Bid Cobra

CHAMBERS FM 563 (1023-01-039)

Items: 42

County: CHAMBERS
Length: 11.6290 MILES (9.8835 MILES)
Highway: FM 563
District: BEAUMONT
Control Number: 1023-01-039
DBE Goal: 0.0%
Project: STP 2026(911)HES
Guaranty: $50,000.00
Time: 60 WORKING DAYS
Engineer's Estimate: $2,493,248.19
Date: 08/05/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263027
Type: SURFACING/ROADWAY RESTORATION
Project ID: A00211687
Contract Type: FEDERAL
Project Description: 2023 HSIP CURVE (FM 563) FLASHING CHEVRONS, EDGELINE & CENTERLINE RS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (3)
E
Engineer's Estimate
$2,493,248.19
$2,499,686.76
Over/Under Est: 0.26% $6,438.57
Over/Under Est: 0.9% $22,528.81
Amt Left: 0.64% $16,090.24
Over/Under Est: 16.45% $410,140.21
Amt Left: 16.15% $403,701.64
Delta: -15.41% -$387,611.40

Bid Items & Bid Tabulations

42 Total 0 of 42
CHAMBERS  |  FM 563  |  BEAUMONT  |  1023-01-039  |  08/05/2026 1:00 PM CDT  |  $2,493,248.19  |  STP 2026(911)HES  |  SURF/ROADWAY RESTOR  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAYDEN PAVING, INC.
DURWOOD GREENE CONSTRUCTION CO.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 9.000 $3,800.000 $2,000.000 $3,500.000 $1,600.000
REMOV CONC (CURB)
LF 180.000 $18.000 $25.000 $25.000 $5.400
BACKFILL (TY A OR B)
STA 24.000 $200.000 $2,300.000 $500.000 $2,000.000
SPEC EXCAV WORK (BACKHOE)
HR 40.000 $172.000 $120.000 $125.000 $149.000
HYDRO MULCH SEED (TEMP_WARM_COOL)
SY 24,365.000 $0.400 $0.450 $0.400 $0.400
VEGETATIVE WATERING
TGL 204.000 $100.000 $20.000 $25.000 $33.550
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 4,482.000 $130.000 $137.000 $140.000 $139.000
TACK COAT
GAL 2,173.000 $3.750 $10.000 $4.000 $6.000
SP MIXES SP-C SAC-A PG76-22
TON 5,975.000 $140.000 $158.000 $157.000 $160.000
TACK COAT
GAL 3,260.000 $3.750 $5.000 $4.000 $6.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 464.000 $85.000 $125.000 $100.000 $95.000
PLANE ASPH PAV (0" TO 3.5")
SY 844.000 $6.600 $15.000 $15.000 $19.000
MOBILIZATION
LS 1.000 $229,110.010 $133,775.000 $120,000.000 $91,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $8,000.000 $15,000.000 $6,000.000 $4,845.000
TMA (STATIONARY)
DAY 31.000 $300.000 $425.000 $350.000 $255.000
TMA (MOBILE OPERATION)
DAY 28.000 $250.000 $250.000 $250.000 $728.000
DRIVEWAYS (BASE)
SY 1,385.000 $45.000 $23.000 $35.000 $33.000
DRIVEWAYS AND TURNOUTS (ACP)
SY 4,789.000 $60.000 $16.860 $35.000 $19.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 18,274.000 $0.920 $0.420 $0.650 $0.250
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 17.000 $305.000 $525.000 $325.000 $1,000.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 3.000 $300.000 $560.000 $370.000 $516.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $605.000 $1,020.000 $700.000 $3,000.000
CONDT (PVC) (SCH 40) (3/4")
LF 1,740.000 $11.000 $14.000 $14.000 $13.300
CONDT (PVC) (SCH 40) (3/4") (BORE)
LF 260.000 $30.000 $24.000 $24.000 $23.000
ELEC CONDR (NO.10) INSULATED
LF 4,000.000 $2.000 $2.050 $2.100 $1.900
ELEC CONDR (NO.8) BARE
LF 2,000.000 $2.200 $2.000 $2.000 $1.900
GROUND BOX TY A (122311)
EA 1.000 $1,200.000 $785.000 $800.000 $698.000
ELC SRV TY T 120/240 000(NS)GS(N)SP(U)
EA 1.000 $8,000.000 $7,400.000 $6,880.000 $6,905.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 930.000 $1.500 $0.500 $3.000 $1.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,595.000 $1.450 $0.500 $3.000 $1.600
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 675.000 $1.200 $1.000 $13.500 $1.500
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 36,548.000 $0.900 $0.790 $1.000 $1.100
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 3,080.000 $0.700 $0.630 $0.950 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 14,816.000 $0.900 $0.620 $0.900 $1.000
PREFAB PM TY C (W)(24")(SLD)
LF 51.000 $12.000 $14.250 $40.000 $20.750
PREFAB PM TY C (W)(ARROW)
EA 2.000 $250.000 $241.000 $276.000 $287.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 10.000 $55.000 $67.000 $28.000 $58.500
REFL PAV MRKR TY I-C
EA 16.000 $5.000 $5.500 $9.000 $7.450
REFL PAV MRKR TY II-A-A
EA 271.000 $5.600 $4.400 $9.000 $7.450
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 13.000 $5,100.000 $5,500.000 $5,200.000 $9,975.000
LEAD LED CHEVRON
EA 6.000 $1,700.000 $3,000.000 $2,800.000 $6,011.000
LED CHEVRON
EA 76.000 $1,250.000 $2,650.000 $2,500.000 $7,300.000
Totals: $2,493,248.190 $2,499,686.760 $2,515,777.000 $2,903,388.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
Total: $8,000.00