|
|
EXCAVATION (ROADWAY)
|
CY
|
5,151.000
|
$18.000
|
$13.750
|
$16.000
|
$30.000
|
$29.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
7,722.000
|
$26.000
|
$21.000
|
$17.000
|
$30.000
|
$40.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
6.700
|
$800.000
|
$610.000
|
$1,990.000
|
$600.000
|
$1,400.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
6.700
|
$600.000
|
$500.000
|
$1,860.000
|
$500.000
|
$1,300.000
|
|
|
VEGETATIVE WATERING
|
MG
|
570.000
|
$26.000
|
$18.000
|
$85.000
|
$10.000
|
$36.500
|
|
|
MULCH
|
SY
|
993.000
|
$3.000
|
$42.000
|
$53.000
|
$15.000
|
$18.000
|
|
|
PLANT SOIL MIX
|
CY
|
166.000
|
$75.000
|
$430.000
|
$539.000
|
$100.000
|
$255.000
|
|
|
PLANT BED PREPARATION
|
SY
|
993.000
|
$3.000
|
$26.650
|
$33.500
|
$50.000
|
$2.900
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
10.000
|
$750.000
|
$970.000
|
$1,217.000
|
$1,500.000
|
$1,500.000
|
|
|
PLANT MATERIAL (30 GAL) (TREE)
|
EA
|
10.000
|
$1,200.000
|
$970.000
|
$1,217.000
|
$1,600.000
|
$1,500.000
|
|
|
PLANT MATERIAL (5 GAL) (SHRUB)
|
EA
|
12.000
|
$300.000
|
$66.000
|
$83.000
|
$1,200.000
|
$275.000
|
|
|
PLANT MAINTENANCE
|
MO
|
12.000
|
$3,000.000
|
$70.000
|
$89.000
|
$10,000.000
|
$9,400.000
|
|
|
PLANT MAINTENANCE
|
CYC
|
8.000
|
$1,000.000
|
$70.000
|
$2,880.000
|
$3,000.000
|
$5,200.000
|
|
|
VEGETATIVE WATERING
|
MG
|
54.000
|
$26.000
|
$860.000
|
$1,078.000
|
$10.000
|
$2,200.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
312.000
|
$295.000
|
$381.500
|
$385.000
|
$350.000
|
$425.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
28,846.000
|
$6.500
|
$4.150
|
$4.900
|
$10.000
|
$8.300
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,212.000
|
$5.000
|
$5.350
|
$6.100
|
$4.500
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
3,242.000
|
$5.000
|
$5.400
|
$6.800
|
$5.750
|
$5.700
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
4,860.000
|
$117.000
|
$175.000
|
$179.000
|
$135.000
|
$155.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
22,141.000
|
$97.000
|
$110.000
|
$107.250
|
$115.000
|
$127.200
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
40.000
|
$150.000
|
$169.000
|
$265.000
|
$240.000
|
$245.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
256.000
|
$350.000
|
$345.000
|
$299.000
|
$250.000
|
$275.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$900.000
|
$1,890.000
|
$2,720.000
|
$2,150.000
|
$1,200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
58.000
|
$725.000
|
$765.000
|
$812.000
|
$850.000
|
$890.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
12.000
|
$150.000
|
$265.000
|
$697.000
|
$150.000
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
30.000
|
$220.000
|
$250.000
|
$382.000
|
$195.000
|
$300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,200.000
|
$3,000.000
|
$3,755.000
|
$3,400.000
|
$1,250.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,500.000
|
$3,500.000
|
$3,755.000
|
$3,650.000
|
$4,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$900.000
|
$1,450.000
|
$1,375.000
|
$4,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
8.000
|
$50.000
|
$140.000
|
$344.000
|
$475.000
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$590,000.000
|
$630,000.000
|
$600,200.000
|
$695,000.000
|
$725,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$7,500.000
|
$30,000.000
|
$1,390.000
|
$50,000.000
|
$12,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
425.000
|
$5.000
|
$7.000
|
$15.000
|
$10.000
|
$8.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
425.000
|
$1.250
|
$4.800
|
$5.000
|
$5.000
|
$3.600
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
3,694.000
|
$9.000
|
$7.000
|
$19.000
|
$17.500
|
$13.500
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
2,019.000
|
$40.000
|
$21.000
|
$29.250
|
$25.000
|
$26.500
|
|
|
IN RD IL (TY ST) 40T-8 (250W EQ) LED
|
EA
|
22.000
|
$5,000.000
|
$5,950.000
|
$6,380.000
|
$5,000.000
|
$5,800.000
|
|
|
IN RD IL (TY ST) 50T-12 (400W EQ) LED
|
EA
|
10.000
|
$6,300.000
|
$6,600.000
|
$7,440.000
|
$5,750.000
|
$6,800.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
7,170.000
|
$18.000
|
$19.550
|
$20.000
|
$17.500
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
230.000
|
$45.000
|
$26.400
|
$40.000
|
$30.000
|
$36.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,510.000
|
$2.200
|
$1.750
|
$2.650
|
$2.000
|
$2.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
15,020.000
|
$2.500
|
$1.900
|
$3.000
|
$2.500
|
$2.750
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
4.000
|
$1,500.000
|
$1,530.000
|
$1,595.000
|
$1,500.000
|
$1,500.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$7,500.000
|
$8,450.000
|
$9,300.000
|
$7,250.000
|
$8,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
246.000
|
$32.000
|
$45.000
|
$43.200
|
$40.000
|
$39.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$1,000.000
|
$1,045.000
|
$1,295.000
|
$1,000.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,300.000
|
$1,350.000
|
$1,695.000
|
$1,500.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
9.000
|
$800.000
|
$620.000
|
$700.000
|
$550.000
|
$635.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$120.000
|
$310.000
|
$133.000
|
$100.000
|
$120.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,255.600
|
$8.000
|
$10.000
|
$11.000
|
$10.000
|
$10.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,000.000
|
$2,500.000
|
$1,995.000
|
$2,500.000
|
$1,800.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
6.000
|
$140.000
|
$190.000
|
$200.000
|
$150.000
|
$180.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
32.000
|
$140.000
|
$190.000
|
$200.000
|
$150.000
|
$180.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
6.000
|
$140.000
|
$190.000
|
$200.000
|
$150.000
|
$180.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
546.000
|
$1.000
|
$4.250
|
$4.600
|
$4.000
|
$4.850
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,376.000
|
$2.250
|
$3.200
|
$3.450
|
$3.000
|
$3.650
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
508.000
|
$4.000
|
$5.300
|
$5.750
|
$5.000
|
$6.050
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,376.000
|
$0.500
|
$1.100
|
$1.150
|
$1.000
|
$1.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
508.000
|
$1.200
|
$2.100
|
$2.300
|
$2.000
|
$2.450
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
6.000
|
$20.000
|
$53.000
|
$57.500
|
$50.000
|
$60.500
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
6.000
|
$50.000
|
$106.000
|
$115.000
|
$100.000
|
$120.000
|
|
PLOWABLE REFL PAV MRKR TY II-C-R
|
EA
|
88.000
|
$85.000
|
$106.000
|
$115.000
|
$100.000
|
$120.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,091.000
|
$1.000
|
$1.100
|
$1.150
|
$1.000
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(6")
|
LF
|
11,663.000
|
$0.150
|
$0.900
|
$1.000
|
$0.850
|
$1.050
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(8")
|
LF
|
1,376.000
|
$0.200
|
$1.150
|
$1.250
|
$1.100
|
$1.350
|
|
|
PAV SURF PREP FOR MRK (BLAST CLN)(12")
|
LF
|
508.000
|
$0.200
|
$1.850
|
$2.000
|
$1.750
|
$2.100
|
|
|
PV SRF PRP FOR MK (BLT CLN)(18"YLD TRI)
|
LF
|
14.000
|
$0.500
|
$53.000
|
$57.500
|
$50.000
|
$60.500
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,684.000
|
$182.000
|
$143.000
|
$180.500
|
$175.000
|
$170.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$9,200.000
|
$17,265.000
|
$18,500.000
|
$12,000.000
|
|
|
HPPM W/RET REQ TY I(W)6"(SLD)(100MIL)
|
LF
|
9,752.000
|
$0.750
|
$2.550
|
$2.750
|
$2.400
|
$2.900
|
|
|
HPPM W/RET REQ TY I(Y)6"(SLD)(100MIL)
|
LF
|
1,365.000
|
$0.750
|
$2.550
|
$2.750
|
$2.400
|
$2.900
|
|
|
PAVEMENT SEALER 6"
|
LF
|
11,663.000
|
$0.400
|
$1.100
|
$1.150
|
$1.000
|
$1.200
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$250.000
|
$450.000
|
$605.000
|
$750.000
|
$305.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$100.000
|
$90.000
|
$90.000
|
$95.000
|
$110.000
|
|
Totals: |
$5,701,285.850
|
$6,318,689.750
|
$6,548,087.450
|
$6,958,226.450
|
$7,315,500.700
|