COLEMAN VARIOUS (0923-08-042)
Items: 97
County: COLEMAN
Length: 0.0000 MILES
Highway: VARIOUS
District: BROWNWOOD
Control Number: 0923-08-042
DBE Goal: 0.0%
Project: STP 2025(055)TAPS
Guaranty: $50,000.00
Time: 193 WORKING DAYS
Engineer's Estimate: $2,544,721.05
Date: 06/03/2026 1:00 PM CDT (3 months ago)
Contract Number: 6263209
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00206315
Contract Type: FEDERAL
Project Description: FOR THE CONSTRUCTION OF 1.75-MILES OF 5-FOOT-WIDE SIDEWALKS ALONG 5TH AVE FROM W WALNUT TO W 15TH ST, ALONG W 15TH ST FROM 5TH AVE TO COMMERCIAL, AND ALONG COMMERCIAL FROM W WALNUT ST TO E LIVE OAK ST. ADA RAMPS, NEW PVMT MRKS, SAFETY LIGHTING.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
BLAKE STEMBRIDGE
NATHAN MCMAHON
COLEMAN VARIOUS (0923-08-042)
Project Name: N/A
Project: STP 2025(055)TAPS
Engineer's Estimate: $2,544,721.05
Length: 0.0000 MILES
Project Class: PEDESTRIAN, SIDEWALKS & CURB RAMPS
Limits From: VARIOUS LOCATIONS IN CITY OF COLEMAN
Limits To: .
Project Description: FOR THE CONSTRUCTION OF 1.75-MILES OF 5-FOOT-WIDE SIDEWALKS ALONG 5TH AVE FROM W WALNUT TO W 15TH ST, ALONG W 15TH ST FROM 5TH AVE TO COMMERCIAL, AND ALONG COMMERCIAL FROM W WALNUT ST TO E LIVE OAK ST. ADA RAMPS, NEW PVMT MRKS, SAFETY LIGHTING.
Bidders (4)
E
Engineer's Estimate
$2,544,721.05
1
Awarded
$2,189,860.83
Over/Under Est:
-13.94%
-$354,860.22
$2,365,925.02
Over/Under Est:
-7.03%
-$178,796.03
Amt Left:
8.04%
$176,064.19
$2,696,300.89
Over/Under Est:
5.96%
$151,579.84
Amt Left:
23.13%
$506,440.06
Delta:
-13.96%
-$330,375.87
$3,040,499.74
Over/Under Est:
19.48%
$495,778.69
Amt Left:
38.84%
$850,638.91
Delta:
-12.77%
-$344,198.85
Bid Items & Bid Tabulations
97
Total
0 of 97
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
| Description | Amount |
|---|---|
| CONTRACTOR FORCE ACCOUNT WORK (PART) | $8,000.00 |
| EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) | $2,000.00 |
| SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) | $46,000.00 |
| Total: | $56,000.00 |
