PREPARING ROW
|
STA
|
21.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$9,500.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
21.000
|
$380.300
|
$575.000
|
$1,400.000
|
$850.000
|
|
|
|
BACKFILL (TY A OR B)
|
STA
|
21.000
|
$250.600
|
$1,250.000
|
$600.000
|
$450.000
|
|
|
|
BLADING
|
LF
|
500.000
|
$5.200
|
$25.000
|
$7.000
|
$50.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
10,049.000
|
$0.180
|
$0.250
|
$0.160
|
$1.000
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
10,049.000
|
$0.200
|
$0.250
|
$0.160
|
$1.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
20,098.000
|
$0.500
|
$0.540
|
$0.420
|
$1.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
81.000
|
$19.900
|
$20.000
|
$100.000
|
$50.000
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
414.000
|
$5.000
|
$44.000
|
$11.000
|
$20.000
|
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
33.100
|
$180.000
|
$150.000
|
$430.000
|
$600.000
|
|
|
|
CEM STABIL BKFL (SPL)
|
CY
|
71.000
|
$156.500
|
$250.000
|
$120.000
|
$350.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$134.700
|
$350.000
|
$270.000
|
$300.000
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
40.000
|
$283.200
|
$450.000
|
$625.000
|
$450.000
|
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$9,200.000
|
$5,500.000
|
$8,400.000
|
$12,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,429.500
|
$1,200.000
|
$1,050.000
|
$2,200.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,413.600
|
$1,500.000
|
$1,300.000
|
$2,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$2,645.000
|
$2,500.000
|
$1,450.000
|
$2,500.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,520.000
|
$3,000.000
|
$2,100.000
|
$3,500.000
|
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$8,660.900
|
$8,500.000
|
$7,600.000
|
$10,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
62.000
|
$66.000
|
$60.000
|
$42.000
|
$50.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$145,509.070
|
$125,000.000
|
$123,500.000
|
$200,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,710.000
|
$5,000.000
|
$2,000.000
|
$8,500.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
274.000
|
$52.800
|
$45.000
|
$57.000
|
$30.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
274.000
|
$13.200
|
$10.000
|
$15.400
|
$15.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
280.000
|
$5.300
|
$5.000
|
$7.000
|
$18.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
280.000
|
$1.200
|
$1.500
|
$2.600
|
$9.000
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,212.000
|
$43.100
|
$53.500
|
$50.000
|
$55.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
17,574.000
|
$0.150
|
$0.100
|
$0.100
|
$0.500
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
9,161.000
|
$0.150
|
$0.120
|
$0.120
|
$0.500
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$239.600
|
$440.000
|
$300.000
|
$1,000.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$619.200
|
$640.000
|
$550.000
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$816.500
|
$960.000
|
$1,000.000
|
$1,500.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$805.000
|
$730.000
|
$1,050.000
|
$1,500.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$82.800
|
$130.000
|
$100.000
|
$100.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$26.900
|
$75.000
|
$10.500
|
$100.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
12.000
|
$85.000
|
$110.000
|
$80.000
|
$100.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
18,322.000
|
$0.450
|
$0.570
|
$0.650
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
800.000
|
$2.100
|
$1.000
|
$2.400
|
$6.000
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
17,574.000
|
$0.520
|
$0.970
|
$0.900
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
2,290.000
|
$0.610
|
$0.970
|
$1.500
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
2,677.000
|
$0.540
|
$0.970
|
$1.300
|
$1.000
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
41.000
|
$11.700
|
$22.100
|
$20.000
|
$20.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
148.000
|
$5.300
|
$7.000
|
$7.250
|
$6.000
|
|
|
|
FULL - WIDTH MOWING
|
AC
|
16.000
|
$370.000
|
$200.000
|
$1,375.000
|
$3,500.000
|
|
|
|
LITTER REMOVAL
|
AC
|
16.000
|
$111.000
|
$400.000
|
$630.000
|
$1,500.000
|
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
8,771.000
|
$2.500
|
$7.750
|
$15.500
|
$10.000
|
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
1,361.000
|
$173.300
|
$150.100
|
$140.000
|
$150.000
|
|
|
|
D-GR HMA TY-D PG64-22 (LEVEL-UP)
|
TON
|
33.000
|
$117.700
|
$663.000
|
$450.000
|
$165.000
|
|
|
|
TACK COAT
|
GAL
|
1,186.000
|
$6.700
|
$4.000
|
$6.250
|
$10.000
|
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
3,509.000
|
$180.000
|
$153.650
|
$165.000
|
$175.000
|
|
|
|
TACK COAT
|
GAL
|
3,190.000
|
$3.000
|
$4.000
|
$7.250
|
$10.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
118.000
|
$80.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
96.000
|
$120.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
97.000
|
$290.000
|
$100.000
|
$315.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$288.800
|
$100.000
|
$220.000
|
$550.000
|
|
|
|
SOLAR POWERED LED WARNING SIGN
|
EA
|
3.000
|
$500.000
|
$2,500.000
|
$2,550.000
|
$4,500.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)(ALT)
|
LF
|
118.000
|
$80.000
|
$70.000
|
$130.000
|
$250.000
|
|
2
|
|
RC PIPE (CL III) (24 IN) (ALT)
|
LF
|
96.000
|
$120.000
|
$160.000
|
$150.000
|
$250.000
|
|
Totals: |
$1,621,559.800
|
$1,564,314.750
|
$1,671,039.660
|
$2,204,514.500
|