.000 $480.000
RC PIPE (CL III)(18 IN)
LF 9,974.000 $100.000 $74.050 $71.000 $107.000 $99.800 $94.150
RC PIPE (CL III)(24 IN)
LF 32.000 $100.000 $86.800 $103.000 $110.000 $211.050 $105.500
RC PIPE (CL IV)(18 IN)
LF 288.000 $125.000 $79.350 $128.000 $105.000 $216.080 $99.820
INLET (STAGE II)(PCO)(5FT)(NONE)
EA 8.000 $5,000.000 $2,730.000 $3,130.000 $4,000.000 $5,025.000 $3,450.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 420.000 $1,200.000 $1,120.000 $944.000 $1,000.000 $1,115.550 $1,450.000
SET (TY II)(18 IN)(RCP)(3:1)(P)
EA 12.000 $1,800.000 $894.000 $780.000 $1,500.000 $1,105.500 $1,350.000
CLEAN EXIST CULVERTS
EA 13.000 $2,500.000 $2,840.000 $1,080.000 $1,500.000 $11,055.000 $5,000.000
REMOV STR (INLET)
EA 8.000 $1,000.000 $709.000 $700.000 $750.000 $1,809.000 $500.000
REMOV STR (SET)
EA 461.000 $400.000 $284.000 $292.000 $250.000 $246.230 $150.000
REMOV STR (PIPE)
LF 8,535.000 $15.000 $13.100 $6.000 $15.000 $20.100 $4.000
MOBILIZATION
LS 1.000 $1,021,521.230 $700,000.000 $849,725.000 $1,000,000.000 $628,000.000 $732,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $5,000.000 $4,650.000 $800.000 $3,500.000 $4,000.000 $3,200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $5,000.000 $6,420.000 $67.000 $10,000.000 $2,500.000 $8,000.000
TMA (STATIONARY)
DAY 660.000 $180.000 $29.750 $32.000 $100.000 $25.000 $225.000
TMA (MOBILE OPERATION)
DAY 28.000 $200.000 $387.000 $70.000 $750.000 $0.010 $500.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 80.000 $70.000 $67.050 $126.000 $100.000 $95.480 $23.250
ROCK FILTER DAMS (REMOVE)
LF 80.000 $20.000 $23.950 $99.000 $45.000 $40.200 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 936.000 $40.000 $16.550 $21.000 $35.000 $25.610 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $10.000 $9.050 $6.000 $1.000 $14.420 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 773.000 $4.500 $2.700 $5.000 $5.000 $3.770 $9.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 773.000 $1.200 $1.100 $1.000 $3.000 $2.170 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 14,040.000 $5.000 $2.650 $5.000 $3.000 $5.480 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 14,040.000 $1.000 $1.000 $1.000 $0.100 $0.910 $1.000
CONCRETE C&G (VALLEY GUTTER)
LF 85.000 $80.000 $54.150 $107.000 $175.000 $71.660 $120.000
CONC CURB & GUTTER (TY A) (BARRIER)
LF 2,015.000 $25.000 $18.750 $20.000 $25.000 $13.330 $60.000
DRIVEWAYS (CONC)
SY 2,108.000 $100.000 $73.200 $103.000 $86.000 $78.590 $97.000
DRIVEWAYS (ACP)
SY 11,345.000 $55.000 $35.900 $35.000 $70.000 $56.560 $65.000
CONC SIDEWALKS (4")
SY 924.000 $60.000 $44.100 $66.000 $85.000 $51.550 $85.000
CURB RAMPS (TY 1)
EA 4.000 $2,900.000 $1,690.000 $2,100.000 $2,500.000 $1,680.200 $3,500.000
CURB RAMPS (TY 5)
EA 4.000 $3,500.000 $2,080.000 $2,340.000 $2,500.000 $1,680.200 $3,500.000
CURB RAMPS (TY 10)
EA 11.000 $2,000.000 $1,970.000 $2,080.000 $2,200.000 $1,680.200 $3,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 169.000 $320.000 $328.000 $519.000 $300.000 $301.500 $332.310
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $300.000 $382.000 $599.000 $450.000 $452.250 $378.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 7.000 $1,000.000 $628.000 $978.000 $550.000 $552.750 $621.000
CONDT (PVC) (SCH 40) (1")
LF 30.000 $15.000 $18.600 $20.000 $19.750 $17.090 $19.440
CONDT (PVC) (SCH 40) (2")
LF 255.000 $10.000 $34.950 $13.000 $13.170 $32.160 $12.960
CONDT (PVC) (SCH 40) (4")
LF 450.000 $20.000 $38.250 $22.000 $21.940 $35.180 $21.600
CONDT (PVC) (SCH 80) (4") (BORE)
LF 340.000 $40.000 $49.150 $42.000 $41.690 $45.230 $41.040
ELEC CONDR (NO.8) BARE
LF 1,255.000 $2.000 $2.250 $2.000 $2.190 $2.070 $2.160
ELEC CONDR (NO.6) BARE
LF 130.000 $2.000 $2.450 $3.000 $2.740 $2.270 $2.700
ELEC CONDR (NO.6) INSULATED
LF 260.000 $2.000 $2.800 $3.000 $3.070 $2.570 $3.020
TRAY CABLE (4 CONDR) (12 AWG)
LF 2,563.000 $3.000 $3.700 $4.000 $3.840 $3.420 $3.780
GROUND BOX TY A (122311)W/APRON
EA 7.000 $1,000.000 $1,530.000 $1,090.000 $1,091.690 $1,407.000 $1,074.600
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,500.000 $1,970.000 $2,030.000 $2,029.780 $1,809.000 $1,998.000
ZINC-COAT STL WIRE STRAND (3/16")
LF 1,805.000 $2.500 $1.700 $2.000 $1.970 $1.560 $1.940
ZINC-COAT STL WIRE STRAND (5/16")
LF 4,915.000 $4.000 $1.950 $2.000 $2.410 $1.810 $2.380
ALUMINUM SIGNS (TY A)
SF 54.000 $35.000 $38.250 $18.000 $45.000 $38.190 $37.800
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 50.000 $750.000 $819.000 $856.000 $850.000 $854.250 $810.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 11.000 $1,000.000 $929.000 $973.000 $1,100.000 $1,105.500 $918.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $600.000 $266.000 $1,590.000 $650.000 $653.250 $486.000
REMOVE SM RD SN SUP&AM
EA 64.000 $150.000 $109.000 $213.000 $70.000 $136.460 $108.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 8.000 $100.000 $104.000 $248.000 $125.000 $125.630 $102.600
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 46,960.000 $0.750 $0.860 $0.340 $0.340 $0.350 $1.160
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,440.000 $1.500 $1.400 $2.000 $2.200 $2.220 $1.370
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 182.000 $8.000 $13.100 $7.000 $6.500 $6.540 $12.960
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 630.000 $1.500 $1.300 $1.000 $1.100 $1.110 $1.260
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 49,879.000 $0.750 $0.860 $0.350 $0.340 $0.350 $0.840
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,126.000 $1.000 $1.450 $6.000 $1.700 $1.310 $0.410
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,046.000 $1.000 $1.500 $6.000 $1.800 $1.310 $0.420
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 299.000 $1.000 $1.000 $2.000 $2.200 $2.220 $0.960
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,046.000 $5.000 $8.200 $6.000 $5.500 $5.530 $8.100
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 460.000 $0.550 $0.850 $1.000 $1.100 $1.110 $0.830
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 38,905.000 $0.450 $0.750 $1.000 $0.660 $0.670 $0.720
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 4,520.000 $0.550 $0.850 $1.000 $0.880 $0.890 $0.830
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 13,792.000 $0.450 $0.750 $1.000 $0.760 $0.770 $0.720
PREFAB PM TY C (W)(ARROW)
EA 3.000 $200.000 $328.000 $175.000 $175.000 $175.880 $324.000
PREFAB PM TY C (W)(WORD)
EA 3.000 $200.000 $54.650 $275.000 $275.000 $276.380 $378.000
REFL PAV MRKR TY I-C
EA 38.000 $5.000 $5.200 $25.000 $25.000 $25.130 $5.120
REFL PAV MRKR TY II-A-A
EA 569.000 $5.000 $5.200 $8.000 $7.500 $7.540 $5.130
TRAFFIC BUTTON TY Y
EA 2,187.000 $3.000 $4.250 $3.000 $2.500 $2.520 $4.180
TRAFFIC BUTTON TY B
EA 5,869.000 $2.500 $4.250 $3.000 $2.500 $2.520 $4.180
ELIM EXT PM & MRKS (4")
LF 41,679.000 $0.300 $0.500 $0.350 $0.350 $0.360 $0.510
ELIM EXT PM & MRKS (8")
LF 600.000 $0.750 $0.550 $0.450 $0.450 $0.460 $0.510
ELIM EXT PM & MRKS (24")
LF 411.000 $3.000 $6.550 $3.000 $3.000 $3.020 $6.480
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $50.000 $219.000 $50.000 $50.000 $50.250 $216.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $50.000 $219.000 $50.000 $50.000 $50.250 $216.000
INSTALL HWY TRF SIG (FLASH BEACON)
EA 5.000 $10,000.000 $2,400.000 $1,480.000 $1,481.190 $2,211.000 $1,458.000
INSTALL HWY TRF SIG (ISOLATED)
EA 2.000 $25,000.000 $4,150.000 $6,030.000 $6,034.490 $3,819.000 $5,940.000
REMOVING TRAFFIC SIGNALS
EA 7.000 $5,000.000 $1,640.000 $2,470.000 $2,468.650 $1,507.500 $2,430.000
TEMP TRAF SIGNALS
EA 2.000 $10,000.000 $5,350.000 $4,660.000 $4,663.010 $4,924.500 $4,590.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $325.000 $382.000 $371.000 $370.850 $351.750 $365.040
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $325.000 $393.000 $371.000 $370.850 $361.800 $365.040
VEH SIG SEC (12")LED(YEL)
EA 36.000 $325.000 $382.000 $371.000 $370.850 $351.750 $365.040
VEH SIG SEC (12")LED(YEL ARW)
EA 12.000 $325.000 $393.000 $371.000 $370.850 $361.800 $365.040
VEH SIG SEC (12")LED(RED)
EA 34.000 $325.000 $382.000 $371.000 $370.850 $351.750 $365.040
VEH SIG SEC (12")LED(RED ARW)
EA 6.000 $325.000 $393.000 $371.000 $370.850 $361.800 $365.040
PED SIG SEC (LED)(COUNTDOWN)
EA 16.000 $700.000 $940.000 $603.000 $603.450 $864.300 $594.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 6.000 $225.000 $153.000 $137.000 $137.150 $140.700 $135.000
BACKPLATE W/REFL BRDR(3 SEC)
EA 16.000 $200.000 $131.000 $126.000 $126.180 $120.600 $124.200
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,625.000 $2.000 $2.450 $2.000 $1.920 $2.220 $1.890
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 4,941.000 $3.000 $3.800 $3.000 $3.130 $3.520 $3.080
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,276.000 $3.500 $4.950 $4.000 $4.000 $4.580 $3.940
PED POLE ASSEMBLY
EA 9.000 $2,000.000 $3,170.000 $3,020.000 $3,017.240 $2,914.500 $2,970.000
PED DETECT PUSH BUTTON (APS)
EA 16.000 $1,000.000 $1,090.000 $1,030.000 $1,031.350 $1,005.000 $1,015.200
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,000.000 $4,480.000 $3,570.000 $3,565.840 $4,120.500 $3,510.000
REMOVAL OF CONDUIT
LF 1,420.000 $4.000 $3.900 $4.000 $4.390 $3.570 $4.320
REMOVAL OF GROUND BOXES
EA 13.000 $245.000 $98.350 $340.000 $340.130 $90.450 $334.800
BONDING COURSE
GAL 6,840.000 $3.500 $4.950 $5.000 $1.000 $2.720 $14.000
HVDS W/FXD LNS
EA 8.000 $6,900.000 $8,190.000 $10,040.000 $10,039.190 $7,537.500 $9,882.000
VIDEO IMAGING AND RADAR SET-UP SYS
EA 2.000 $750.000 $2,730.000 $384.000 $384.020 $2,512.500 $378.000
VID IMAGE AND RADAR DET PROCESSOR SYS
EA 2.000 $15,000.000 $10,300.000 $16,290.000 $16,293.110 $9,447.000 $16,038.000
Totals: $11,236,733.530 $9,595,501.900 $10,509,310.050 $11,172,179.740 $11,423,678.640 $11,594,683.650
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $102,152.12
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $204,304.25
Total: $306,456.37