REMOVING CONC (DRIVEWAYS)
|
SY
|
194.000
|
$18.000
|
$26.000
|
$15.000
|
$25.000
|
$22.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
160.000
|
$280.000
|
$250.000
|
$250.000
|
$610.000
|
$550.000
|
$450.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
527.000
|
$20.000
|
$39.000
|
$25.000
|
$25.000
|
$60.000
|
$22.000
|
|
|
BACKFILL (TY A)
|
STA
|
160.000
|
$230.000
|
$452.000
|
$350.000
|
$320.000
|
$620.000
|
$600.000
|
|
|
BLADING
|
STA
|
160.000
|
$180.000
|
$186.000
|
$300.000
|
$178.000
|
$304.000
|
$350.000
|
|
|
BLADING
|
HR
|
16.000
|
$200.000
|
$410.000
|
$100.000
|
$252.000
|
$152.000
|
$125.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
42,680.000
|
$1.100
|
$1.220
|
$1.000
|
$1.800
|
$1.400
|
$2.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
21,340.000
|
$0.140
|
$0.120
|
$0.150
|
$0.110
|
$0.130
|
$0.130
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
42,680.000
|
$0.400
|
$0.630
|
$0.600
|
$0.620
|
$0.650
|
$0.700
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
21,340.000
|
$0.680
|
$0.550
|
$0.600
|
$0.560
|
$0.650
|
$0.610
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
21,340.000
|
$0.680
|
$0.530
|
$0.600
|
$0.550
|
$0.600
|
$0.580
|
|
|
VEGETATIVE WATERING
|
MG
|
939.000
|
$10.000
|
$8.250
|
$0.010
|
$33.000
|
$1.000
|
$10.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
20,843.000
|
$4.500
|
$4.700
|
$5.000
|
$4.400
|
$4.700
|
$5.500
|
|
|
AGG (TY-PD GR-3 OR TY-PL GR-3 SAC-A)
|
CY
|
451.000
|
$130.000
|
$179.000
|
$170.000
|
$180.000
|
$190.000
|
$185.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$45.000
|
$70.000
|
$70.000
|
$66.000
|
$100.000
|
$70.000
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
369.000
|
$1.500
|
$1.500
|
$7.000
|
$10.000
|
$5.000
|
$6.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
48,636.000
|
$2.250
|
$1.500
|
$7.500
|
$2.600
|
$5.000
|
$2.500
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
622.000
|
$2.500
|
$1.500
|
$7.000
|
$9.000
|
$5.000
|
$6.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.000
|
$500.000
|
$1,965.000
|
$650.000
|
$2,000.000
|
$3,000.000
|
$1,100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
16.000
|
$600.000
|
$640.000
|
$900.000
|
$735.000
|
$770.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
44.000
|
$525.000
|
$595.000
|
$900.000
|
$785.000
|
$830.000
|
$625.000
|
|
|
RAIL (TY T222)
|
LF
|
24.000
|
$100.000
|
$265.000
|
$150.000
|
$225.000
|
$1,000.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
684.000
|
$60.000
|
$44.000
|
$65.000
|
$63.000
|
$66.000
|
$80.000
|
|
|
SET (TY I)(S=2 FT)(HW=4FT)(4:1)(C)
|
EA
|
1.000
|
$6,000.000
|
$7,925.000
|
$5,750.000
|
$7,350.000
|
$7,700.000
|
$4,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
3.000
|
$9,000.000
|
$12,210.000
|
$7,100.000
|
$8,900.000
|
$9,400.000
|
$5,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$19,260.000
|
$15,000.000
|
$15,750.000
|
$16,500.000
|
$13,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
50.000
|
$850.000
|
$905.000
|
$800.000
|
$1,050.000
|
$1,100.000
|
$1,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
15.000
|
$1,400.000
|
$1,000.000
|
$750.000
|
$2,100.000
|
$2,200.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$1,600.000
|
$1,700.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
26.000
|
$350.000
|
$465.000
|
$600.000
|
$1,250.000
|
$1,300.000
|
$600.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$143,500.000
|
$195,000.000
|
$455,000.000
|
$380,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$6,000.000
|
$2,500.000
|
$3,500.000
|
$3,900.000
|
$4,400.000
|
$7,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
400.000
|
$30.000
|
$30.000
|
$35.000
|
$32.000
|
$34.100
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
720.000
|
$33.000
|
$32.000
|
$35.000
|
$34.000
|
$38.500
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,120.000
|
$8.000
|
$9.000
|
$8.000
|
$9.500
|
$8.800
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$40.000
|
$39.000
|
$35.000
|
$29.000
|
$56.000
|
$30.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
40.000
|
$70.000
|
$95.000
|
$75.000
|
$175.000
|
$84.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,400.000
|
$3.000
|
$3.000
|
$3.100
|
$3.150
|
$3.300
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,400.000
|
$0.700
|
$0.700
|
$0.850
|
$0.750
|
$1.100
|
$0.750
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
40.000
|
$85.000
|
$165.000
|
$125.000
|
$190.000
|
$116.000
|
$150.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
320.000
|
$55.000
|
$67.000
|
$45.000
|
$65.000
|
$71.250
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,510.000
|
$50.000
|
$49.320
|
$55.000
|
$45.000
|
$40.100
|
$45.000
|
|
|
TURNOUTS (ACP)
|
SY
|
228.000
|
$55.000
|
$86.000
|
$100.000
|
$45.000
|
$56.250
|
$60.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
194.000
|
$95.000
|
$117.000
|
$120.000
|
$158.000
|
$165.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
23,620.000
|
$0.200
|
$0.500
|
$0.070
|
$0.200
|
$0.370
|
$0.600
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
11,810.000
|
$0.200
|
$0.500
|
$0.070
|
$0.200
|
$0.550
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
400.000
|
$25.000
|
$22.250
|
$25.000
|
$24.000
|
$28.100
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,600.000
|
$1,900.000
|
$3,400.000
|
$2,000.000
|
$1,800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$2.250
|
$2.000
|
$2.000
|
$2.100
|
$2.800
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$250.000
|
$200.000
|
$200.000
|
$210.000
|
$275.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$2,750.000
|
$2,950.000
|
$2,900.000
|
$3,000.000
|
$3,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
17.000
|
$300.000
|
$304.000
|
$150.000
|
$320.000
|
$248.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
2.000
|
$400.000
|
$337.000
|
$350.000
|
$355.000
|
$248.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
37.000
|
$625.000
|
$627.000
|
$750.000
|
$660.000
|
$630.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$800.000
|
$762.000
|
$850.000
|
$800.000
|
$810.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$850.000
|
$1,281.000
|
$1,500.000
|
$1,350.000
|
$1,300.000
|
$1,400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
42.000
|
$75.000
|
$89.000
|
$100.000
|
$140.000
|
$121.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$30.000
|
$25.000
|
$50.000
|
$26.000
|
$36.300
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
30.000
|
$100.000
|
$55.000
|
$75.000
|
$58.000
|
$110.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
31,946.000
|
$0.250
|
$0.300
|
$0.330
|
$0.320
|
$0.330
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
168.000
|
$4.000
|
$4.000
|
$4.500
|
$4.200
|
$4.400
|
$4.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
23,317.000
|
$0.250
|
$0.300
|
$0.310
|
$0.320
|
$0.330
|
$0.330
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
168.000
|
$9.250
|
$9.600
|
$18.000
|
$23.000
|
$11.000
|
$14.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,246.000
|
$1.000
|
$1.600
|
$3.500
|
$1.250
|
$2.200
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
800.000
|
$1.000
|
$1.250
|
$1.000
|
$1.900
|
$2.200
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
168.000
|
$6.500
|
$6.000
|
$6.500
|
$6.300
|
$6.600
|
$7.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
31,946.000
|
$0.350
|
$0.550
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,840.000
|
$0.350
|
$1.000
|
$1.000
|
$1.050
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
23,317.000
|
$0.350
|
$0.550
|
$0.600
|
$0.600
|
$0.600
|
$0.600
|
|
PREFAB PAV MRK TY C (Y) (4") (SLD)
|
LF
|
550.000
|
$4.000
|
$5.000
|
$5.000
|
$5.250
|
$5.500
|
$6.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
66.000
|
$4.000
|
$4.000
|
$5.000
|
$4.200
|
$4.400
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
325.000
|
$3.500
|
$4.000
|
$5.000
|
$4.200
|
$4.400
|
$4.500
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
5,494.000
|
$120.000
|
$135.000
|
$140.000
|
$130.000
|
$145.000
|
$175.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
5,418.000
|
$150.000
|
$135.000
|
$145.000
|
$146.000
|
$146.000
|
$170.000
|
|
|
TACK COAT
|
GAL
|
4,926.000
|
$2.500
|
$4.000
|
$4.500
|
$4.250
|
$4.400
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,200.000
|
$11,500.000
|
$10,000.000
|
$13,000.000
|
$15,000.000
|
$20,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
29.000
|
$10.000
|
$20.000
|
$10.000
|
$21.000
|
$22.000
|
$25.000
|
|
|
TMA (STATIONARY)
|
DAY
|
105.000
|
$200.000
|
$150.000
|
$150.000
|
$245.000
|
$421.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
9.000
|
$300.000
|
$0.010
|
$100.000
|
$160.000
|
$760.000
|
$500.000
|
|
Totals: |
$2,987,393.300
|
$3,018,317.590
|
$3,447,826.740
|
$3,563,607.860
|
$3,869,451.590
|
$3,998,289.390
|