PREPARING ROW
|
STA
|
59.000
|
$1,800.000
|
$2,100.000
|
$2,000.000
|
$2,760.000
|
$650.000
|
$775.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
235.000
|
$14.000
|
$20.000
|
$15.000
|
$26.000
|
$22.000
|
$15.000
|
|
|
|
REMOVING CONC (FLUME)
|
SY
|
27.000
|
$12.000
|
$20.000
|
$15.000
|
$26.000
|
$24.000
|
$15.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
222.500
|
$250.000
|
$375.000
|
$400.000
|
$280.000
|
$215.000
|
$530.000
|
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
3,000.000
|
$14.000
|
$13.000
|
$12.000
|
$20.000
|
$11.000
|
$15.000
|
|
|
|
BACKFILL (TY A)
|
STA
|
222.500
|
$200.000
|
$350.000
|
$215.000
|
$230.000
|
$270.000
|
$350.000
|
|
|
|
BLADING
|
STA
|
222.500
|
$140.000
|
$100.000
|
$150.000
|
$50.000
|
$175.000
|
$150.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
40,974.000
|
$1.000
|
$1.320
|
$1.250
|
$0.500
|
$1.850
|
$1.000
|
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
80,530.000
|
$0.750
|
$0.700
|
$0.800
|
$0.700
|
$0.860
|
$0.750
|
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
40,265.000
|
$0.650
|
$0.640
|
$0.750
|
$0.700
|
$0.760
|
$0.650
|
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
40,265.000
|
$0.650
|
$0.590
|
$0.720
|
$0.700
|
$0.760
|
$0.600
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,772.000
|
$8.000
|
$8.000
|
$7.000
|
$1.000
|
$1.000
|
$5.000
|
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
27,037.000
|
$3.300
|
$2.700
|
$3.500
|
$3.000
|
$4.000
|
$2.900
|
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
644.000
|
$120.000
|
$160.000
|
$105.000
|
$120.000
|
$155.000
|
$123.000
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,500.000
|
$43.000
|
$47.500
|
$50.000
|
$58.810
|
$65.000
|
$48.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
978.000
|
$1.200
|
$6.700
|
$15.000
|
$6.000
|
$5.500
|
$12.000
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
89.000
|
$1.250
|
$10.000
|
$50.000
|
$6.000
|
$12.000
|
$30.000
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
26.000
|
$80.000
|
$152.500
|
$75.000
|
$105.000
|
$115.000
|
$125.000
|
|
|
|
FLOWABLE BACKFILL
|
CY
|
94.000
|
$150.000
|
$150.000
|
$250.000
|
$160.000
|
$210.000
|
$145.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
58.000
|
$4.000
|
$10.000
|
$5.000
|
$18.000
|
$15.000
|
$1.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
240.000
|
$30.000
|
$70.000
|
$25.000
|
$29.000
|
$65.000
|
$65.000
|
|
|
|
CL C CONC (COLLAR)
|
EA
|
36.000
|
$1,000.000
|
$900.000
|
$600.000
|
$530.000
|
$950.000
|
$650.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
205.000
|
$145.000
|
$135.000
|
$150.000
|
$205.000
|
$160.000
|
$155.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
62.000
|
$55.000
|
$40.000
|
$0.000
|
$50.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
66.000
|
$60.000
|
$55.000
|
$0.000
|
$79.000
|
$0.000
|
$0.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
44.000
|
$91.000
|
$82.000
|
$75.000
|
$120.000
|
$75.000
|
$146.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
28.000
|
$105.000
|
$96.000
|
$115.000
|
$165.000
|
$100.000
|
$160.000
|
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
58.000
|
$290.000
|
$300.000
|
$350.000
|
$430.000
|
$280.000
|
$262.000
|
|
|
|
INLET (COMPL)(PSL)(SL)(3FTX3FT)
|
EA
|
2.000
|
$3,000.000
|
$4,000.000
|
$5,000.000
|
$3,200.000
|
$2,200.000
|
$2,500.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$3,500.000
|
$3,700.000
|
$2,500.000
|
$4,900.000
|
$3,200.000
|
$4,000.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
3.000
|
$5,500.000
|
$5,500.000
|
$3,000.000
|
$5,800.000
|
$4,500.000
|
$4,500.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$5,800.000
|
$6,300.000
|
$4,000.000
|
$7,600.000
|
$5,400.000
|
$5,500.000
|
|
|
|
HEADWALL (CH - FW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$10,500.000
|
$9,000.000
|
$9,000.000
|
$15,000.000
|
$9,400.000
|
$12,500.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$6,500.000
|
$6,900.000
|
$6,000.000
|
$6,400.000
|
$7,000.000
|
$7,500.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$13,000.000
|
$12,000.000
|
$13,000.000
|
$17,000.000
|
$10,500.000
|
$15,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$4,800.000
|
$6,400.000
|
$4,000.000
|
$5,800.000
|
$4,500.000
|
$5,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
15.000
|
$900.000
|
$525.000
|
$480.000
|
$640.000
|
$545.000
|
$700.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
68.000
|
$750.000
|
$675.000
|
$550.000
|
$720.000
|
$600.000
|
$725.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$1,100.000
|
$925.000
|
$700.000
|
$950.000
|
$745.000
|
$825.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,100.000
|
$1,000.000
|
$900.000
|
$1,100.000
|
$940.000
|
$1,000.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$1,550.000
|
$1,200.000
|
$1,800.000
|
$1,150.000
|
$1,200.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,400.000
|
$2,500.000
|
$1,800.000
|
$2,400.000
|
$1,900.000
|
$2,500.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$2,200.000
|
$800.000
|
$1,000.000
|
$580.000
|
$1,300.000
|
$3,000.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
58.000
|
$15.000
|
$10.000
|
$15.000
|
$32.000
|
$22.000
|
$42.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
39.000
|
$350.000
|
$250.000
|
$400.000
|
$320.000
|
$200.000
|
$650.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$307,000.000
|
$225,000.000
|
$200,000.000
|
$330,000.000
|
$350,000.000
|
$382,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$2,000.000
|
$4,000.000
|
$5,440.000
|
$3,000.000
|
$1,700.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,845.000
|
$29.000
|
$27.000
|
$35.000
|
$36.000
|
$35.000
|
$35.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,845.000
|
$10.000
|
$8.000
|
$13.000
|
$10.000
|
$8.800
|
$13.000
|
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
150.000
|
$14.000
|
$25.000
|
$30.000
|
$20.000
|
$26.000
|
$13.000
|
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$85.000
|
$75.000
|
$125.000
|
$66.000
|
$195.000
|
$50.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,175.000
|
$2.350
|
$2.650
|
$2.800
|
$3.000
|
$3.150
|
$2.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,175.000
|
$0.750
|
$0.500
|
$0.900
|
$0.700
|
$0.800
|
$1.000
|
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$105.000
|
$100.000
|
$150.000
|
$90.000
|
$195.000
|
$85.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
765.000
|
$32.000
|
$39.500
|
$40.000
|
$40.000
|
$38.000
|
$46.500
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,054.000
|
$32.000
|
$34.500
|
$28.000
|
$30.000
|
$31.000
|
$41.500
|
|
|
|
TURNOUTS (ACP)
|
SY
|
243.000
|
$37.000
|
$34.500
|
$40.000
|
$32.000
|
$36.000
|
$46.500
|
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
235.000
|
$85.000
|
$110.000
|
$85.000
|
$120.000
|
$100.000
|
$120.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
39,566.000
|
$0.140
|
$0.160
|
$0.250
|
$0.150
|
$0.180
|
$0.250
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
19,783.000
|
$0.160
|
$0.160
|
$0.250
|
$0.150
|
$0.180
|
$0.340
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
16.000
|
$250.000
|
$280.000
|
$240.000
|
$260.000
|
$275.000
|
$320.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$305.000
|
$315.000
|
$300.000
|
$260.000
|
$275.000
|
$350.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$390.000
|
$445.000
|
$400.000
|
$420.000
|
$435.000
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$580.000
|
$600.000
|
$500.000
|
$525.000
|
$660.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$600.000
|
$600.000
|
$600.000
|
$520.000
|
$545.000
|
$680.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$770.000
|
$700.000
|
$680.000
|
$710.000
|
$875.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$680.000
|
$1,000.000
|
$1,000.000
|
$930.000
|
$975.000
|
$1,100.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
30.000
|
$360.000
|
$385.000
|
$470.000
|
$340.000
|
$360.000
|
$440.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$87.000
|
$76.000
|
$100.000
|
$100.000
|
$105.000
|
$85.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
50.000
|
$70.000
|
$53.000
|
$50.000
|
$50.000
|
$50.000
|
$60.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
75.000
|
$2.500
|
$5.000
|
$6.000
|
$8.500
|
$5.500
|
$5.500
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
980.000
|
$0.150
|
$2.000
|
$2.200
|
$1.050
|
$2.200
|
$2.250
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
208.000
|
$0.900
|
$1.400
|
$1.750
|
$0.100
|
$1.400
|
$1.100
|
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,622.000
|
$0.500
|
$1.400
|
$1.750
|
$0.100
|
$1.400
|
$1.100
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,276.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$1.200
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
214.000
|
$6.000
|
$7.000
|
$7.700
|
$11.000
|
$7.700
|
$7.500
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
44,600.000
|
$0.350
|
$0.440
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
460.000
|
$0.350
|
$2.000
|
$2.200
|
$0.500
|
$2.200
|
$2.250
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
42,760.000
|
$0.350
|
$0.440
|
$0.480
|
$0.450
|
$0.480
|
$0.500
|
|
|
|
REFL PAV MRKR TY I-A
|
EA
|
128.000
|
$3.500
|
$3.500
|
$4.000
|
$5.500
|
$3.850
|
$4.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
558.000
|
$3.200
|
$3.500
|
$4.000
|
$5.500
|
$3.850
|
$4.000
|
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
8,705.000
|
$94.000
|
$94.500
|
$100.000
|
$108.000
|
$115.000
|
$114.500
|
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
7,081.000
|
$90.000
|
$105.000
|
$112.000
|
$117.000
|
$110.000
|
$123.500
|
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
240.000
|
$60.000
|
$37.000
|
$0.000
|
$53.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
852.000
|
$55.000
|
$33.000
|
$0.000
|
$36.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$70.000
|
$90.000
|
$200.000
|
$250.000
|
$100.000
|
$85.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
177.000
|
$185.000
|
$150.000
|
$200.000
|
$100.000
|
$125.000
|
$130.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
13.000
|
$150.000
|
$0.010
|
$200.000
|
$100.000
|
$22.000
|
$45.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
914.000
|
$55.000
|
$0.000
|
$37.000
|
$0.000
|
$40.000
|
$54.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
306.000
|
$60.000
|
$0.000
|
$50.000
|
$0.000
|
$55.000
|
$65.000
|
|
Totals: |
$3,444,693.270
|
$3,457,804.750
|
$3,569,955.900
|
$3,812,659.350
|
$3,813,129.970
|
$3,998,187.770
|