|
|
PREPARING ROW
|
STA
|
36.000
|
$1,500.000
|
$800.000
|
$1,200.000
|
$1,500.000
|
$1,700.000
|
$2,600.000
|
$3,200.000
|
$1,400.000
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
57.000
|
$15.000
|
$12.000
|
$20.000
|
$10.000
|
$21.000
|
$15.000
|
$45.000
|
$21.000
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
3,857.000
|
$3.250
|
$2.970
|
$3.000
|
$3.750
|
$22.000
|
$9.000
|
$10.000
|
$3.190
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,668.000
|
$7.000
|
$7.500
|
$7.500
|
$8.000
|
$8.750
|
$7.000
|
$15.000
|
$9.500
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
2,113.000
|
$10.000
|
$9.000
|
$9.000
|
$11.000
|
$12.000
|
$8.000
|
$19.000
|
$26.000
|
$10.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
234.000
|
$300.000
|
$186.000
|
$400.000
|
$215.000
|
$399.000
|
$350.000
|
$250.000
|
$359.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
4,887.000
|
$18.000
|
$7.770
|
$8.000
|
$11.000
|
$29.500
|
$12.000
|
$9.000
|
$8.450
|
$17.000
|
|
|
BACKFILL (TY A)
|
STA
|
234.000
|
$170.000
|
$200.000
|
$200.000
|
$300.000
|
$139.000
|
$340.000
|
$150.000
|
$216.000
|
$250.000
|
|
|
BLADING
|
STA
|
255.000
|
$200.000
|
$125.000
|
$125.000
|
$125.000
|
$138.000
|
$150.000
|
$110.000
|
$137.000
|
$150.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
13,126.000
|
$3.320
|
$2.430
|
$2.500
|
$1.400
|
$2.450
|
$1.000
|
$2.000
|
$2.600
|
$3.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
32,949.000
|
$0.150
|
$0.110
|
$0.100
|
$0.170
|
$0.100
|
$0.110
|
$0.120
|
$0.150
|
$0.770
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
65,897.000
|
$0.650
|
$0.630
|
$0.610
|
$0.750
|
$0.630
|
$0.670
|
$0.680
|
$0.680
|
$0.770
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
32,949.000
|
$0.550
|
$0.580
|
$0.570
|
$0.650
|
$0.580
|
$0.620
|
$0.620
|
$0.660
|
$0.250
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
32,949.000
|
$0.500
|
$0.560
|
$0.550
|
$0.650
|
$0.560
|
$0.600
|
$0.620
|
$0.660
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
725.000
|
$10.000
|
$5.000
|
$6.000
|
$1.000
|
$29.000
|
$5.000
|
$22.000
|
$25.000
|
$100.000
|
|
|
CEMENT
|
TON
|
224.000
|
$150.000
|
$161.000
|
$165.000
|
$170.000
|
$163.000
|
$165.000
|
$170.000
|
$187.000
|
$180.000
|
|
|
CEMENT TREAT (EXIST MATL)(DC)(8")
|
SY
|
12,466.000
|
$2.170
|
$4.390
|
$4.500
|
$2.500
|
$4.200
|
$3.000
|
$3.200
|
$4.680
|
$7.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
3,349.000
|
$3.690
|
$4.250
|
$4.250
|
$3.500
|
$4.000
|
$5.000
|
$3.000
|
$4.480
|
$5.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
31,362.000
|
$3.050
|
$2.750
|
$3.000
|
$3.750
|
$2.750
|
$3.250
|
$3.400
|
$3.150
|
$4.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
747.000
|
$106.000
|
$144.000
|
$130.000
|
$140.000
|
$136.000
|
$140.000
|
$140.000
|
$136.600
|
$150.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
351.000
|
$130.000
|
$130.000
|
$130.000
|
$140.000
|
$175.000
|
$160.000
|
$165.000
|
$136.710
|
$180.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,000.000
|
$50.000
|
$69.000
|
$71.500
|
$60.000
|
$67.000
|
$65.000
|
$80.000
|
$75.670
|
$35.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,883.000
|
$3.000
|
$9.000
|
$10.000
|
$3.600
|
$6.000
|
$6.000
|
$7.000
|
$13.160
|
$7.000
|
|
|
CEM STABIL BKFL
|
CY
|
356.000
|
$100.000
|
$210.000
|
$210.000
|
$175.000
|
$165.000
|
$175.000
|
$160.000
|
$225.000
|
$180.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
420.000
|
$85.000
|
$85.000
|
$85.000
|
$100.000
|
$68.000
|
$65.000
|
$105.000
|
$86.000
|
$180.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,164.000
|
$175.000
|
$196.000
|
$196.000
|
$220.000
|
$202.000
|
$208.000
|
$135.000
|
$222.000
|
$220.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
146.200
|
$845.000
|
$875.000
|
$875.000
|
$850.000
|
$850.000
|
$900.000
|
$1,000.000
|
$950.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
60.000
|
$900.000
|
$990.000
|
$990.000
|
$950.000
|
$875.000
|
$950.000
|
$1,200.000
|
$1,150.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
27.200
|
$880.000
|
$990.000
|
$990.000
|
$950.000
|
$925.000
|
$1,000.000
|
$1,500.000
|
$1,400.000
|
$800.000
|
|
|
REINF CONC SLAB
|
SF
|
11,050.000
|
$14.500
|
$18.850
|
$18.850
|
$17.000
|
$19.600
|
$23.000
|
$22.000
|
$18.000
|
$21.000
|
|
|
APPROACH SLAB
|
CY
|
154.200
|
$350.000
|
$605.000
|
$605.000
|
$500.000
|
$490.000
|
$530.000
|
$750.000
|
$525.000
|
$500.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
830.000
|
$135.000
|
$182.000
|
$182.000
|
$140.000
|
$157.000
|
$154.000
|
$155.000
|
$164.000
|
$178.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
456.000
|
$140.000
|
$184.000
|
$184.000
|
$140.000
|
$162.000
|
$154.000
|
$155.000
|
$160.000
|
$174.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,044.000
|
$120.000
|
$107.000
|
$107.000
|
$150.000
|
$144.000
|
$160.000
|
$80.000
|
$120.000
|
$100.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
104.000
|
$430.000
|
$405.000
|
$405.000
|
$500.000
|
$397.000
|
$500.000
|
$510.000
|
$500.000
|
$450.000
|
|
|
RAIL (TY T223)
|
LF
|
838.000
|
$90.000
|
$105.000
|
$105.000
|
$80.000
|
$88.000
|
$90.000
|
$120.000
|
$115.000
|
$110.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
180.000
|
$140.000
|
$78.000
|
$78.000
|
$60.000
|
$91.000
|
$60.000
|
$65.000
|
$70.000
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
342.000
|
$40.000
|
$45.000
|
$40.000
|
$50.000
|
$43.000
|
$40.000
|
$60.000
|
$85.000
|
$45.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$600.000
|
$695.000
|
$650.000
|
$640.000
|
$612.000
|
$575.000
|
$650.000
|
$700.000
|
$750.000
|
|
|
REMOV STR (PIPE)
|
LF
|
100.000
|
$15.000
|
$5.000
|
$4.000
|
$10.000
|
$12.500
|
$15.000
|
$45.000
|
$10.000
|
$50.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
3.000
|
$18,000.000
|
$13,275.000
|
$13,275.000
|
$10,000.000
|
$15,500.000
|
$30,000.000
|
$21,000.000
|
$20,000.000
|
$30,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$506,000.000
|
$285,000.000
|
$452,500.000
|
$500,000.000
|
$300,000.000
|
$330,000.000
|
$480,000.000
|
$495,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$1,700.000
|
$2,000.000
|
$2,500.000
|
$4,100.000
|
$4,000.000
|
$8,100.000
|
$3,500.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,940.000
|
$31.000
|
$27.000
|
$31.000
|
$35.000
|
$32.000
|
$33.000
|
$29.000
|
$27.350
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,940.000
|
$9.500
|
$9.750
|
$9.000
|
$8.000
|
$9.300
|
$3.000
|
$3.000
|
$8.960
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
1,000.000
|
$18.000
|
$7.000
|
$20.000
|
$15.000
|
$22.000
|
$20.000
|
$20.000
|
$20.000
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
120.000
|
$68.000
|
$40.000
|
$75.000
|
$100.000
|
$148.000
|
$75.000
|
$75.000
|
$75.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
20,441.000
|
$2.500
|
$2.400
|
$2.350
|
$2.900
|
$2.400
|
$2.850
|
$2.000
|
$2.470
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
20,441.000
|
$0.750
|
$0.850
|
$0.600
|
$0.650
|
$0.650
|
$0.500
|
$0.500
|
$0.800
|
$0.500
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
120.000
|
$95.000
|
$45.000
|
$110.000
|
$135.000
|
$175.000
|
$125.000
|
$90.000
|
$100.000
|
$20.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,277.000
|
$35.000
|
$24.000
|
$25.000
|
$35.000
|
$30.000
|
$24.000
|
$35.000
|
$25.260
|
$55.000
|
|
|
TURNOUTS (ACP)
|
SY
|
514.000
|
$43.750
|
$32.000
|
$35.000
|
$50.000
|
$40.000
|
$24.000
|
$40.000
|
$33.740
|
$55.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
68.000
|
$90.000
|
$57.000
|
$110.000
|
$125.000
|
$93.000
|
$125.000
|
$165.000
|
$150.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
46,446.000
|
$0.160
|
$0.130
|
$0.260
|
$0.160
|
$0.200
|
$0.200
|
$0.150
|
$0.130
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
23,223.000
|
$0.160
|
$0.130
|
$0.260
|
$0.160
|
$0.200
|
$0.200
|
$0.150
|
$0.130
|
$0.120
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
575.000
|
$26.500
|
$23.500
|
$21.000
|
$24.750
|
$23.000
|
$24.000
|
$22.000
|
$23.750
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,820.000
|
$1,600.000
|
$1,500.000
|
$1,850.000
|
$3,500.000
|
$1,800.000
|
$1,800.000
|
$1,581.560
|
$1,565.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$2.500
|
$2.000
|
$1.000
|
$4.400
|
$3.000
|
$3.000
|
$2.500
|
$2.580
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$200.000
|
$200.000
|
$100.000
|
$250.000
|
$100.000
|
$250.000
|
$200.000
|
$228.030
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,650.000
|
$2,600.000
|
$2,100.000
|
$2,585.000
|
$2,420.000
|
$2,600.000
|
$2,500.000
|
$2,579.060
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$245.000
|
$150.000
|
$100.000
|
$250.000
|
$100.000
|
$200.000
|
$250.000
|
$175.530
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
1.000
|
$23,000.000
|
$27,500.000
|
$25,000.000
|
$28,000.000
|
$29,000.000
|
$28,000.000
|
$26,000.000
|
$27,372.110
|
$25,250.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
614.000
|
$15.000
|
$12.000
|
$18.000
|
$12.000
|
$17.500
|
$15.000
|
$10.000
|
$13.780
|
$15.000
|
|
|
GATE (TY 1)
|
EA
|
3.000
|
$1,213.640
|
$2,200.000
|
$2,000.000
|
$850.000
|
$2,100.000
|
$2,000.000
|
$550.000
|
$864.040
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
34.000
|
$250.000
|
$200.000
|
$125.000
|
$260.000
|
$242.000
|
$270.000
|
$240.000
|
$205.930
|
$250.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$275.000
|
$220.000
|
$140.000
|
$260.000
|
$242.000
|
$325.000
|
$250.000
|
$249.470
|
$280.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$450.000
|
$405.000
|
$325.000
|
$435.000
|
$406.000
|
$470.000
|
$410.000
|
$437.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$590.000
|
$550.000
|
$500.000
|
$565.000
|
$530.000
|
$650.000
|
$540.000
|
$567.670
|
$530.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$725.000
|
$645.000
|
$600.000
|
$710.000
|
$663.000
|
$770.000
|
$670.000
|
$683.440
|
$690.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$690.000
|
$725.000
|
$825.000
|
$773.000
|
$930.000
|
$800.000
|
$746.800
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$750.000
|
$775.000
|
$1,000.000
|
$1,000.000
|
$937.000
|
$1,150.000
|
$950.000
|
$823.870
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
38.000
|
$375.000
|
$250.000
|
$330.000
|
$325.000
|
$304.000
|
$415.000
|
$310.000
|
$254.530
|
$450.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
62.000
|
$90.000
|
$85.000
|
$35.000
|
$95.000
|
$88.000
|
$50.000
|
$90.000
|
$92.300
|
$90.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
2.000
|
$225.000
|
$400.000
|
$325.000
|
$94.000
|
$88.000
|
$590.000
|
$90.000
|
$420.250
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
26.000
|
$22.000
|
$20.000
|
$15.000
|
$19.000
|
$18.000
|
$25.000
|
$20.000
|
$20.100
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$31.000
|
$20.000
|
$20.000
|
$30.000
|
$28.000
|
$35.000
|
$30.000
|
$21.640
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
51,422.000
|
$0.230
|
$0.130
|
$0.150
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
166.000
|
$0.750
|
$0.550
|
$0.500
|
$0.550
|
$0.550
|
$0.550
|
$0.500
|
$0.960
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
294.000
|
$3.000
|
$2.600
|
$2.500
|
$2.750
|
$2.600
|
$3.000
|
$2.500
|
$2.870
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,170.000
|
$0.300
|
$0.130
|
$0.150
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
$0.150
|
$0.120
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
37,045.000
|
$0.240
|
$0.130
|
$0.150
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
1,362.000
|
$0.900
|
$1.000
|
$1.500
|
$1.400
|
$0.750
|
$1.000
|
$0.650
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,458.000
|
$0.700
|
$1.000
|
$1.500
|
$1.300
|
$0.750
|
$1.000
|
$0.650
|
$1.060
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,787.000
|
$0.750
|
$1.000
|
$1.000
|
$1.200
|
$1.900
|
$1.500
|
$0.650
|
$1.080
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
166.000
|
$0.810
|
$1.000
|
$1.000
|
$1.100
|
$1.050
|
$1.100
|
$1.100
|
$1.480
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
294.000
|
$5.500
|
$5.750
|
$5.500
|
$6.050
|
$5.650
|
$6.000
|
$5.800
|
$6.020
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
50,172.000
|
$0.300
|
$0.480
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.480
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,040.000
|
$0.300
|
$0.660
|
$0.600
|
$0.660
|
$0.650
|
$0.660
|
$0.650
|
$0.650
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
37,553.000
|
$0.300
|
$0.480
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.480
|
$0.460
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
1,250.000
|
$0.500
|
$3.100
|
$3.000
|
$3.300
|
$3.000
|
$3.300
|
$3.200
|
$3.210
|
$3.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
150.000
|
$0.550
|
$3.100
|
$3.000
|
$3.300
|
$3.000
|
$3.300
|
$3.200
|
$3.630
|
$3.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
625.000
|
$0.550
|
$3.100
|
$3.000
|
$3.300
|
$3.000
|
$3.300
|
$3.200
|
$3.270
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$31.000
|
$110.000
|
$100.000
|
$110.000
|
$105.000
|
$110.000
|
$105.000
|
$112.210
|
$100.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
66.000
|
$3.200
|
$5.500
|
$5.000
|
$5.500
|
$5.150
|
$5.500
|
$5.500
|
$6.340
|
$5.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
55.000
|
$3.300
|
$5.500
|
$5.000
|
$5.500
|
$5.150
|
$5.500
|
$5.500
|
$6.560
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
622.000
|
$3.100
|
$3.600
|
$3.500
|
$3.850
|
$3.600
|
$4.000
|
$3.700
|
$3.790
|
$3.500
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
17,451.000
|
$81.000
|
$95.700
|
$100.000
|
$97.000
|
$98.000
|
$100.000
|
$98.000
|
$105.000
|
$120.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
6,160.000
|
$88.000
|
$108.000
|
$110.000
|
$105.000
|
$109.000
|
$110.000
|
$105.000
|
$116.000
|
$110.000
|
|
|
TACK COAT
|
GAL
|
7,467.000
|
$2.000
|
$3.000
|
$1.000
|
$3.000
|
$2.800
|
$3.000
|
$3.000
|
$1.060
|
$8.000
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
200.000
|
$35.000
|
$45.000
|
$47.000
|
$42.000
|
$48.000
|
$55.000
|
$40.000
|
$42.360
|
$50.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
200.000
|
$9.000
|
$10.000
|
$15.000
|
$12.000
|
$15.000
|
$20.000
|
$20.000
|
$12.960
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
56.000
|
$125.000
|
$75.000
|
$90.000
|
$100.000
|
$185.000
|
$150.000
|
$200.000
|
$125.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,500.000
|
$13,000.000
|
$18,500.000
|
$8,000.000
|
$7,400.000
|
$12,000.000
|
$12,000.000
|
$8,500.000
|
$10,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
174.000
|
$3.500
|
$13.000
|
$12.500
|
$13.750
|
$13.000
|
$13.000
|
$13.000
|
$13.540
|
$12.000
|
|
|
TMA (STATIONARY)
|
DAY
|
235.000
|
$160.000
|
$75.000
|
$150.000
|
$125.000
|
$180.000
|
$200.000
|
$200.000
|
$135.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$90.000
|
$125.000
|
$1.000
|
$300.000
|
$0.010
|
$200.000
|
$300.000
|
$150.000
|
$500.000
|
|
Totals: |
$5,329,289.880
|
$5,533,705.840
|
$5,910,787.640
|
$5,917,516.180
|
$6,031,617.050
|
$6,099,736.920
|
$6,140,788.640
|
$6,298,830.200
|
$6,898,814.140
|