PREPARING ROW
|
STA
|
7.200
|
$1,700.000
|
$2,500.000
|
$2,000.000
|
$4,000.000
|
$1,000.000
|
$3,500.000
|
$5,000.000
|
$3,000.000
|
$9,500.000
|
$801.000
|
$10,000.000
|
$2,500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
1,793.000
|
$14.000
|
$30.000
|
$35.000
|
$30.000
|
$30.000
|
$22.000
|
$20.000
|
$22.000
|
$25.000
|
$19.000
|
$35.000
|
$30.000
|
|
|
BLADING
|
STA
|
70.300
|
$300.000
|
$500.000
|
$500.000
|
$100.000
|
$2,000.000
|
$850.000
|
$400.000
|
$200.000
|
$200.000
|
$14.000
|
$150.000
|
$300.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
7,123.000
|
$1.400
|
$5.000
|
$1.000
|
$4.000
|
$2.250
|
$2.500
|
$4.000
|
$2.700
|
$14.000
|
$3.500
|
$4.500
|
$5.750
|
|
|
BLOCK SODDING
|
SY
|
1,866.000
|
$3.000
|
$5.000
|
$5.000
|
$8.000
|
$9.000
|
$6.000
|
$4.500
|
$10.000
|
$5.000
|
$4.400
|
$5.000
|
$5.500
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
7,123.000
|
$1.250
|
$1.000
|
$1.100
|
$1.500
|
$2.000
|
$2.000
|
$1.000
|
$1.750
|
$1.000
|
$1.000
|
$1.000
|
$1.010
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
3,562.000
|
$1.250
|
$1.000
|
$1.150
|
$2.000
|
$2.000
|
$2.000
|
$1.200
|
$1.600
|
$1.000
|
$1.100
|
$1.000
|
$1.200
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
3,562.000
|
$1.250
|
$1.000
|
$1.100
|
$2.000
|
$1.000
|
$2.000
|
$1.200
|
$1.600
|
$1.000
|
$1.100
|
$1.000
|
$1.250
|
|
|
VEGETATIVE WATERING
|
MG
|
198.200
|
$20.000
|
$50.000
|
$85.000
|
$150.000
|
$12.000
|
$40.000
|
$15.000
|
$30.000
|
$10.000
|
$178.700
|
$100.000
|
$60.000
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
1.500
|
$21.000
|
$100.000
|
$300.000
|
$500.000
|
$500.000
|
$1,000.000
|
$300.000
|
$150.000
|
$500.000
|
$169.700
|
$2,000.000
|
$1,000.000
|
|
|
CUT & RESTORING PAV
|
SY
|
47.000
|
$120.000
|
$150.000
|
$150.000
|
$200.000
|
$80.000
|
$125.000
|
$150.000
|
$250.000
|
$100.000
|
$29.600
|
$20.000
|
$240.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
36.000
|
$65.000
|
$180.000
|
$100.000
|
$200.000
|
$120.000
|
$225.000
|
$150.000
|
$300.000
|
$135.000
|
$86.000
|
$20.000
|
$160.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
230.000
|
$40.000
|
$75.000
|
$115.000
|
$150.000
|
$90.000
|
$86.000
|
$80.000
|
$80.000
|
$120.000
|
$93.000
|
$150.000
|
$120.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
325.000
|
$10.000
|
$45.000
|
$45.000
|
$40.000
|
$80.000
|
$55.000
|
$50.000
|
$75.000
|
$58.000
|
$25.300
|
$100.000
|
$90.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
40.000
|
$250.000
|
$250.000
|
$200.000
|
$250.000
|
$150.000
|
$375.000
|
$250.000
|
$225.000
|
$150.000
|
$132.000
|
$400.000
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,412.000
|
$30.000
|
$55.000
|
$30.000
|
$10.000
|
$30.000
|
$65.000
|
$45.000
|
$20.000
|
$60.000
|
$61.300
|
$45.000
|
$45.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
26.000
|
$1,000.000
|
$1,500.000
|
$400.000
|
$1,250.000
|
$400.000
|
$500.000
|
$1,500.000
|
$800.000
|
$1,500.000
|
$1,061.000
|
$1,500.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
39.000
|
$440.000
|
$600.000
|
$550.000
|
$550.000
|
$550.000
|
$550.000
|
$550.000
|
$450.000
|
$500.000
|
$94.000
|
$650.000
|
$900.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
56.000
|
$170.000
|
$180.000
|
$170.000
|
$225.000
|
$200.000
|
$225.000
|
$200.000
|
$200.000
|
$250.000
|
$274.000
|
$185.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
112.000
|
$500.000
|
$400.000
|
$450.000
|
$475.000
|
$550.000
|
$550.000
|
$550.000
|
$600.000
|
$550.000
|
$389.000
|
$550.000
|
$450.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
591.000
|
$150.000
|
$80.000
|
$142.000
|
$200.000
|
$165.000
|
$90.000
|
$145.000
|
$210.000
|
$210.000
|
$153.000
|
$185.000
|
$165.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
11.000
|
$500.000
|
$500.000
|
$550.000
|
$400.000
|
$500.000
|
$1,120.000
|
$1,000.000
|
$950.000
|
$900.000
|
$1,437.000
|
$750.000
|
$1,650.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
8.000
|
$800.000
|
$500.000
|
$700.000
|
$500.000
|
$500.000
|
$1,500.000
|
$1,000.000
|
$1,300.000
|
$780.000
|
$2,436.000
|
$850.000
|
$2,200.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
8.000
|
$700.000
|
$600.000
|
$700.000
|
$550.000
|
$750.000
|
$1,500.000
|
$1,000.000
|
$1,315.000
|
$900.000
|
$2,455.000
|
$850.000
|
$2,200.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
12.000
|
$800.000
|
$700.000
|
$750.000
|
$600.000
|
$750.000
|
$1,800.000
|
$1,000.000
|
$1,330.000
|
$925.000
|
$2,642.000
|
$850.000
|
$1,500.000
|
|
|
CONC BOX CULV (7 FT X 6 FT)(EXTEND)
|
LF
|
32.000
|
$800.000
|
$750.000
|
$800.000
|
$700.000
|
$950.000
|
$1,500.000
|
$1,500.000
|
$1,415.000
|
$750.000
|
$2,494.000
|
$950.000
|
$1,500.000
|
|
|
CONC BOX CULV (5 FT X 2.5 FT) (EXTEND)
|
LF
|
8.000
|
$550.000
|
$500.000
|
$1,000.000
|
$425.000
|
$500.000
|
$1,200.000
|
$1,000.000
|
$1,280.000
|
$750.000
|
$2,416.000
|
$750.000
|
$2,500.000
|
|
|
CONC BOX CULV (4 FT X 7 FT) (EXTEND)
|
LF
|
6.000
|
$900.000
|
$800.000
|
$1,000.000
|
$575.000
|
$700.000
|
$1,700.000
|
$1,000.000
|
$2,115.000
|
$1,250.000
|
$3,748.000
|
$750.000
|
$2,600.000
|
|
|
CONC BOX CULV (6 FT X 3.5 FT)(EXTEND)
|
LF
|
14.000
|
$730.000
|
$600.000
|
$1,000.000
|
$525.000
|
$800.000
|
$1,700.000
|
$1,000.000
|
$1,155.000
|
$1,000.000
|
$2,586.000
|
$850.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,132.000
|
$60.000
|
$35.000
|
$45.000
|
$50.000
|
$52.000
|
$48.000
|
$55.000
|
$45.000
|
$54.000
|
$62.000
|
$65.000
|
$52.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
256.000
|
$50.000
|
$45.000
|
$55.000
|
$75.000
|
$70.000
|
$80.000
|
$70.000
|
$60.000
|
$75.000
|
$80.000
|
$85.000
|
$69.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
130.000
|
$75.000
|
$57.000
|
$75.000
|
$155.000
|
$140.000
|
$100.000
|
$90.000
|
$120.000
|
$85.000
|
$92.000
|
$95.000
|
$93.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
142.000
|
$95.000
|
$100.000
|
$95.000
|
$225.000
|
$140.000
|
$125.000
|
$125.000
|
$250.000
|
$140.000
|
$104.000
|
$125.000
|
$120.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$5,000.000
|
$5,000.000
|
$4,800.000
|
$7,500.000
|
$5,000.000
|
$4,200.000
|
$5,000.000
|
$10,000.000
|
$6,800.000
|
$5,415.000
|
$5,000.000
|
$7,500.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$6,200.000
|
$4,500.000
|
$7,000.000
|
$5,200.000
|
$7,000.000
|
$4,100.000
|
$6,500.000
|
$7,000.000
|
$5,500.000
|
$20,805.000
|
$5,500.000
|
$7,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
3.000
|
$6,800.000
|
$6,000.000
|
$7,500.000
|
$6,500.000
|
$8,000.000
|
$5,300.000
|
$7,500.000
|
$10,000.000
|
$6,300.000
|
$21,416.000
|
$6,000.000
|
$8,500.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
2.000
|
$12,000.000
|
$7,000.000
|
$7,850.000
|
$13,000.000
|
$9,000.000
|
$7,800.000
|
$12,500.000
|
$16,000.000
|
$12,000.000
|
$20,973.000
|
$10,000.000
|
$12,000.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$13,500.000
|
$7,500.000
|
$8,500.000
|
$15,000.000
|
$11,000.000
|
$9,000.000
|
$12,500.000
|
$17,000.000
|
$12,980.000
|
$20,289.000
|
$11,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$750.000
|
$450.000
|
$550.000
|
$700.000
|
$750.000
|
$650.000
|
$600.000
|
$525.000
|
$680.000
|
$1,029.000
|
$550.000
|
$545.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
76.000
|
$750.000
|
$550.000
|
$625.000
|
$750.000
|
$820.000
|
$725.000
|
$685.000
|
$625.000
|
$700.000
|
$837.000
|
$650.000
|
$645.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$1,000.000
|
$600.000
|
$900.000
|
$900.000
|
$1,400.000
|
$800.000
|
$800.000
|
$910.000
|
$785.000
|
$944.000
|
$850.000
|
$780.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,100.000
|
$800.000
|
$1,050.000
|
$950.000
|
$1,400.000
|
$1,100.000
|
$1,200.000
|
$1,050.000
|
$800.000
|
$1,057.000
|
$850.000
|
$1,050.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$800.000
|
$1,300.000
|
$1,250.000
|
$1,600.000
|
$1,200.000
|
$1,200.000
|
$1,210.000
|
$1,500.000
|
$1,410.000
|
$1,100.000
|
$1,275.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,700.000
|
$1,175.000
|
$1,500.000
|
$1,300.000
|
$1,650.000
|
$1,300.000
|
$1,400.000
|
$1,530.000
|
$1,900.000
|
$1,638.000
|
$1,100.000
|
$1,250.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$1,900.000
|
$1,900.000
|
$1,600.000
|
$2,100.000
|
$2,100.000
|
$2,000.000
|
$1,800.000
|
$1,600.000
|
$1,900.000
|
$1,889.000
|
$1,100.000
|
$1,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,400.000
|
$2,126.000
|
$1,850.000
|
$2,700.000
|
$3,000.000
|
$3,000.000
|
$3,000.000
|
$2,550.000
|
$3,135.000
|
$1,788.000
|
$3,000.000
|
$1,800.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$1,800.000
|
$1,500.000
|
$1,000.000
|
$800.000
|
$500.000
|
$2,500.000
|
$2,500.000
|
$2,000.000
|
$1,600.000
|
$1,459.000
|
$1,000.000
|
$2,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
155.000
|
$18.000
|
$30.000
|
$20.000
|
$10.000
|
$5.000
|
$30.000
|
$25.000
|
$30.000
|
$26.000
|
$29.000
|
$30.000
|
$60.000
|
|
|
REMOV STR (PIPE)
|
EA
|
44.000
|
$400.000
|
$250.000
|
$250.000
|
$150.000
|
$125.000
|
$1,100.000
|
$650.000
|
$400.000
|
$420.000
|
$135.000
|
$350.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$93,581.000
|
$100,000.000
|
$100,000.000
|
$110,000.000
|
$100,000.000
|
$100,000.000
|
$115,000.000
|
$130,000.000
|
$130,000.000
|
$63,639.000
|
$145,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$4,000.000
|
$2,500.000
|
$10,000.000
|
$2,500.000
|
$3,000.000
|
$3,500.000
|
$11,000.000
|
$7,000.000
|
$3,000.000
|
$1,650.000
|
$8,500.000
|
$3,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
210.000
|
$30.000
|
$25.000
|
$28.000
|
$35.000
|
$20.000
|
$40.000
|
$27.000
|
$30.000
|
$32.000
|
$19.000
|
$30.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
210.000
|
$8.000
|
$10.000
|
$9.600
|
$5.000
|
$6.000
|
$20.000
|
$6.000
|
$6.000
|
$9.500
|
$34.000
|
$15.000
|
$12.000
|
|
|
EXCAV (EROSN & SEDMT CONT, IN VEH)
|
CY
|
200.000
|
$25.000
|
$20.000
|
$50.000
|
$35.000
|
$80.000
|
$40.000
|
$40.000
|
$17.000
|
$50.000
|
$30.000
|
$30.000
|
$200.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$115.000
|
$50.000
|
$150.000
|
$1.000
|
$75.000
|
$85.000
|
$85.000
|
$50.000
|
$200.000
|
$99.000
|
$150.000
|
$175.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,420.000
|
$2.750
|
$3.000
|
$3.000
|
$3.000
|
$5.000
|
$3.000
|
$3.000
|
$3.000
|
$3.000
|
$3.100
|
$4.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,420.000
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$0.800
|
$1.000
|
$1.000
|
$2.000
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
420.000
|
$5.000
|
$5.000
|
$5.600
|
$8.000
|
$5.000
|
$4.000
|
$5.500
|
$8.000
|
$9.500
|
$6.000
|
$12.000
|
$6.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
420.000
|
$0.500
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
$2.000
|
$1.150
|
$1.000
|
$0.500
|
$4.000
|
$8.000
|
$1.250
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
30.000
|
$230.000
|
$100.000
|
$150.000
|
$10.000
|
$85.000
|
$125.000
|
$100.000
|
$145.000
|
$175.000
|
$173.000
|
$350.000
|
$254.910
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
120.000
|
$20.000
|
$50.000
|
$45.000
|
$35.000
|
$40.000
|
$40.000
|
$35.000
|
$18.000
|
$15.000
|
$196.000
|
$20.000
|
$40.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
60.000
|
$20.000
|
$50.000
|
$38.000
|
$40.000
|
$40.000
|
$50.000
|
$65.000
|
$70.000
|
$20.000
|
$194.000
|
$55.000
|
$75.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
60.000
|
$20.000
|
$25.000
|
$38.000
|
$25.000
|
$40.000
|
$50.000
|
$40.000
|
$70.000
|
$14.000
|
$194.000
|
$20.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$20.000
|
$20.000
|
$22.000
|
$22.000
|
$19.000
|
$25.000
|
$21.500
|
$26.000
|
$18.500
|
$20.000
|
$25.000
|
$21.200
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,600.000
|
$1,400.000
|
$1,552.000
|
$2,000.000
|
$1,370.000
|
$1,500.000
|
$1,500.000
|
$1,700.000
|
$1,700.000
|
$1,739.000
|
$1,850.000
|
$1,465.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$2.500
|
$3.000
|
$2.900
|
$3.000
|
$4.000
|
$5.000
|
$3.000
|
$5.000
|
$2.500
|
$4.000
|
$3.000
|
$2.850
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$210.000
|
$220.000
|
$230.000
|
$700.000
|
$100.000
|
$125.000
|
$220.000
|
$170.000
|
$315.000
|
$337.000
|
$500.000
|
$230.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$150.000
|
$175.000
|
$700.000
|
$200.000
|
$250.000
|
$175.000
|
$300.000
|
$315.000
|
$337.000
|
$500.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,200.000
|
$2,150.000
|
$2,475.000
|
$2,400.000
|
$2,000.000
|
$2,500.000
|
$2,400.000
|
$2,600.000
|
$2,500.000
|
$2,412.000
|
$2,850.000
|
$2,325.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,000.000
|
$15,900.000
|
$18,285.000
|
$20,000.000
|
$10,000.000
|
$3,600.000
|
$12,000.000
|
$18,000.000
|
$16,000.000
|
$10,547.000
|
$15,000.000
|
$17,200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$10,000.000
|
$2,500.000
|
$3,740.000
|
$4,500.000
|
$2,800.000
|
$1,500.000
|
$2,800.000
|
$2,000.000
|
$5,000.000
|
$3,647.000
|
$5,000.000
|
$2,730.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$700.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$800.000
|
$1,800.000
|
$1,100.000
|
$1,200.000
|
$2,000.000
|
$2,076.000
|
$2,500.000
|
$1,135.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
18.000
|
$28.000
|
$20.000
|
$20.000
|
$65.000
|
$20.000
|
$60.000
|
$17.000
|
$20.000
|
$26.000
|
$26.000
|
$100.000
|
$19.250
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
42.000
|
$65.000
|
$45.000
|
$50.000
|
$65.000
|
$60.000
|
$50.000
|
$50.000
|
$60.000
|
$67.000
|
$70.000
|
$100.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
27.000
|
$50.000
|
$35.000
|
$20.000
|
$65.000
|
$40.000
|
$50.000
|
$30.000
|
$28.000
|
$28.000
|
$30.000
|
$100.000
|
$29.000
|
|
Totals: |
$1,042,386.450
|
$1,037,127.000
|
$1,136,565.800
|
$1,207,937.500
|
$1,253,005.150
|
$1,265,342.500
|
$1,299,803.800
|
$1,322,623.750
|
$1,399,457.000
|
$1,407,147.890
|
$1,428,805.500
|
$1,452,717.680
|