|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
8.000
|
$1,500.000
|
$1,175.000
|
$1,800.000
|
$2,000.000
|
$630.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
266.000
|
$20.000
|
$35.000
|
$35.000
|
$27.000
|
$21.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,232.000
|
$15.000
|
$14.500
|
$35.000
|
$36.000
|
$36.500
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
75.000
|
$40.000
|
$100.000
|
$80.000
|
$75.000
|
$70.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,009.000
|
$25.000
|
$47.300
|
$58.000
|
$70.000
|
$27.750
|
|
|
BLOCK SODDING
|
SY
|
320.000
|
$5.500
|
$8.400
|
$14.760
|
$8.500
|
$16.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
45,440.000
|
$0.100
|
$0.130
|
$0.250
|
$0.120
|
$0.250
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
45,440.000
|
$0.100
|
$0.150
|
$0.250
|
$0.140
|
$0.250
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
90,871.000
|
$0.150
|
$0.120
|
$0.250
|
$0.110
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
763.400
|
$30.000
|
$19.000
|
$47.000
|
$15.000
|
$55.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,212.000
|
$1.250
|
$1.750
|
$1.710
|
$1.800
|
$1.900
|
|
|
CEMENT
|
TON
|
320.000
|
$160.000
|
$233.000
|
$265.000
|
$190.000
|
$205.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
29,625.000
|
$5.500
|
$2.300
|
$3.500
|
$4.500
|
$4.600
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,406.000
|
$4.250
|
$5.250
|
$7.000
|
$7.000
|
$4.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
6,037.000
|
$3.500
|
$5.000
|
$3.500
|
$5.000
|
$4.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
5,079.000
|
$50.000
|
$58.000
|
$61.000
|
$68.000
|
$62.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
2,163.000
|
$3.000
|
$3.600
|
$8.000
|
$6.000
|
$5.600
|
|
|
TEMPORARY SPL SHORING
|
SF
|
40.000
|
$25.000
|
$89.250
|
$85.000
|
$90.000
|
$99.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
35.000
|
$200.000
|
$126.000
|
$200.000
|
$125.000
|
$300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.200
|
$550.000
|
$630.000
|
$775.000
|
$640.000
|
$680.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
88.000
|
$600.000
|
$735.000
|
$672.000
|
$650.000
|
$770.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
367.000
|
$90.000
|
$78.750
|
$80.000
|
$79.000
|
$100.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
30.000
|
$195.000
|
$105.000
|
$93.000
|
$110.000
|
$120.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
16.000
|
$450.000
|
$714.000
|
$750.000
|
$715.000
|
$530.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
31.500
|
$500.000
|
$745.500
|
$900.000
|
$750.000
|
$520.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
64.500
|
$650.000
|
$777.000
|
$980.000
|
$780.000
|
$510.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
32.000
|
$800.000
|
$1,155.000
|
$1,400.000
|
$1,200.000
|
$710.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
16.750
|
$750.000
|
$924.000
|
$1,220.000
|
$930.000
|
$700.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
6.000
|
$6,000.000
|
$6,300.000
|
$4,000.000
|
$6,400.000
|
$8,800.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$7,000.000
|
$9,870.000
|
$6,000.000
|
$9,900.000
|
$16,400.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$11,500.000
|
$19,950.000
|
$13,000.000
|
$20,000.000
|
$25,400.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
24.000
|
$1,250.000
|
$1,050.000
|
$975.000
|
$1,100.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$1,470.000
|
$1,375.000
|
$1,500.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$1,365.000
|
$1,325.000
|
$1,400.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$3,675.000
|
$2,650.000
|
$3,700.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$4,500.000
|
$5,250.000
|
$2,000.000
|
$5,300.000
|
$3,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,500.000
|
$525.000
|
$825.000
|
$530.000
|
$1,100.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,000.000
|
$525.000
|
$800.000
|
$530.000
|
$3,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
395.000
|
$25.000
|
$15.750
|
$12.000
|
$16.000
|
$31.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$308,558.000
|
$230,000.000
|
$220,000.000
|
$400,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$7,500.000
|
$4,200.000
|
$20,000.000
|
$10,200.000
|
$23,000.000
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
174.000
|
$20.000
|
$35.000
|
$75.000
|
$25.000
|
$56.000
|
|
|
TEMP PAVED FLUME (REMOVE)
|
SY
|
174.000
|
$10.000
|
$15.000
|
$25.000
|
$10.000
|
$31.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
810.000
|
$3.000
|
$4.200
|
$5.910
|
$4.100
|
$6.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
810.000
|
$1.000
|
$1.050
|
$1.500
|
$1.000
|
$1.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,275.000
|
$3.500
|
$3.000
|
$4.880
|
$3.000
|
$5.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,275.000
|
$1.000
|
$0.840
|
$0.750
|
$0.900
|
$0.850
|
|
|
DRIVEWAYS (CONC)
|
SY
|
253.000
|
$90.000
|
$115.500
|
$108.000
|
$116.000
|
$140.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,300.000
|
$45.000
|
$24.500
|
$50.000
|
$39.000
|
$42.250
|
|
|
TURNOUTS (ACP)
|
SY
|
374.000
|
$70.000
|
$18.750
|
$75.000
|
$37.000
|
$36.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,664.000
|
$25.000
|
$10.000
|
$27.000
|
$20.000
|
$29.500
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
54,015.000
|
$0.150
|
$0.210
|
$0.200
|
$0.170
|
$0.110
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
27,007.000
|
$0.250
|
$0.210
|
$0.200
|
$0.170
|
$0.110
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
600.000
|
$25.000
|
$32.030
|
$28.500
|
$28.000
|
$30.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
225.000
|
$75.000
|
$71.930
|
$107.000
|
$82.000
|
$87.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,850.000
|
$3,675.000
|
$3,073.000
|
$3,200.000
|
$3,300.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
160.000
|
$20.000
|
$35.000
|
$35.000
|
$16.000
|
$7.800
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
18.000
|
$275.000
|
$309.750
|
$275.000
|
$290.000
|
$310.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$300.000
|
$367.500
|
$300.000
|
$320.000
|
$330.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$1,260.000
|
$930.000
|
$980.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$750.000
|
$1,155.000
|
$820.000
|
$860.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$800.000
|
$1,312.500
|
$950.000
|
$1,000.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
20.000
|
$375.000
|
$766.500
|
$430.000
|
$450.000
|
$480.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$90.000
|
$105.000
|
$100.000
|
$110.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$45.000
|
$50.000
|
$45.000
|
$34.000
|
$35.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
10.000
|
$100.000
|
$157.500
|
$120.000
|
$125.000
|
$130.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,983.000
|
$1.000
|
$1.000
|
$1.250
|
$0.600
|
$1.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
54,212.000
|
$0.350
|
$0.470
|
$0.450
|
$0.430
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,800.000
|
$0.400
|
$0.470
|
$0.450
|
$0.470
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
18,411.000
|
$0.400
|
$0.470
|
$0.450
|
$0.430
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
50.000
|
$15.000
|
$14.180
|
$13.500
|
$26.000
|
$15.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
545.000
|
$3.500
|
$5.250
|
$5.000
|
$5.300
|
$5.600
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,874.000
|
$95.000
|
$96.500
|
$97.500
|
$106.000
|
$97.000
|
|
|
SP MIXES SP-D SAC-B PG70-28
|
TON
|
9,614.000
|
$105.000
|
$112.500
|
$128.750
|
$134.000
|
$125.000
|
|
|
BONDING COURSE
|
GAL
|
5,127.000
|
$3.750
|
$5.000
|
$4.300
|
$4.600
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
261.000
|
$250.000
|
$100.000
|
$400.000
|
$200.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$275.000
|
$1.000
|
$735.000
|
$150.000
|
$300.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
20.000
|
$125.000
|
$100.000
|
$155.000
|
$250.000
|
$170.000
|
|
Totals: |
$3,476,644.500
|
$3,432,425.500
|
$4,162,981.720
|
$4,224,697.440
|
$4,237,830.720
|