REMOVING CONC (RIPRAP)
|
SY
|
115.000
|
$15.000
|
$30.000
|
$30.500
|
$23.000
|
$40.000
|
$17.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
719.000
|
$35.000
|
$7.000
|
$5.500
|
$4.150
|
$11.000
|
$8.550
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
2,670.000
|
$10.000
|
$7.000
|
$10.000
|
$13.000
|
$13.500
|
$11.780
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
1,072.000
|
$14.000
|
$9.000
|
$9.000
|
$16.000
|
$15.500
|
$17.010
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
195.000
|
$20.000
|
$10.000
|
$24.000
|
$24.500
|
$60.000
|
$16.160
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
134.270
|
$420.000
|
$150.000
|
$645.000
|
$330.000
|
$237.000
|
$1,153.520
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,788.000
|
$14.000
|
$20.000
|
$21.000
|
$49.000
|
$38.000
|
$17.470
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
16,173.000
|
$0.130
|
$0.100
|
$0.100
|
$0.090
|
$0.100
|
$0.280
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
16,173.000
|
$0.130
|
$0.100
|
$0.040
|
$0.030
|
$0.050
|
$0.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
32,346.000
|
$0.200
|
$0.240
|
$0.610
|
$0.110
|
$0.130
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
272.000
|
$20.000
|
$20.000
|
$20.000
|
$27.000
|
$38.000
|
$32.780
|
|
|
REWORK BS MTL (TY B) (12")(ORD COMP)
|
SY
|
35,811.000
|
$4.520
|
$2.000
|
$3.250
|
$3.200
|
$2.250
|
$6.020
|
|
|
CEMENT
|
TON
|
725.000
|
$160.000
|
$145.000
|
$150.000
|
$145.000
|
$162.000
|
$229.350
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
44,763.000
|
$3.100
|
$2.500
|
$3.300
|
$2.500
|
$3.250
|
$6.400
|
|
|
PRIME COAT (RC-250)
|
GAL
|
12,534.000
|
$4.000
|
$3.500
|
$3.400
|
$3.500
|
$4.350
|
$6.460
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
335.000
|
$106.000
|
$130.000
|
$105.000
|
$140.000
|
$211.000
|
$122.640
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
7,205.000
|
$75.000
|
$85.000
|
$82.000
|
$90.000
|
$122.000
|
$100.630
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,296.000
|
$2.000
|
$4.000
|
$4.150
|
$5.000
|
$6.000
|
$7.120
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
3,898.000
|
$72.000
|
$85.000
|
$89.000
|
$133.000
|
$88.000
|
$130.510
|
|
|
CURB (TYPE II)
|
LF
|
706.000
|
$8.000
|
$15.000
|
$4.000
|
$3.300
|
$13.000
|
$10.350
|
|
|
CUT & RESTORING PAV
|
SY
|
133.000
|
$110.000
|
$55.000
|
$112.000
|
$105.000
|
$135.000
|
$135.260
|
|
|
FLOWABLE BACKFILL
|
CY
|
173.000
|
$205.000
|
$160.000
|
$109.000
|
$105.000
|
$150.000
|
$153.520
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
70.000
|
$65.000
|
$15.000
|
$11.000
|
$10.500
|
$3.250
|
$15.300
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
69.000
|
$380.000
|
$430.000
|
$385.000
|
$370.000
|
$535.000
|
$499.730
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
54.000
|
$90.000
|
$41.000
|
$38.000
|
$37.000
|
$112.000
|
$138.590
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
122.000
|
$100.000
|
$50.000
|
$43.000
|
$42.000
|
$139.000
|
$86.330
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
59.000
|
$90.000
|
$52.000
|
$45.000
|
$44.000
|
$150.000
|
$128.620
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
276.000
|
$78.000
|
$65.000
|
$69.000
|
$67.500
|
$85.000
|
$85.890
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
448.000
|
$88.000
|
$110.000
|
$99.000
|
$97.000
|
$94.000
|
$107.400
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
35.000
|
$180.000
|
$140.000
|
$140.000
|
$135.000
|
$184.000
|
$170.620
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$6,880.000
|
$7,500.000
|
$6,000.000
|
$5,900.000
|
$8,100.000
|
$11,297.770
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
24.000
|
$1,000.000
|
$750.000
|
$875.000
|
$845.000
|
$1,100.000
|
$1,020.170
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,200.000
|
$750.000
|
$820.000
|
$790.000
|
$1,100.000
|
$972.760
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
64.000
|
$1,400.000
|
$850.000
|
$975.000
|
$950.000
|
$1,350.000
|
$1,400.770
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$850.000
|
$800.000
|
$735.000
|
$1,150.000
|
$1,764.480
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,230.000
|
$850.000
|
$1,050.000
|
$1,000.000
|
$1,400.000
|
$1,705.180
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$1,100.000
|
$1,800.000
|
$1,700.000
|
$1,900.000
|
$2,709.980
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$3,000.000
|
$3,800.000
|
$3,700.000
|
$3,300.000
|
$4,739.840
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
48.000
|
$66.000
|
$45.000
|
$27.000
|
$26.500
|
$107.000
|
$135.730
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
314.000
|
$70.000
|
$45.000
|
$33.000
|
$31.500
|
$107.000
|
$130.340
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$600.000
|
$2,500.000
|
$1,650.000
|
$1,600.000
|
$1,500.000
|
$10,809.050
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$250.000
|
$600.000
|
$270.000
|
$265.000
|
$300.000
|
$1,428.890
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$270.000
|
$265.000
|
$600.000
|
$2,728.910
|
|
|
REMOV STR (PIPE)
|
LF
|
738.000
|
$20.000
|
$12.000
|
$10.750
|
$10.500
|
$23.000
|
$26.910
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$242,376.000
|
$193,000.000
|
$240,000.000
|
$290,000.000
|
$320,000.000
|
$283,665.080
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$3,000.000
|
$5,000.000
|
$10,000.000
|
$27,500.000
|
$28,556.000
|
$9,848.460
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
300.000
|
$30.000
|
$32.000
|
$23.000
|
$23.000
|
$26.000
|
$51.840
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
300.000
|
$10.000
|
$7.000
|
$15.500
|
$10.500
|
$14.000
|
$19.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,170.000
|
$2.400
|
$3.500
|
$2.100
|
$2.100
|
$2.300
|
$3.520
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,170.000
|
$0.900
|
$1.000
|
$0.740
|
$0.740
|
$0.800
|
$1.260
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,670.000
|
$3.600
|
$4.000
|
$1.950
|
$1.950
|
$2.250
|
$3.630
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,670.000
|
$0.850
|
$0.750
|
$0.510
|
$0.520
|
$0.600
|
$1.080
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,285.000
|
$170.000
|
$32.000
|
$29.000
|
$43.500
|
$43.000
|
$69.630
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$3,200.000
|
$7,500.000
|
$11,000.000
|
$6,800.000
|
$5,000.000
|
$7,510.690
|
|
|
DRIVEWAYS (CONC)
|
SY
|
130.000
|
$72.000
|
$100.000
|
$90.000
|
$84.500
|
$72.000
|
$108.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,030.000
|
$46.000
|
$40.000
|
$24.000
|
$54.500
|
$70.000
|
$37.650
|
|
|
TURNOUTS (ACP)
|
SY
|
1,463.000
|
$46.000
|
$40.000
|
$19.500
|
$33.000
|
$25.000
|
$48.250
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,240.000
|
$22.500
|
$20.000
|
$19.500
|
$27.000
|
$25.000
|
$25.210
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
13,427.000
|
$0.220
|
$0.300
|
$0.560
|
$0.770
|
$0.300
|
$0.400
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
32.000
|
$190.000
|
$250.000
|
$265.000
|
$265.000
|
$450.000
|
$326.980
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
5.000
|
$260.000
|
$280.000
|
$290.000
|
$290.000
|
$475.000
|
$359.680
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
7.000
|
$350.000
|
$320.000
|
$315.000
|
$315.000
|
$350.000
|
$392.380
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$520.000
|
$1,100.000
|
$1,050.000
|
$1,100.000
|
$1,150.000
|
$1,307.910
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
4.000
|
$400.000
|
$550.000
|
$525.000
|
$525.000
|
$575.000
|
$653.960
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
7.000
|
$50.000
|
$110.000
|
$105.000
|
$105.000
|
$115.000
|
$130.800
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
27.000
|
$77.000
|
$220.000
|
$210.000
|
$210.000
|
$230.000
|
$261.590
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
26,515.000
|
$0.260
|
$0.250
|
$0.260
|
$0.790
|
$0.350
|
$0.440
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
5,972.000
|
$0.280
|
$0.300
|
$0.320
|
$1.600
|
$0.400
|
$0.510
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
14,736.000
|
$0.280
|
$0.250
|
$0.260
|
$0.790
|
$0.350
|
$0.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,266.000
|
$1.200
|
$0.500
|
$0.750
|
$1.050
|
$1.150
|
$1.780
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,004.000
|
$0.800
|
$1.000
|
$1.000
|
$1.250
|
$1.300
|
$1.870
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,426.000
|
$0.280
|
$0.260
|
$0.260
|
$0.130
|
$0.350
|
$0.310
|
|
|
PAVEMENT SEALER 24"
|
LF
|
98.000
|
$1.560
|
$1.800
|
$1.800
|
$1.600
|
$2.350
|
$4.170
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,841.000
|
$0.300
|
$0.450
|
$0.420
|
$0.440
|
$0.600
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,000.000
|
$0.240
|
$0.470
|
$0.480
|
$0.610
|
$0.600
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,808.000
|
$0.300
|
$0.450
|
$0.450
|
$0.450
|
$0.600
|
$0.660
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
156.000
|
$11.900
|
$18.000
|
$17.450
|
$14.500
|
$23.000
|
$26.470
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
1.000
|
$710.000
|
$1,000.000
|
$925.000
|
$685.000
|
$1,200.000
|
$1,369.110
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
277.000
|
$2.620
|
$3.600
|
$3.600
|
$4.000
|
$5.000
|
$6.780
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,132.000
|
$0.400
|
$0.600
|
$0.320
|
$0.840
|
$2.250
|
$0.540
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
707.000
|
$1.100
|
$2.000
|
$0.640
|
$0.840
|
$2.250
|
$2.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$120.000
|
$200.000
|
$70.000
|
$105.000
|
$350.000
|
$114.420
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$100.000
|
$3,500.000
|
$2,300.000
|
$630.000
|
$13,000.000
|
$1,317.310
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$90.000
|
$10.000
|
$70.000
|
$105.000
|
$60.000
|
$157.670
|
|
Totals: |
$2,648,384.080
|
$2,307,479.200
|
$2,471,501.100
|
$2,951,910.130
|
$3,251,174.720
|
$3,559,517.920
|