REMOV CONC (RIPRAP)
|
SY
|
1,591.000
|
$30.000
|
$37.290
|
$16.000
|
$25.000
|
$10.000
|
$46.130
|
$15.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
92.000
|
$47.000
|
$17.710
|
$42.000
|
$150.000
|
$50.000
|
$28.040
|
$50.000
|
|
|
RMV (22") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,682.000
|
$15.000
|
$35.790
|
$10.000
|
$25.000
|
$20.000
|
$11.120
|
$26.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
437.000
|
$31.000
|
$31.080
|
$40.000
|
$50.000
|
$30.000
|
$53.830
|
$35.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
9,131.000
|
$25.000
|
$18.170
|
$63.000
|
$50.000
|
$45.000
|
$75.010
|
$40.000
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
28,864.000
|
$0.300
|
$0.330
|
$0.250
|
$0.300
|
$0.250
|
$1.120
|
$0.300
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
28,864.000
|
$0.300
|
$0.280
|
$0.150
|
$0.200
|
$0.250
|
$1.020
|
$0.200
|
|
|
SOIL RET BLKT(SL_MOD_SAND_SHORT_ROLL)
|
SY
|
7,721.000
|
$3.500
|
$2.100
|
$2.000
|
$3.000
|
$4.000
|
$3.440
|
$1.500
|
|
|
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12")
|
SY
|
3,137.000
|
$40.000
|
$41.560
|
$55.000
|
$40.000
|
$75.000
|
$95.310
|
$60.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
786.000
|
$8.000
|
$7.460
|
$12.000
|
$8.000
|
$20.000
|
$11.770
|
$20.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
97.000
|
$210.000
|
$125.870
|
$500.000
|
$250.000
|
$250.000
|
$462.030
|
$300.000
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
929.000
|
$210.000
|
$188.950
|
$250.000
|
$225.000
|
$300.000
|
$264.470
|
$300.000
|
|
|
TACK COAT
|
GAL
|
829.000
|
$8.000
|
$4.180
|
$10.000
|
$6.000
|
$20.000
|
$11.770
|
$10.000
|
|
|
PLANE & TEXT ASPH CONC PAV(2")
|
SY
|
1,858.000
|
$6.000
|
$2.380
|
$4.500
|
$10.000
|
$6.000
|
$12.940
|
$20.000
|
|
|
CEM STABIL BKFL
|
CY
|
427.000
|
$255.000
|
$251.500
|
$225.000
|
$250.000
|
$300.000
|
$300.930
|
$350.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,684.000
|
$60.000
|
$40.270
|
$72.000
|
$50.000
|
$30.000
|
$67.950
|
$10.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
528.000
|
$165.000
|
$56.160
|
$75.000
|
$150.000
|
$200.000
|
$550.000
|
$105.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
924.000
|
$350.000
|
$273.050
|
$280.000
|
$300.000
|
$500.000
|
$1,100.000
|
$300.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
408.000
|
$420.000
|
$469.240
|
$365.000
|
$400.000
|
$900.000
|
$1,550.000
|
$380.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
16.000
|
$300.000
|
$303.010
|
$325.000
|
$346.000
|
$600.000
|
$323.580
|
$300.000
|
|
|
CL C CONC (ABUT)
|
CY
|
157.500
|
$1,500.000
|
$1,057.920
|
$1,100.000
|
$2,000.000
|
$2,400.000
|
$2,781.000
|
$2,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
77.200
|
$2,000.000
|
$2,262.440
|
$1,100.000
|
$2,000.000
|
$2,400.000
|
$2,681.000
|
$3,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
76.500
|
$2,000.000
|
$1,055.500
|
$1,300.000
|
$2,000.000
|
$2,400.000
|
$2,800.000
|
$3,500.000
|
|
|
REINF CONC SLAB
|
SF
|
17,296.000
|
$42.250
|
$36.730
|
$45.000
|
$40.000
|
$50.000
|
$45.000
|
$50.000
|
|
|
APPROACH SLAB
|
CY
|
208.000
|
$750.000
|
$645.900
|
$700.000
|
$2,000.000
|
$1,500.000
|
$946.380
|
$1,800.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
6,473.000
|
$110.000
|
$129.210
|
$99.000
|
$135.000
|
$150.000
|
$107.020
|
$120.000
|
|
|
EPOXY WATERPROOF FINISH (TY X)
|
SF
|
2,239.000
|
$13.000
|
$17.810
|
$18.000
|
$8.000
|
$25.000
|
$9.410
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,012.000
|
$620.000
|
$343.000
|
$550.000
|
$675.000
|
$1,000.000
|
$549.340
|
$750.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
14.000
|
$650.000
|
$652.630
|
$650.000
|
$850.000
|
$1,000.000
|
$1,001.330
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$650.000
|
$652.630
|
$1,500.000
|
$850.000
|
$600.000
|
$2,766.300
|
$800.000
|
|
|
ELASTOMERIC BEARING (EE5)
|
EA
|
10.000
|
$3,000.000
|
$2,695.070
|
$2,500.000
|
$4,000.000
|
$7,500.000
|
$2,550.980
|
$4,000.000
|
|
|
ELASTOMERIC BEARING (EE6)
|
EA
|
2.000
|
$3,000.000
|
$3,095.350
|
$3,000.000
|
$4,000.000
|
$8,000.000
|
$2,929.860
|
$4,000.000
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
6.000
|
$5,000.000
|
$5,594.010
|
$5,500.000
|
$4,000.000
|
$10,000.000
|
$4,558.340
|
$4,000.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,292,142.000
|
$2.800
|
$2.490
|
$2.200
|
$2.250
|
$3.150
|
$3.110
|
$5.600
|
|
|
RAIL (TY SSTR)
|
LF
|
832.000
|
$120.000
|
$95.070
|
$175.000
|
$250.000
|
$400.000
|
$419.630
|
$220.000
|
|
|
RAIL (TY T80PP)
|
LF
|
420.000
|
$180.000
|
$242.260
|
$490.000
|
$350.000
|
$700.000
|
$851.600
|
$300.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
176.000
|
$275.000
|
$279.700
|
$280.000
|
$300.000
|
$400.000
|
$293.970
|
$250.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$300,000.000
|
$271,309.250
|
$200,000.000
|
$850,000.000
|
$1,000,000.000
|
$550,000.000
|
$900,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$900,000.000
|
$977,287.800
|
$960,000.000
|
$1,200,000.000
|
$1,400,000.000
|
$1,383,824.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$29,000.000
|
$35,739.480
|
$25,000.000
|
$50,000.000
|
$25,000.000
|
$19,767.720
|
$8,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$8,961.720
|
$15,000.000
|
$18,500.000
|
$18,000.000
|
$29,416.250
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$300.000
|
$310.780
|
$330.000
|
$550.000
|
$300.000
|
$924.850
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$100.000
|
$124.310
|
$250.000
|
$70.000
|
$150.000
|
$386.820
|
$50.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
480.000
|
$50.000
|
$31.700
|
$50.000
|
$45.000
|
$30.000
|
$35.300
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
480.000
|
$20.000
|
$11.800
|
$10.000
|
$15.000
|
$15.000
|
$17.650
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,000.000
|
$7.000
|
$7.040
|
$3.500
|
$4.000
|
$6.000
|
$29.420
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,000.000
|
$2.000
|
$1.860
|
$1.000
|
$1.000
|
$3.000
|
$11.770
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,179.000
|
$115.000
|
$186.910
|
$515.000
|
$250.000
|
$180.000
|
$269.390
|
$185.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
2,040.000
|
$25.000
|
$13.050
|
$18.000
|
$5.000
|
$40.000
|
$34.480
|
$50.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
2,040.000
|
$25.000
|
$17.710
|
$14.000
|
$5.000
|
$20.000
|
$34.480
|
$50.000
|
|
|
PORT CTB (CONNECTION HARDWARE)
|
EA
|
70.000
|
$100.000
|
$93.230
|
$55.000
|
$55.000
|
$100.000
|
$58.830
|
$85.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
1,362.000
|
$25.000
|
$125.980
|
$250.000
|
$125.000
|
$250.000
|
$176.500
|
$200.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$40.000
|
$32.630
|
$45.000
|
$40.000
|
$200.000
|
$52.950
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,500.000
|
$2,330.840
|
$3,350.000
|
$2,700.000
|
$6,000.000
|
$3,941.780
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,025.000
|
$5.000
|
$3.000
|
$2.000
|
$4.000
|
$15.000
|
$2.350
|
$2.000
|
|
|
CABLE BARRIER SYSTEM (INSTALL)(TL-3)
|
LF
|
500.000
|
$30.000
|
$30.770
|
$55.000
|
$55.000
|
$30.000
|
$64.720
|
$80.000
|
|
|
CABLE BARRIER TERM SEC (INSTL)(TL-3)
|
EA
|
2.000
|
$2,500.000
|
$6,686.990
|
$5,750.000
|
$5,750.000
|
$7,000.000
|
$6,765.740
|
$12,000.000
|
|
|
CABLE BARRIER (REMOVE)
|
LF
|
500.000
|
$5.000
|
$4.660
|
$5.000
|
$5.000
|
$20.000
|
$5.880
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,900.000
|
$3,106.110
|
$3,400.000
|
$3,500.000
|
$7,000.000
|
$3,941.780
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$400.000
|
$298.350
|
$300.000
|
$400.000
|
$500.000
|
$353.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$2,000.000
|
$932.330
|
$15.000
|
$3,000.000
|
$1,500.000
|
$17.650
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$38,536.480
|
$34,250.000
|
$29,750.000
|
$32,500.000
|
$40,300.260
|
$25,000.000
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
4.000
|
$15,000.000
|
$7,738.370
|
$8,500.000
|
$10,000.000
|
$12,000.000
|
$10,001.530
|
$10,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
24.000
|
$50.000
|
$36.360
|
$47.000
|
$50.000
|
$100.000
|
$55.300
|
$1,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,200.000
|
$792.480
|
$1,475.000
|
$1,200.000
|
$2,500.000
|
$1,735.560
|
$2,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$500.000
|
$559.400
|
$1,000.000
|
$900.000
|
$2,000.000
|
$1,176.650
|
$1,800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$160.000
|
$107.220
|
$125.000
|
$100.000
|
$200.000
|
$147.080
|
$50.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
516.000
|
$10.000
|
$7.510
|
$13.500
|
$10.000
|
$20.000
|
$15.880
|
$40.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,000.000
|
$913.690
|
$2,500.000
|
$2,100.000
|
$3,000.000
|
$2,941.630
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
7.000
|
$175.000
|
$93.230
|
$45.000
|
$140.000
|
$200.000
|
$205.910
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
12.000
|
$50.000
|
$22.880
|
$45.000
|
$55.000
|
$200.000
|
$52.950
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
3.000
|
$55.000
|
$35.890
|
$50.000
|
$55.000
|
$200.000
|
$58.830
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
12.000
|
$50.000
|
$22.880
|
$45.000
|
$55.000
|
$200.000
|
$52.950
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
3.000
|
$55.000
|
$27.970
|
$50.000
|
$55.000
|
$150.000
|
$58.830
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
3.000
|
$38.000
|
$18.650
|
$50.000
|
$10.000
|
$200.000
|
$17.650
|
$50.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,096.000
|
$0.200
|
$0.420
|
$1.000
|
$1.000
|
$3.000
|
$1.090
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
700.000
|
$0.850
|
$0.790
|
$2.750
|
$2.500
|
$6.000
|
$2.940
|
$3.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
2,793.000
|
$0.850
|
$0.750
|
$2.500
|
$2.500
|
$6.000
|
$2.940
|
$3.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,000.000
|
$0.850
|
$0.720
|
$2.500
|
$2.500
|
$6.000
|
$2.940
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
39.000
|
$9.000
|
$5.130
|
$8.000
|
$20.000
|
$50.000
|
$9.410
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,096.000
|
$1.000
|
$0.190
|
$0.800
|
$1.000
|
$2.000
|
$0.880
|
$1.000
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
6,473.000
|
$0.300
|
$2.680
|
$5.000
|
$1.500
|
$8.000
|
$1.760
|
$2.000
|
|
Totals: |
$10,602,017.650
|
$9,874,034.888
|
$10,755,504.300
|
$12,135,413.500
|
$15,148,853.300
|
$15,401,567.700
|
$16,788,393.700
|