PREPARING ROW
|
STA
|
5.900
|
$5,500.000
|
$7,000.000
|
$20,000.000
|
$7,500.000
|
$10,135.600
|
$3,760.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
12.670
|
$10.000
|
$25.000
|
$300.000
|
$20.000
|
$84.500
|
$4.720
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
52.000
|
$39.000
|
$50.000
|
$100.000
|
$60.000
|
$50.000
|
$48.300
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
26.500
|
$470.000
|
$75.000
|
$100.000
|
$60.000
|
$65.000
|
$59.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
93.000
|
$60.000
|
$80.000
|
$100.000
|
$125.000
|
$65.000
|
$44.500
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
|
CY
|
2,447.000
|
$60.000
|
$80.000
|
$95.000
|
$150.000
|
$55.000
|
$42.200
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
5,569.000
|
$1.000
|
$2.000
|
$3.000
|
$2.000
|
$0.650
|
$1.410
|
|
|
HMCL ACP TY ASPPM, SAC-B (1.5 IN)
|
SY
|
11.900
|
$200.000
|
$500.000
|
$300.000
|
$500.000
|
$450.000
|
$300.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
60.200
|
$450.000
|
$1,000.000
|
$250.000
|
$450.000
|
$385.000
|
$707.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,007.000
|
$67.000
|
$50.000
|
$25.000
|
$35.000
|
$71.500
|
$41.800
|
|
|
CL C CONC (HEADWALL)
|
CY
|
9.850
|
$1,400.000
|
$3,500.000
|
$2,250.000
|
$4,000.000
|
$6,050.000
|
$2,800.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
15.000
|
$500.000
|
$350.000
|
$800.000
|
$250.000
|
$390.000
|
$532.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
17.040
|
$850.000
|
$800.000
|
$1,200.000
|
$700.000
|
$1,650.000
|
$904.000
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
11.300
|
$220.000
|
$350.000
|
$500.000
|
$250.000
|
$220.000
|
$582.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
9.000
|
$250.000
|
$150.000
|
$350.000
|
$150.000
|
$275.000
|
$179.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
17.000
|
$600.000
|
$600.000
|
$420.000
|
$225.000
|
$495.000
|
$994.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
28.000
|
$550.000
|
$200.000
|
$280.000
|
$300.000
|
$440.000
|
$284.000
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
70.100
|
$550.000
|
$250.000
|
$511.000
|
$350.000
|
$770.000
|
$421.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
8.000
|
$2,000.000
|
$1,100.000
|
$1,547.000
|
$1,500.000
|
$1,100.000
|
$1,440.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
32.000
|
$1,600.000
|
$1,200.000
|
$1,351.000
|
$1,600.000
|
$1,320.000
|
$1,720.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
56.000
|
$1,400.000
|
$1,300.000
|
$1,386.000
|
$1,700.000
|
$1,650.000
|
$2,000.000
|
|
|
CONC BOX CULVERT (5 FT X 7 FT) (EXTEND)
|
LF
|
27.000
|
$1,600.000
|
$1,400.000
|
$994.000
|
$2,000.000
|
$1,815.000
|
$2,400.000
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
4.000
|
$16,000.000
|
$15,000.000
|
$17,640.000
|
$15,000.000
|
$9,900.000
|
$23,600.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
1.000
|
$34,000.000
|
$17,000.000
|
$22,260.000
|
$17,500.000
|
$11,000.000
|
$38,500.000
|
|
|
WINGWALL (SW - 0) (HW=8 FT)
|
EA
|
3.000
|
$36,000.000
|
$19,000.000
|
$28,252.000
|
$20,000.000
|
$16,500.000
|
$49,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$12,000.000
|
$12,000.000
|
$10,430.000
|
$8,500.000
|
$17,600.000
|
$18,100.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$15,000.000
|
$14,000.000
|
$11,690.000
|
$8,750.000
|
$19,800.000
|
$20,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$18,500.000
|
$16,000.000
|
$13,230.000
|
$9,000.000
|
$22,000.000
|
$28,100.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$1,600.000
|
$3,000.000
|
$1,997.800
|
$3,500.000
|
$2,750.000
|
$3,300.000
|
|
|
SET (TY II) (DES 4) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$3,500.000
|
$2,226.000
|
$3,000.000
|
$6,050.000
|
$6,860.000
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$4,000.000
|
$2,282.000
|
$3,000.000
|
$6,600.000
|
$11,500.000
|
|
|
SET (TY II) (DES 5) (CMP) (3: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$5,000.000
|
$3,175.200
|
$3,500.000
|
$8,250.000
|
$10,100.000
|
|
|
REMOV STR (PIPE)
|
LF
|
40.000
|
$45.000
|
$50.000
|
$100.000
|
$30.000
|
$66.000
|
$36.900
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$500.000
|
$750.000
|
$2,500.000
|
$1,000.000
|
$2,200.000
|
$1,060.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$160,000.000
|
$150,000.000
|
$170,000.000
|
$175,000.000
|
$200,000.000
|
$212,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,500.000
|
$5,000.000
|
$3,500.000
|
$3,500.000
|
$8,500.000
|
$8,520.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
700.000
|
$6.000
|
$10.000
|
$5.000
|
$5.000
|
$0.010
|
$5.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
700.000
|
$2.000
|
$2.000
|
$3.000
|
$1.000
|
$0.010
|
$1.340
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
195.000
|
$9.000
|
$15.000
|
$1.000
|
$10.000
|
$0.010
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
195.000
|
$3.250
|
$4.000
|
$4.000
|
$1.000
|
$0.010
|
$5.400
|
|
|
CONSTRUCTING DETOURS
|
SY
|
197.000
|
$160.000
|
$140.000
|
$150.000
|
$180.000
|
$455.000
|
$128.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
160.000
|
$73.000
|
$130.000
|
$150.000
|
$125.000
|
$260.000
|
$104.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
15.000
|
$7,500.000
|
$4,000.000
|
$4,500.000
|
$5,750.000
|
$8,450.000
|
$3,730.000
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
400.000
|
$51.000
|
$250.000
|
$40.000
|
$50.000
|
$38.750
|
$215.000
|
|
|
PTB (MOVE)(STEEL)
|
LF
|
2,400.000
|
$44.000
|
$10.000
|
$30.000
|
$20.000
|
$25.000
|
$40.700
|
|
|
PTB (REMOVE)(STEEL)
|
LF
|
400.000
|
$18.000
|
$15.000
|
$20.000
|
$20.000
|
$25.000
|
$50.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$3,000.000
|
$1,300.000
|
$1,000.000
|
$1,100.000
|
$2,101.000
|
$1,890.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,000.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
$1,683.000
|
$1,520.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,500.000
|
$10,000.000
|
$9,000.000
|
$9,000.000
|
$8,904.500
|
$10,300.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
442.000
|
$40.000
|
$50.000
|
$30.000
|
$50.000
|
$52.000
|
$37.400
|
|
|
T-POST (REM/REP) (METAL)
|
EA
|
29.000
|
$50.000
|
$50.000
|
$300.000
|
$5.000
|
$33.000
|
$200.000
|
|
|
POST (W/SINGLE BRACE)(REM/REP)(METAL)
|
EA
|
16.000
|
$500.000
|
$75.000
|
$800.000
|
$10.000
|
$261.000
|
$200.000
|
|
|
HINGE SET (GATE) (EXISTING POST)
|
EA
|
1.000
|
$200.000
|
$100.000
|
$8,500.000
|
$200.000
|
$460.000
|
$2,000.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
80.000
|
$12.000
|
$25.000
|
$33.000
|
$22.000
|
$55.000
|
$24.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
24.000
|
$24.000
|
$95.000
|
$88.000
|
$80.000
|
$33.000
|
$90.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
LF
|
7,700.000
|
$3.000
|
$2.000
|
$2.200
|
$2.000
|
$1.100
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,361.000
|
$6.500
|
$5.000
|
$5.500
|
$5.000
|
$4.400
|
$4.800
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
7,700.000
|
$3.250
|
$2.000
|
$2.200
|
$2.000
|
$1.100
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
4,989.000
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$4.400
|
$4.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
56.000
|
$1.500
|
$5.000
|
$12.000
|
$2.000
|
$2.500
|
$7.100
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
2,970.000
|
$0.900
|
$5.000
|
$4.400
|
$5.000
|
$0.770
|
$4.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
12,565.000
|
$0.850
|
$5.000
|
$4.400
|
$5.000
|
$0.760
|
$4.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
214.000
|
$12.500
|
$12.000
|
$11.000
|
$12.000
|
$11.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
15,635.000
|
$2.250
|
$2.000
|
$3.300
|
$3.000
|
$1.810
|
$2.400
|
|
|
TMA (STATIONARY)
|
DAY
|
17.000
|
$300.000
|
$300.000
|
$300.000
|
$500.000
|
$250.000
|
$339.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
14.000
|
$530.000
|
$350.000
|
$300.000
|
$750.000
|
$165.000
|
$495.000
|
|
Totals: |
$1,814,403.950
|
$1,693,487.250
|
$1,766,552.600
|
$1,830,474.400
|
$1,907,907.555
|
$2,061,644.352
|