PREPARING ROW
|
STA
|
157.800
|
$1,800.000
|
$2,300.000
|
$890.000
|
$4,000.000
|
$2,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
622.000
|
$30.000
|
$10.000
|
$6.000
|
$20.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,103.000
|
$8.000
|
$10.000
|
$6.000
|
$6.000
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
57.000
|
$10.250
|
$100.000
|
$45.000
|
$30.000
|
$75.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,946.000
|
$5.000
|
$9.000
|
$3.000
|
$10.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
STA
|
157.800
|
$150.000
|
$150.000
|
$546.000
|
$160.000
|
$450.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$40.000
|
$20.000
|
$53.000
|
$50.000
|
$75.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
78,181.000
|
$0.400
|
$0.420
|
$0.500
|
$0.600
|
$0.850
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
78,181.000
|
$0.400
|
$0.310
|
$0.450
|
$0.500
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
1,426.000
|
$30.000
|
$32.000
|
$28.000
|
$50.000
|
$50.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
631.000
|
$7.000
|
$1.000
|
$18.000
|
$20.000
|
$1.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
8,716.000
|
$70.000
|
$85.000
|
$145.000
|
$110.000
|
$125.000
|
|
|
REWRKING BS MTRL(TY B)(5")(DC)(ORG POS)
|
CY
|
7,762.000
|
$6.000
|
$5.000
|
$6.000
|
$12.000
|
$15.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
62,538.000
|
$2.000
|
$2.500
|
$2.000
|
$4.000
|
$3.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
1,548.000
|
$180.000
|
$225.000
|
$195.000
|
$300.000
|
$220.000
|
|
|
CEMENT
|
TON
|
556.000
|
$180.000
|
$205.000
|
$180.000
|
$220.000
|
$200.000
|
|
|
CEMENT TRT (MX EXST MTL & NW BS)(10")
|
SY
|
59,322.000
|
$2.000
|
$2.500
|
$2.000
|
$3.000
|
$3.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (3")
|
SY
|
52,383.000
|
$3.000
|
$3.000
|
$4.000
|
$2.500
|
$1.750
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,222.000
|
$5.000
|
$4.000
|
$7.000
|
$7.000
|
$7.000
|
|
|
ASPH (TIER II)
|
GAL
|
16,832.000
|
$5.000
|
$6.000
|
$5.000
|
$7.500
|
$7.000
|
|
|
AGGR (TY-B GR-4P SAC-B)
|
CY
|
468.000
|
$90.000
|
$55.000
|
$136.000
|
$115.000
|
$275.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
756.000
|
$5.000
|
$12.000
|
$3.000
|
$20.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
94.000
|
$80.000
|
$45.000
|
$72.000
|
$70.000
|
$115.000
|
|
|
CUT & RESTORING PAV
|
SY
|
54.000
|
$90.000
|
$100.000
|
$201.000
|
$180.000
|
$195.000
|
|
|
STRUCT EXCAV (SPECIAL)
|
CY
|
84.000
|
$40.000
|
$50.000
|
$93.000
|
$75.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
322.000
|
$2.950
|
$5.000
|
$15.000
|
$1.500
|
$1.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.000
|
$450.000
|
$390.000
|
$871.000
|
$850.000
|
$925.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,481.000
|
$70.000
|
$55.000
|
$56.000
|
$60.000
|
$95.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
132.000
|
$90.000
|
$63.000
|
$84.000
|
$80.000
|
$130.000
|
|
|
RC PIPE (CL IV) (24 IN) (SPL)
|
LF
|
45.000
|
$90.000
|
$72.000
|
$104.000
|
$85.000
|
$155.000
|
|
|
RC PIPE (CL IV) (30 IN) (SPL)
|
LF
|
109.000
|
$120.000
|
$92.000
|
$120.000
|
$120.000
|
$172.000
|
|
|
RC PIPE (CL IV) (18") (SPL)
|
LF
|
90.000
|
$70.000
|
$68.000
|
$80.000
|
$68.000
|
$110.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,250.000
|
$1,450.000
|
$1,251.000
|
$2,000.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (5: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$1,450.000
|
$1,327.000
|
$2,200.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
122.000
|
$1,250.000
|
$1,500.000
|
$1,327.000
|
$1,200.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,350.000
|
$1,785.000
|
$1,516.000
|
$2,600.000
|
$2,750.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,550.000
|
$1,850.000
|
$1,629.000
|
$2,600.000
|
$3,500.000
|
|
|
REMOV STR (SET)
|
EA
|
30.000
|
$550.000
|
$500.000
|
$401.000
|
$300.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,244.000
|
$22.000
|
$7.000
|
$7.000
|
$8.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$490,000.000
|
$450,000.000
|
$400,000.000
|
$680,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,500.000
|
$4,500.000
|
$8,000.000
|
$8,000.000
|
$8,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$25.000
|
$22.000
|
$22.000
|
$15.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$10.000
|
$12.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,670.000
|
$3.300
|
$3.500
|
$4.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,670.000
|
$1.300
|
$1.500
|
$1.000
|
$1.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,820.000
|
$6.000
|
$6.500
|
$5.750
|
$7.000
|
$5.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,820.000
|
$1.300
|
$1.600
|
$1.400
|
$1.500
|
$2.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
635.000
|
$80.000
|
$65.000
|
$109.000
|
$75.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,529.000
|
$50.000
|
$55.000
|
$49.000
|
$50.000
|
$55.000
|
|
|
TURNOUTS (ACP)
|
SY
|
786.000
|
$50.000
|
$90.000
|
$51.000
|
$100.000
|
$75.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
44.000
|
$255.000
|
$315.000
|
$447.000
|
$350.000
|
$410.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
12.000
|
$30.000
|
$28.000
|
$30.000
|
$40.000
|
$28.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
9.000
|
$660.000
|
$800.000
|
$1,000.000
|
$800.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$900.000
|
$930.000
|
$1,200.000
|
$1,000.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,100.000
|
$1,050.000
|
$1,545.000
|
$1,250.000
|
$1,050.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$90.000
|
$220.000
|
$62.000
|
$80.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$160.000
|
$125.000
|
$142.000
|
$135.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
31,580.000
|
$0.600
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
31,580.000
|
$0.600
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,460.000
|
$1.500
|
$1.500
|
$5.000
|
$2.000
|
$0.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
42.000
|
$6.500
|
$12.000
|
$12.000
|
$13.000
|
$12.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,405.000
|
$0.400
|
$0.500
|
$0.500
|
$0.520
|
$0.480
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8,450.000
|
$0.400
|
$0.500
|
$0.480
|
$0.520
|
$0.480
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
31,619.000
|
$0.500
|
$0.500
|
$0.500
|
$0.520
|
$0.480
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
284.000
|
$4.500
|
$3.500
|
$3.000
|
$3.500
|
$3.250
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,693.000
|
$3.000
|
$2.000
|
$2.000
|
$2.500
|
$2.000
|
|
TRAFFIC BUTTON TY B
|
EA
|
4,717.000
|
$1.800
|
$2.000
|
$2.000
|
$2.500
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
26,240.000
|
$0.350
|
$0.300
|
$0.300
|
$0.400
|
$0.300
|
|
|
PRSSR IRRIG PVC PIPE (24")
|
LF
|
154.000
|
$70.000
|
$180.000
|
$226.000
|
$200.000
|
$95.000
|
|
|
PRSSR IRRIG PVC PIPE (12")
|
LF
|
80.000
|
$48.000
|
$150.000
|
$149.000
|
$150.000
|
$90.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
9,655.000
|
$125.000
|
$127.000
|
$178.000
|
$150.000
|
$168.000
|
|
|
BONDING COURSE
|
GAL
|
3,976.000
|
$5.000
|
$4.100
|
$7.000
|
$6.500
|
$7.500
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
59,332.000
|
$1.400
|
$1.720
|
$2.000
|
$2.500
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$2,500.000
|
$7,572.000
|
$20,000.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
224.000
|
$220.000
|
$40.000
|
$10.000
|
$230.000
|
$150.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$220.000
|
$0.010
|
$20.000
|
$250.000
|
$265.000
|
|
|
CASING (STEEL) (20 IN) (OPEN TRENCH)
|
LF
|
50.000
|
$160.000
|
$400.000
|
$401.000
|
$300.000
|
$240.000
|
|
|
CASING (STEEL) (30 IN) (OPEN TRENCH)
|
LF
|
105.000
|
$250.000
|
$475.000
|
$498.000
|
$400.000
|
$250.000
|
|
Totals: |
$4,967,568.850
|
$5,289,300.970
|
$6,162,941.750
|
$6,877,330.080
|
$7,046,014.370
|