PREPARING ROW
|
STA
|
5.600
|
$15,000.000
|
$2,737.500
|
$25,000.000
|
$65,000.000
|
$10,000.000
|
$16,000.000
|
$20,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
190.000
|
$36.000
|
$82.130
|
$5.000
|
$86.610
|
$35.000
|
$185.000
|
$40.000
|
|
|
RMV (8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
830.000
|
$3.200
|
$20.390
|
$5.000
|
$9.260
|
$30.000
|
$25.000
|
$40.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
26.000
|
$10.700
|
$35.150
|
$100.000
|
$9.670
|
$175.000
|
$150.000
|
$100.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
95.000
|
$21.300
|
$67.160
|
$100.000
|
$44.710
|
$175.000
|
$75.000
|
$100.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
AC
|
1.118
|
$1,000.000
|
$1,622.790
|
$2,500.000
|
$785.500
|
$2,972.000
|
$3,500.000
|
$10,000.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
AC
|
1.118
|
$1,000.000
|
$1,622.790
|
$2,250.000
|
$785.500
|
$2,357.000
|
$2,500.000
|
$8,000.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
58.000
|
$40.000
|
$219.000
|
$20.000
|
$48.340
|
$55.000
|
$30.000
|
$1.000
|
|
|
FL BS (RDWY DEL) (TY A GR 3) (IN VEH)
|
CY
|
20.000
|
$60.000
|
$54.750
|
$500.000
|
$142.470
|
$600.000
|
$350.000
|
$150.000
|
|
|
REWORK BS MTL (TY C)(6")(DENS CONT)
|
SY
|
877.000
|
$4.000
|
$16.430
|
$40.000
|
$9.670
|
$30.000
|
$25.000
|
$60.000
|
|
|
CEMENT
|
TON
|
2.000
|
$190.000
|
$328.500
|
$500.000
|
$362.540
|
$500.000
|
$2,500.000
|
$3,000.000
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
160.000
|
$2.000
|
$4.380
|
$50.000
|
$52.870
|
$75.000
|
$50.000
|
$300.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
176.000
|
$4.200
|
$54.750
|
$50.000
|
$72.510
|
$20.000
|
$150.000
|
$50.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
342.000
|
$280.000
|
$802.030
|
$475.000
|
$350.450
|
$250.000
|
$450.000
|
$400.000
|
|
|
TACK COAT
|
GAL
|
90.000
|
$20.000
|
$121.380
|
$25.000
|
$36.250
|
$10.000
|
$30.000
|
$20.000
|
|
|
PLANE ASPH CONC PAV(3")
|
SY
|
534.000
|
$5.500
|
$8.760
|
$35.000
|
$36.250
|
$25.000
|
$15.000
|
$50.000
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
130.000
|
$66.000
|
$164.250
|
$200.000
|
$300.120
|
$325.000
|
$200.000
|
$600.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
50.100
|
$400.000
|
$558.450
|
$300.000
|
$221.550
|
$500.000
|
$350.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
146.000
|
$80.000
|
$54.750
|
$10.000
|
$80.560
|
$260.000
|
$275.000
|
$800.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
480.000
|
$400.000
|
$366.830
|
$450.000
|
$655.760
|
$380.000
|
$525.000
|
$400.000
|
|
|
CL C CONC (ABUT)
|
CY
|
35.600
|
$2,000.000
|
$1,714.500
|
$2,500.000
|
$2,574.120
|
$2,000.000
|
$3,000.000
|
$4,000.000
|
|
|
CL C CONC (CAP)
|
CY
|
30.000
|
$1,260.000
|
$1,940.990
|
$2,500.000
|
$2,125.350
|
$2,000.000
|
$2,700.000
|
$4,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
29.200
|
$2,000.000
|
$2,030.260
|
$2,500.000
|
$2,155.680
|
$2,000.000
|
$2,800.000
|
$4,000.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
131.800
|
$1,170.000
|
$1,274.550
|
$2,500.000
|
$832.700
|
$2,000.000
|
$1,050.000
|
$4,000.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
5,777.000
|
$35.000
|
$32.610
|
$30.000
|
$36.460
|
$40.000
|
$48.000
|
$55.000
|
|
|
APPROACH SLAB
|
CY
|
79.000
|
$1,500.000
|
$1,038.840
|
$1,000.000
|
$1,084.080
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
PRESTR CONC BOX BEAM (4B20)
|
LF
|
494.000
|
$320.000
|
$274.850
|
$350.000
|
$337.460
|
$390.000
|
$480.000
|
$600.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
741.000
|
$340.000
|
$274.850
|
$350.000
|
$326.480
|
$390.000
|
$475.000
|
$600.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
972.000
|
$35.150
|
$16.430
|
$10.000
|
$50.790
|
$18.000
|
$18.000
|
$20.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
160.000
|
$28.500
|
$33.510
|
$10.000
|
$54.380
|
$20.000
|
$35.000
|
$8.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
30.000
|
$575.000
|
$254.040
|
$200.000
|
$253.780
|
$200.000
|
$450.000
|
$350.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
32.000
|
$400.000
|
$389.820
|
$400.000
|
$458.010
|
$200.000
|
$575.000
|
$500.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
72.000
|
$270.000
|
$313.170
|
$200.000
|
$355.290
|
$200.000
|
$350.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
94.000
|
$600.000
|
$684.380
|
$1,000.000
|
$705.040
|
$596.000
|
$850.000
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,648.000
|
$250.000
|
$383.250
|
$200.000
|
$167.980
|
$500.000
|
$300.000
|
$225.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
169.000
|
$69.000
|
$71.180
|
$150.000
|
$119.850
|
$75.000
|
$175.000
|
$350.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (3")
|
SY
|
623.000
|
$50.000
|
$557.360
|
$700.000
|
$615.110
|
$550.000
|
$600.000
|
$250.000
|
|
|
RAIL (TY SSTR)
|
LF
|
282.000
|
$49.800
|
$131.400
|
$200.000
|
$167.060
|
$115.000
|
$160.000
|
$200.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
266.000
|
$225.000
|
$306.600
|
$200.000
|
$326.290
|
$247.120
|
$400.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
89.900
|
$150.000
|
$258.420
|
$250.000
|
$240.480
|
$500.000
|
$350.000
|
$250.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$38,815.000
|
$120,450.000
|
$200,000.000
|
$141,088.290
|
$240,000.000
|
$200,000.000
|
$800,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$140,063.620
|
$440,000.000
|
$400,000.000
|
$400,000.000
|
$467,000.000
|
$480,000.000
|
$550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$15,000.000
|
$8,760.000
|
$4,000.000
|
$5,159.070
|
$10,000.000
|
$25,000.000
|
$2,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$9,335.000
|
$20,865.250
|
$20,000.000
|
$27,458.740
|
$18,500.000
|
$15,000.000
|
$45,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
56.000
|
$160.000
|
$328.500
|
$150.000
|
$483.390
|
$950.000
|
$350.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$405.000
|
$657.000
|
$400.000
|
$120.850
|
$950.000
|
$500.000
|
$300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$32.400
|
$53.110
|
$40.000
|
$60.420
|
$50.000
|
$35.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$10.400
|
$18.620
|
$10.000
|
$24.170
|
$15.000
|
$10.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
448.000
|
$24.500
|
$38.330
|
$40.000
|
$90.630
|
$45.000
|
$40.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
448.000
|
$7.300
|
$13.140
|
$10.000
|
$36.250
|
$15.000
|
$15.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,525.000
|
$2.800
|
$6.570
|
$5.000
|
$6.040
|
$3.000
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,525.000
|
$0.700
|
$2.190
|
$1.000
|
$2.420
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
110.000
|
$65.800
|
$547.500
|
$500.000
|
$422.960
|
$400.000
|
$450.000
|
$600.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,170.000
|
$100.000
|
$43.800
|
$115.000
|
$81.570
|
$100.000
|
$70.000
|
$90.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,170.000
|
$15.000
|
$32.850
|
$15.000
|
$18.130
|
$10.000
|
$15.000
|
$40.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,170.000
|
$15.000
|
$43.800
|
$15.000
|
$36.250
|
$10.000
|
$35.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,250.000
|
$40.100
|
$32.850
|
$35.000
|
$38.370
|
$30.000
|
$32.000
|
$50.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,820.000
|
$2,682.750
|
$2,500.000
|
$2,749.260
|
$2,450.000
|
$3,000.000
|
$3,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,700.000
|
$1,861.500
|
$2,000.000
|
$1,752.270
|
$1,700.000
|
$1,500.000
|
$3,000.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$1,145.000
|
$1,012.880
|
$1,000.000
|
$1,450.160
|
$925.000
|
$1,300.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,500.000
|
$1.700
|
$3.290
|
$5.000
|
$2.420
|
$3.000
|
$2.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$235.000
|
$328.500
|
$100.000
|
$241.690
|
$300.000
|
$200.000
|
$500.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$545.000
|
$328.500
|
$100.000
|
$241.690
|
$300.000
|
$200.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,440.000
|
$3,230.250
|
$4,000.000
|
$3,957.720
|
$2,950.000
|
$3,500.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$328.500
|
$100.000
|
$241.690
|
$300.000
|
$250.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$3,285.000
|
$2,500.000
|
$3,021.160
|
$3,000.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$1,368.750
|
$1,250.000
|
$1,812.700
|
$3,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,200.000
|
$11,497.500
|
$12,500.000
|
$9,063.490
|
$10,000.000
|
$8,000.000
|
$15,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
3.000
|
$66.000
|
$32.850
|
$25.000
|
$22.960
|
$30.000
|
$20.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$23.400
|
$32.850
|
$25.000
|
$22.960
|
$30.000
|
$20.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
|
EA
|
10.000
|
$45.000
|
$42.710
|
$30.000
|
$22.960
|
$39.000
|
$20.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$36.600
|
$42.710
|
$40.000
|
$36.250
|
$39.000
|
$30.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
3.000
|
$73.000
|
$21.900
|
$30.000
|
$22.960
|
$20.000
|
$20.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
|
EA
|
4.000
|
$49.000
|
$42.710
|
$30.000
|
$22.960
|
$39.000
|
$20.000
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
12.000
|
$39.100
|
$56.260
|
$10.000
|
$138.970
|
$10.000
|
$15.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
580.000
|
$0.250
|
$3.010
|
$3.000
|
$2.420
|
$2.750
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
840.000
|
$0.250
|
$3.010
|
$3.000
|
$2.420
|
$2.750
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,510.000
|
$0.850
|
$3.290
|
$3.000
|
$2.720
|
$3.000
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,985.000
|
$2.250
|
$3.290
|
$3.000
|
$2.720
|
$3.000
|
$3.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,435.000
|
$0.850
|
$3.290
|
$3.000
|
$2.720
|
$3.000
|
$3.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
2,860.000
|
$2.250
|
$3.290
|
$3.000
|
$2.720
|
$3.000
|
$3.000
|
$3.000
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
180.000
|
$1.000
|
$5.750
|
$5.500
|
$2.420
|
$5.250
|
$6.000
|
$6.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
700.000
|
$1.000
|
$5.750
|
$5.500
|
$2.420
|
$5.250
|
$6.000
|
$6.000
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
700.000
|
$1.000
|
$5.750
|
$5.500
|
$2.420
|
$5.250
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
11.000
|
$3.250
|
$27.380
|
$50.000
|
$12.080
|
$25.000
|
$26.000
|
$30.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
2,330.000
|
$0.300
|
$3.830
|
$4.000
|
$1.510
|
$3.500
|
$4.000
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
370.000
|
$0.050
|
$3.560
|
$4.000
|
$1.210
|
$3.250
|
$4.000
|
$4.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
72.000
|
$98.000
|
$82.130
|
$200.000
|
$51.960
|
$40.000
|
$100.000
|
$300.000
|
|
Totals: |
$2,941,335.970
|
$4,054,308.603
|
$4,177,530.500
|
$4,192,511.423
|
$4,674,672.242
|
$4,869,966.000
|
$5,974,473.000
|