REMOVING CONC (RIPRAP)
|
SY
|
19.000
|
$25.000
|
$35.000
|
$39.500
|
$36.750
|
$39.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,405.000
|
$6.430
|
$45.000
|
$46.500
|
$75.000
|
$53.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
292.000
|
$34.110
|
$45.000
|
$44.500
|
$50.000
|
$73.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,137.000
|
$31.190
|
$43.000
|
$46.500
|
$20.000
|
$53.000
|
|
|
BLADING
|
STA
|
1.000
|
$300.000
|
$1,650.000
|
$405.000
|
$750.000
|
$1,200.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
29,222.000
|
$0.120
|
$0.140
|
$0.140
|
$0.150
|
$0.140
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
29,222.000
|
$0.140
|
$0.140
|
$0.160
|
$0.170
|
$0.140
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
58,431.000
|
$0.140
|
$0.180
|
$0.110
|
$0.120
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
968.000
|
$29.880
|
$45.000
|
$32.500
|
$5.000
|
$55.000
|
|
|
CEMENT
|
TON
|
434.300
|
$237.300
|
$235.000
|
$250.000
|
$265.000
|
$230.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
40,164.000
|
$3.060
|
$3.550
|
$5.150
|
$7.000
|
$6.750
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,038.000
|
$5.170
|
$6.000
|
$5.500
|
$15.000
|
$3.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
13,693.000
|
$4.450
|
$3.000
|
$3.850
|
$5.000
|
$2.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,390.000
|
$58.180
|
$67.000
|
$68.500
|
$90.000
|
$64.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,397.000
|
$2.940
|
$15.500
|
$8.600
|
$12.000
|
$8.900
|
|
|
CEM STABIL BKFL
|
CY
|
154.000
|
$187.770
|
$275.000
|
$275.000
|
$288.750
|
$310.000
|
|
|
CUT & RESTORING PAV
|
SY
|
162.000
|
$79.260
|
$147.520
|
$120.000
|
$150.000
|
$28.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
88.000
|
$90.000
|
$10.000
|
$10.000
|
$10.500
|
$11.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
174.000
|
$100.000
|
$60.000
|
$100.000
|
$84.000
|
$89.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
20.000
|
$580.600
|
$850.000
|
$625.000
|
$656.250
|
$690.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
18.000
|
$200.000
|
$550.000
|
$300.000
|
$315.000
|
$330.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
92.000
|
$650.660
|
$675.000
|
$625.000
|
$656.250
|
$690.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
422.000
|
$82.040
|
$65.000
|
$65.000
|
$68.250
|
$72.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
122.000
|
$98.970
|
$80.000
|
$80.000
|
$84.000
|
$89.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
292.000
|
$100.000
|
$120.000
|
$120.000
|
$126.000
|
$130.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
294.000
|
$120.000
|
$160.000
|
$160.000
|
$168.000
|
$180.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
108.000
|
$158.300
|
$200.000
|
$200.000
|
$210.000
|
$220.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$9,500.000
|
$9,500.000
|
$10,000.000
|
$10,500.000
|
$11,100.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$17,000.000
|
$9,900.000
|
$12,000.000
|
$12,600.000
|
$13,300.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$20,000.000
|
$17,500.000
|
$20,500.000
|
$21,525.000
|
$22,800.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
36.000
|
$1,260.000
|
$1,400.000
|
$1,400.000
|
$1,470.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$2,842.690
|
$1,500.000
|
$1,600.000
|
$1,627.500
|
$1,700.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$1,350.000
|
$1,400.000
|
$1,470.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
5.000
|
$2,500.000
|
$1,500.000
|
$1,500.000
|
$1,575.000
|
$1,700.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$4,800.000
|
$2,000.000
|
$2,100.000
|
$2,205.000
|
$2,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$5,200.000
|
$3,000.000
|
$3,300.000
|
$3,465.000
|
$3,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$6,170.000
|
$3,800.000
|
$4,000.000
|
$4,200.000
|
$4,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$3,991.780
|
$2,000.000
|
$2,000.000
|
$2,100.000
|
$2,200.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$421.890
|
$300.000
|
$300.000
|
$315.000
|
$330.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$806.690
|
$800.000
|
$1,200.000
|
$1,260.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,244.000
|
$14.770
|
$10.000
|
$15.000
|
$15.750
|
$17.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
50.000
|
$4.120
|
$116.000
|
$25.000
|
$50.000
|
$36.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$332,084.840
|
$355,000.000
|
$440,000.000
|
$460,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,000.000
|
$17,000.000
|
$23,000.000
|
$10,000.000
|
$30,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
660.000
|
$32.410
|
$38.000
|
$27.000
|
$28.350
|
$42.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
660.000
|
$10.720
|
$10.000
|
$15.000
|
$23.100
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,400.000
|
$3.440
|
$4.000
|
$2.950
|
$3.100
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,400.000
|
$1.080
|
$1.000
|
$0.900
|
$0.950
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,880.000
|
$4.720
|
$6.000
|
$3.700
|
$3.890
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,880.000
|
$1.010
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
290.000
|
$50.060
|
$36.000
|
$29.500
|
$95.000
|
$26.000
|
|
|
TURNOUTS (ACP)
|
SY
|
589.000
|
$50.680
|
$141.000
|
$29.500
|
$95.000
|
$30.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,980.000
|
$19.000
|
$41.000
|
$14.000
|
$20.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
65,728.000
|
$0.210
|
$0.110
|
$0.160
|
$0.190
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
32,864.000
|
$0.230
|
$0.110
|
$0.210
|
$0.250
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
725.000
|
$28.950
|
$26.730
|
$22.000
|
$22.840
|
$33.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$91.350
|
$63.590
|
$81.000
|
$85.050
|
$100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,547.750
|
$3,290.000
|
$2,950.000
|
$3,071.250
|
$3,600.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
50.000
|
$25.440
|
$30.000
|
$20.000
|
$65.000
|
$90.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
17.000
|
$450.000
|
$530.000
|
$530.000
|
$556.500
|
$590.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$341.750
|
$260.000
|
$260.000
|
$273.000
|
$290.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$837.420
|
$515.000
|
$515.000
|
$540.750
|
$570.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$766.010
|
$590.000
|
$590.000
|
$619.500
|
$660.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$1,260.000
|
$780.000
|
$780.000
|
$819.000
|
$870.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$968.560
|
$825.000
|
$825.000
|
$866.250
|
$920.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,520.000
|
$1,100.000
|
$1,100.000
|
$1,155.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
12.000
|
$559.280
|
$575.000
|
$575.000
|
$603.750
|
$640.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
55.000
|
$95.000
|
$100.000
|
$100.000
|
$105.000
|
$110.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,051.000
|
$0.880
|
$1.000
|
$1.350
|
$1.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
65,980.000
|
$0.450
|
$0.490
|
$0.440
|
$0.460
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,730.000
|
$0.440
|
$0.490
|
$0.450
|
$0.470
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
37,980.000
|
$0.460
|
$0.490
|
$0.440
|
$0.460
|
$0.550
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
764.000
|
$4.470
|
$5.000
|
$3.750
|
$3.940
|
$5.600
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
8,039.000
|
$100.000
|
$98.000
|
$110.000
|
$115.000
|
$106.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
11,256.000
|
$115.000
|
$114.000
|
$105.000
|
$125.000
|
$112.000
|
|
|
BONDING COURSE
|
GAL
|
6,136.000
|
$4.510
|
$3.450
|
$4.750
|
$6.000
|
$2.500
|
|
|
TMA (STATIONARY)
|
DAY
|
139.000
|
$175.680
|
$300.000
|
$250.000
|
$650.000
|
$320.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$200.000
|
$880.000
|
$1,000.000
|
$900.000
|
$1,000.000
|
|
Totals: |
$4,196,246.400
|
$4,557,308.850
|
$4,595,817.530
|
$5,092,983.390
|
$5,096,041.460
|