|
|
RMV (11") TRT/UNTRT BASE & ASPH PAV
|
SY
|
5,500.000
|
$20.000
|
$8.000
|
$7.300
|
$10.000
|
$9.040
|
$12.020
|
|
|
EXCAV (ROADWAY)
|
CY
|
49,555.000
|
$15.000
|
$6.000
|
$14.500
|
$20.000
|
$14.550
|
$15.810
|
|
|
SUBGR WIDEN (DC)
|
SY
|
94,800.000
|
$5.000
|
$3.750
|
$11.000
|
$4.250
|
$7.130
|
$4.570
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
2,036.000
|
$25.000
|
$5.000
|
$22.000
|
$32.000
|
$10.980
|
$33.490
|
|
|
BACKFILL (TY B)
|
STA
|
1,043.000
|
$150.000
|
$400.000
|
$170.000
|
$100.000
|
$129.440
|
$375.250
|
|
|
BLADING
|
STA
|
1,043.000
|
$150.000
|
$400.000
|
$73.500
|
$240.000
|
$129.440
|
$187.210
|
|
|
DRILL SEED (PERM_RURAL_SAND)
|
SY
|
910,311.000
|
$0.300
|
$0.130
|
$0.200
|
$0.200
|
$0.220
|
$0.140
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$250.000
|
$120.000
|
$195.000
|
$160.000
|
$135.580
|
$220.560
|
|
|
PRIME COAT (MC-30)
|
GAL
|
20,103.000
|
$6.000
|
$5.000
|
$5.100
|
$5.800
|
$5.630
|
$6.740
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
236,681.000
|
$4.000
|
$3.750
|
$2.400
|
$4.000
|
$3.940
|
$2.400
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
26,066.000
|
$5.000
|
$4.000
|
$2.500
|
$5.500
|
$3.950
|
$2.610
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,166.000
|
$10.000
|
$6.000
|
$7.900
|
$11.000
|
$6.090
|
$8.270
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
23.000
|
$300.000
|
$350.000
|
$655.000
|
$950.000
|
$712.910
|
$874.260
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
22,121.000
|
$200.000
|
$160.000
|
$145.000
|
$170.000
|
$164.760
|
$155.000
|
|
|
TACK COAT
|
GAL
|
89,799.000
|
$5.000
|
$5.200
|
$2.400
|
$5.400
|
$5.090
|
$5.280
|
|
|
D-GR HMA TY-B SAC-B PG70-28
|
TON
|
44,338.000
|
$200.000
|
$120.000
|
$145.000
|
$153.000
|
$162.970
|
$141.320
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
51,972.000
|
$200.000
|
$140.000
|
$181.800
|
$194.000
|
$214.350
|
$191.140
|
|
|
TACK COAT
|
GAL
|
16,920.000
|
$6.000
|
$5.200
|
$2.400
|
$5.500
|
$5.210
|
$5.280
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
5,563.000
|
$50.000
|
$30.000
|
$45.000
|
$63.000
|
$41.040
|
$41.140
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,563.000
|
$80.000
|
$51.000
|
$90.000
|
$103.000
|
$77.600
|
$79.000
|
|
|
PLANE ASPH CONC PAV (0" TO 2-1/2")
|
SY
|
800.000
|
$10.000
|
$10.000
|
$25.000
|
$15.000
|
$14.890
|
$21.040
|
|
|
CEM STABIL BKFL
|
CY
|
16.000
|
$350.000
|
$330.000
|
$665.000
|
$310.000
|
$378.000
|
$354.420
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
14.000
|
$300.000
|
$440.000
|
$510.000
|
$420.000
|
$270.000
|
$472.560
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.600
|
$900.000
|
$935.000
|
$765.000
|
$900.000
|
$972.000
|
$1,004.190
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
31.000
|
$600.000
|
$1,450.000
|
$815.000
|
$900.000
|
$1,080.000
|
$1,005.680
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
15.000
|
$800.000
|
$1,640.000
|
$1,000.000
|
$1,050.000
|
$1,296.000
|
$1,191.610
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
23.000
|
$1,000.000
|
$1,920.000
|
$1,200.000
|
$1,150.000
|
$1,512.000
|
$1,307.320
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
20.000
|
$2,000.000
|
$3,850.000
|
$3,400.000
|
$3,700.000
|
$5,400.000
|
$4,134.910
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
4.000
|
$15,000.000
|
$20,900.000
|
$16,500.000
|
$19,500.000
|
$12,960.000
|
$23,078.840
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
2.000
|
$16,000.000
|
$21,450.000
|
$20,500.000
|
$20,000.000
|
$15,120.000
|
$23,681.120
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
3.000
|
$17,000.000
|
$22,000.000
|
$22,500.000
|
$21,000.000
|
$17,280.000
|
$24,282.580
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$3,000.000
|
$3,850.000
|
$3,900.000
|
$4,200.000
|
$2,700.000
|
$2,565.060
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,443,000.000
|
$2,690,000.000
|
$3,200,000.000
|
$2,200,000.000
|
$1,693,345.690
|
$3,337,518.340
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$20,000.000
|
$34,000.000
|
$34,000.000
|
$20,000.000
|
$18,671.860
|
$35,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,140.000
|
$125.000
|
$45.000
|
$56.000
|
$250.000
|
$76.370
|
$39.710
|
|
|
TMA (STATIONARY)
|
DAY
|
454.000
|
$250.000
|
$300.000
|
$255.000
|
$200.000
|
$511.850
|
$518.210
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$1,500.000
|
$900.000
|
$920.000
|
$650.000
|
$1,026.770
|
$1,021.760
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
467.000
|
$60.000
|
$31.000
|
$61.000
|
$63.000
|
$64.800
|
$71.550
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
467.000
|
$30.000
|
$8.000
|
$10.000
|
$10.000
|
$10.800
|
$18.610
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,600.000
|
$7.000
|
$8.000
|
$4.650
|
$5.500
|
$4.910
|
$9.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,800.000
|
$3.000
|
$4.000
|
$1.000
|
$1.500
|
$1.080
|
$1.970
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
6,616.000
|
$6.000
|
$8.000
|
$8.150
|
$9.000
|
$8.640
|
$17.410
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,308.000
|
$3.000
|
$4.000
|
$1.000
|
$1.200
|
$1.080
|
$2.630
|
|
|
INTERSECTIONS (ACP) (TY 1)
|
SY
|
2,409.000
|
$70.000
|
$36.000
|
$53.000
|
$37.000
|
$27.780
|
$46.070
|
|
|
INTERSECTIONS (ACP) (TY 2)
|
SY
|
1,742.000
|
$70.000
|
$125.000
|
$155.000
|
$100.000
|
$81.990
|
$130.990
|
|
|
DRIVEWAYS (ACP) (TY 1)
|
SY
|
7,108.000
|
$40.000
|
$38.000
|
$54.000
|
$45.000
|
$27.570
|
$40.160
|
|
|
DRIVEWAYS (ACP) (TY 2)
|
SY
|
3,400.000
|
$40.000
|
$115.000
|
$155.000
|
$85.000
|
$82.110
|
$253.110
|
|
|
TURNOUTS (ACP)
|
SY
|
63.100
|
$200.000
|
$700.000
|
$225.000
|
$150.000
|
$196.980
|
$2,426.480
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
219,820.000
|
$0.150
|
$0.080
|
$0.100
|
$0.160
|
$0.160
|
$0.060
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
107,854.000
|
$0.150
|
$0.080
|
$0.100
|
$0.160
|
$0.160
|
$0.120
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
7.000
|
$400.000
|
$132.000
|
$120.000
|
$200.000
|
$224.640
|
$141.770
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
80.000
|
$40.000
|
$33.000
|
$30.500
|
$25.000
|
$31.320
|
$35.440
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
101.000
|
$900.000
|
$740.000
|
$690.000
|
$850.000
|
$779.760
|
$797.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$1,000.000
|
$880.000
|
$815.000
|
$940.000
|
$945.000
|
$945.120
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$1,000.000
|
$990.000
|
$920.000
|
$940.000
|
$1,089.720
|
$1,063.260
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$1,050.000
|
$970.000
|
$1,300.000
|
$1,036.800
|
$1,122.330
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
108.000
|
$120.000
|
$110.000
|
$100.000
|
$120.000
|
$108.000
|
$118.140
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
28.000
|
$120.000
|
$95.000
|
$86.500
|
$90.000
|
$87.480
|
$100.420
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
28.000
|
$30.000
|
$17.000
|
$15.500
|
$25.000
|
$10.800
|
$17.720
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
27,880.000
|
$0.300
|
$0.290
|
$0.270
|
$0.270
|
$0.280
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
1,140.000
|
$0.300
|
$0.390
|
$0.360
|
$0.360
|
$0.380
|
$0.410
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(LNDP)
|
LF
|
2,550.000
|
$0.300
|
$0.390
|
$0.360
|
$0.360
|
$0.380
|
$0.410
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
424,248.000
|
$0.300
|
$0.240
|
$0.220
|
$0.230
|
$0.240
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
5,350.000
|
$0.500
|
$0.490
|
$0.460
|
$0.460
|
$0.490
|
$0.530
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
380.000
|
$5.000
|
$6.600
|
$6.100
|
$6.200
|
$6.480
|
$7.090
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$100.000
|
$137.500
|
$125.000
|
$130.000
|
$135.000
|
$147.680
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
21,000.000
|
$0.300
|
$0.290
|
$0.270
|
$0.270
|
$0.280
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
256,208.000
|
$0.300
|
$0.240
|
$0.220
|
$0.230
|
$0.240
|
$0.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
10,396.000
|
$2.000
|
$1.400
|
$1.550
|
$0.660
|
$1.990
|
$2.360
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
19,114.000
|
$2.000
|
$1.400
|
$1.550
|
$0.660
|
$1.990
|
$2.360
|
|
|
WK ZN PAV MRK NON-REMOV (W) (LNDP ARW)
|
EA
|
20.000
|
$170.000
|
$220.000
|
$205.000
|
$210.000
|
$216.000
|
$236.280
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
1,110.000
|
$1.000
|
$0.940
|
$0.870
|
$0.900
|
$0.920
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
1,670.000
|
$1.000
|
$0.940
|
$0.870
|
$0.900
|
$0.920
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,675.000
|
$1.500
|
$1.100
|
$1.000
|
$1.050
|
$1.080
|
$1.180
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
13,940.000
|
$0.900
|
$0.900
|
$0.820
|
$0.850
|
$0.860
|
$0.950
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
212,724.000
|
$0.850
|
$0.720
|
$0.660
|
$0.700
|
$0.700
|
$0.770
|
|
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
|
LF
|
10,560.000
|
$0.900
|
$0.900
|
$0.820
|
$0.750
|
$0.860
|
$0.950
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
128,304.000
|
$0.900
|
$0.720
|
$0.660
|
$0.700
|
$0.700
|
$0.770
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
200.000
|
$20.000
|
$17.600
|
$16.500
|
$16.500
|
$17.280
|
$18.900
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
2.000
|
$300.000
|
$275.000
|
$255.000
|
$260.000
|
$270.000
|
$295.350
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
10.000
|
$600.000
|
$550.000
|
$510.000
|
$540.000
|
$540.000
|
$590.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
833.000
|
$6.000
|
$5.500
|
$5.100
|
$5.200
|
$5.400
|
$5.910
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,137.000
|
$6.000
|
$5.500
|
$5.100
|
$5.200
|
$5.400
|
$5.910
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
29,148.000
|
$1.000
|
$0.800
|
$0.760
|
$0.800
|
$0.810
|
$0.890
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$4,000.000
|
$5,400.000
|
$4,500.000
|
$10,000.000
|
$4,104.000
|
$5,907.020
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$12,000.000
|
$4,200.000
|
$12,500.000
|
$14,000.000
|
$10,113.850
|
$17,354.820
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$4,000.000
|
$2,100.000
|
$7,600.000
|
$10,000.000
|
$14,042.290
|
$16,892.990
|
|
|
REINFORCED FAB FOR ASPH PVMNT OVERLAYS
|
SY
|
415,739.000
|
$7.500
|
$6.700
|
$6.700
|
$6.500
|
$6.710
|
$7.830
|
|
|
ASPH FOR REINF FAB (PG76-28)
|
GAL
|
62,361.000
|
$6.000
|
$4.750
|
$3.400
|
$5.600
|
$4.710
|
$4.800
|
|
|
TEMP SPEED MONITOR SYS
|
EA
|
1.000
|
$15,000.000
|
$16,500.000
|
$25,000.000
|
$22,000.000
|
$8,252.420
|
$26,870.130
|
|
Totals: |
$37,873,977.200
|
$28,894,124.450
|
$32,788,633.880
|
$33,707,690.970
|
$33,866,913.808
|
$34,825,666.242
|