PREPARING ROW
|
STA
|
222.500
|
$1,500.000
|
$1,023.500
|
$1,200.000
|
$1,500.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
475.000
|
$8.830
|
$18.710
|
$15.000
|
$30.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
14.000
|
$40.000
|
$220.800
|
$80.000
|
$100.000
|
|
|
BACKFILL (TY B)
|
STA
|
334.100
|
$265.180
|
$159.800
|
$300.000
|
$200.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
148,335.000
|
$0.750
|
$0.610
|
$0.620
|
$0.800
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
148,335.000
|
$0.170
|
$0.120
|
$0.120
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
4,746.700
|
$10.000
|
$24.920
|
$7.000
|
$15.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2"-4")
|
SY
|
2,000.000
|
$45.000
|
$44.230
|
$55.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
5,512.000
|
$4.750
|
$3.460
|
$5.000
|
$2.100
|
|
|
PLANE ASPH CONC PAV (3 1/2")
|
SY
|
144,531.000
|
$2.500
|
$3.800
|
$4.250
|
$3.100
|
|
|
ASPH BINDER(PG 64-22)
|
GAL
|
1,203.000
|
$6.000
|
$5.180
|
$3.000
|
$20.000
|
|
|
FABRIC
|
SY
|
5,512.000
|
$110.000
|
$3.210
|
$3.000
|
$10.000
|
|
|
FULL-DEPTH REPAIR CPCD (12"-14")
|
SY
|
287.000
|
$287.000
|
$698.660
|
$800.000
|
$475.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
29.000
|
$600.000
|
$805.000
|
$600.000
|
$1,015.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$665,499.000
|
$366,224.800
|
$800,000.000
|
$725,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$10,000.000
|
$20,838.310
|
$20,000.000
|
$10,500.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
38,279.000
|
$0.500
|
$0.170
|
$0.500
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$30.000
|
$31.050
|
$36.000
|
$40.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$45.000
|
$105.800
|
$110.000
|
$122.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,155.000
|
$1,725.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
325.000
|
$3.000
|
$5.750
|
$3.000
|
$7.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$175.000
|
$575.000
|
$200.000
|
$660.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,300.000
|
$4,312.500
|
$3,200.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$275.000
|
$345.000
|
$250.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$785.000
|
$1,276.500
|
$1,500.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
6.000
|
$496.080
|
$911.950
|
$1,000.000
|
$1,050.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$87.300
|
$110.400
|
$150.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$35.000
|
$49.390
|
$60.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
34,189.000
|
$0.500
|
$0.290
|
$0.270
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
36,971.000
|
$0.500
|
$0.290
|
$0.270
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
418.000
|
$4.500
|
$4.600
|
$5.000
|
$5.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
510.000
|
$4.750
|
$4.600
|
$5.000
|
$5.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
510.000
|
$4.000
|
$4.600
|
$5.000
|
$5.300
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
8,355.000
|
$2.280
|
$5.800
|
$4.000
|
$2.200
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
4,234.000
|
$0.500
|
$5.800
|
$2.000
|
$2.200
|
|
|
PAVEMENT SEALER 10"
|
LF
|
1,338.000
|
$0.500
|
$1.150
|
$1.100
|
$1.350
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
8,375.000
|
$9.820
|
$12.650
|
$12.000
|
$14.500
|
|
PREFAB PAV MRK TY C (W) (8") (DOT)
|
LF
|
814.000
|
$5.310
|
$5.750
|
$5.500
|
$6.600
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
5,715.000
|
$5.500
|
$5.750
|
$5.500
|
$6.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
495.000
|
$20.000
|
$16.100
|
$15.000
|
$18.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
1.000
|
$316.190
|
$316.250
|
$300.000
|
$365.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,122.000
|
$3.750
|
$4.600
|
$4.500
|
$5.300
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
335.000
|
$4.500
|
$4.600
|
$4.500
|
$5.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
702.000
|
$4.000
|
$4.600
|
$4.500
|
$5.300
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
35,077.000
|
$0.750
|
$0.630
|
$0.600
|
$0.750
|
|
|
NO. OF WORKING DAYS
|
$/D
|
20,440.000
|
$66.000
|
$66.000
|
$51.000
|
$60.000
|
|
|
SP MIXES SP-D PG76-22
|
TON
|
17,637.740
|
$175.000
|
$162.590
|
$165.000
|
$175.850
|
|
|
TACK COAT
|
GAL
|
18,629.000
|
$6.000
|
$5.700
|
$4.000
|
$7.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
11,173.800
|
$200.000
|
$212.520
|
$200.000
|
$216.800
|
|
|
TACK COAT
|
GAL
|
10,159.000
|
$6.000
|
$6.240
|
$4.000
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$13,031.930
|
$30,000.000
|
$24,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
5,350.000
|
$5.000
|
$5.750
|
$5.500
|
$6.600
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
35,809.000
|
$0.750
|
$0.920
|
$0.880
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
35,191.000
|
$0.750
|
$0.920
|
$0.880
|
$1.100
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
2,695.000
|
$0.630
|
$1.150
|
$1.100
|
$1.350
|
|
|
TMA (STATIONARY)
|
DAY
|
74.000
|
$150.000
|
$487.710
|
$300.000
|
$330.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$200.000
|
$898.450
|
$300.000
|
$330.000
|
|
Totals: |
$9,753,014.098
|
$9,155,620.007
|
$9,222,213.850
|
$9,788,270.769
|