COLLIN US 75 (0047-06-178)

Items: 63

County: COLLIN
Length: 0.0000 MILES (7.5380 MILES)
Highway: US 75
District: DALLAS
Control Number: 0047-06-178
DBE Goal: 0.0%
Project: CM 2B26(017)
Guaranty: $58,000.00
Time: 200 WORKING DAYS
Engineer's Estimate: $3,140,076.50
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263216
Type: INSTALL FIBER OPTIC CABLE ITS
Project ID: A00208481
Contract Type: FEDERAL
Project Description: ADD ITS FIBER OPTIC CABLE; INSTALL ADDITIONAL CCTV
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$3,140,076.50
$2,840,382.40
Over/Under Est: -9.54% -$299,694.10
Over/Under Est: -4.07% -$127,919.25
Amt Left: 6.05% $171,774.85
$3,019,376.00
Over/Under Est: -3.84% -$120,700.50
Amt Left: 6.3% $178,993.60
Delta: -0.24% -$7,218.75
Over/Under Est: -2.29% -$71,949.51
Amt Left: 8.02% $227,744.59
Delta: -1.61% -$48,750.99
Over/Under Est: -2.07% -$65,076.50
Amt Left: 8.26% $234,617.60
Delta: -0.22% -$6,873.01
$3,158,891.85
Over/Under Est: 0.6% $18,815.35
Amt Left: 11.21% $318,509.45
Delta: -2.73% -$83,891.85
Over/Under Est: 2.9% $91,179.00
Amt Left: 13.76% $390,873.10
Delta: -2.29% -$72,363.65

Bid Items & Bid Tabulations

63 Total 0 of 63
COLLIN  |  US 75  |  DALLAS  |  0047-06-178  |  09/03/2026 1:00 PM CDT  |  $3,140,076.50  |  CM 2B26(017)  |  INSTL FIBER OPTIC CABLE ITS  |  200 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SICE, INC.
ELECNOR BELCO ELECTRIC, INC.
LIGHT IT UP ELECTRIC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
MICA CORPORATION
LUMIN8 TRANSPORTATION TECHNOLOGIES, LLC
DRILL SHAFT (48 IN)
LF 21.000 $540.000 $451.265 $494.000 $625.000 $930.380 $1,070.000 $712.000 $1,078.000
RIPRAP (CONC)(4 IN)
CY 1.250 $1,065.000 $1,088.779 $929.000 $1,500.000 $1,105.750 $1,215.000 $2,440.000 $1,318.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $1,030.000 $890.662 $387.000 $1,500.000 $1,105.750 $1,275.000 $985.000 $1,335.000
MOBILIZATION
LS 1.000 $250,000.000 $281,458.063 $252,918.000 $285,000.000 $264,768.270 $124,943.500 $258,000.000 $324,091.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $10,500.000 $4,782.521 $6,663.000 $5,000.000 $26,183.090 $7,000.000 $30,400.000 $7,027.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 40.000 $160.000 $148.422 $149.000 $100.000 $54.920 $35.000 $120.000 $105.000
TMA (STATIONARY)
DAY 80.000 $225.000 $279.492 $180.000 $275.000 $351.170 $345.000 $433.000 $305.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $8.500 $4.460 $14.000 $8.000 $9.440 $4.500 $6.850 $21.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.750 $0.857 $5.000 $2.000 $3.540 $0.700 $1.050 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $27.000 $39.585 $30.000 $40.000 $31.740 $51.000 $27.300 $35.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,400.000 $2,968.872 $1,549.000 $1,850.000 $2,135.800 $6,450.000 $1,444.000 $1,827.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $989.624 $238.000 $800.000 $590.000 $1,920.000 $210.000 $281.000
CONDT (HDPE) (3") BORE
LF 310.000 $32.000 $23.761 $34.000 $40.000 $33.810 $31.000 $26.000 $22.000
CONDT (PVC) (SCH 40) (2")
LF 1,025.000 $12.000 $14.369 $17.000 $14.000 $19.540 $23.000 $14.850 $15.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 460.000 $32.000 $17.271 $28.000 $32.000 $32.770 $28.000 $19.600 $29.000
CONDT (PVC) (SCH 40) (3")
LF 2,730.000 $14.000 $25.786 $20.000 $16.000 $25.890 $26.000 $13.900 $16.000
CONDT (PVC) (SCH 40) (4")
LF 330.000 $28.000 $13.337 $26.000 $20.000 $26.990 $28.000 $8.900 $17.000
CONDT (RM) (2")
LF 335.000 $50.000 $48.751 $60.000 $40.000 $35.180 $50.000 $56.000 $51.000
CONDUIT (PREPARE)
LF 12,145.000 $1.250 $1.109 $2.000 $1.000 $1.860 $1.500 $2.000 $3.000
ITS MULTI-DUCT CND (PVC-40)
LF 18,035.000 $30.000 $38.200 $29.200 $26.250 $20.530 $35.000 $22.870 $17.000
ITS MULTI-DUCT CND (RMC)
LF 775.000 $94.500 $95.800 $122.200 $96.500 $126.770 $60.000 $125.700 $70.000
ITS MULTI-DUCT CND (HDPE)(BORE)
LF 14,450.000 $40.000 $29.254 $53.950 $51.000 $36.070 $40.000 $42.650 $43.000
ELEC CONDR (NO.8) INSULATED
LF 38,160.000 $2.000 $1.634 $1.750 $2.100 $2.030 $2.800 $2.330 $2.000
ELEC CONDR (NO.6) BARE
LF 925.000 $2.250 $1.867 $2.250 $2.400 $3.090 $3.250 $2.900 $2.000
ELEC CONDR (NO.6) INSULATED
LF 1,850.000 $2.500 $2.258 $2.250 $2.800 $3.550 $3.500 $2.900 $2.000
ELEC CONDR (NO.4) BARE
LF 955.000 $3.500 $2.889 $3.050 $3.200 $4.070 $5.000 $3.700 $3.000
ELEC CONDR (NO.4) INSULATED
LF 1,910.000 $3.750 $3.221 $3.050 $3.650 $4.390 $5.500 $3.700 $3.000
ELEC CONDR (NO.2) BARE
LF 600.000 $4.750 $4.430 $4.150 $4.750 $5.240 $5.500 $5.700 $5.000
ELEC CONDR (NO.2) INSULATED
LF 1,200.000 $5.250 $4.866 $4.150 $5.750 $6.540 $6.500 $5.700 $5.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 9.000 $4,700.000 $4,287.396 $5,421.000 $4,650.000 $6,505.130 $5,400.000 $4,060.000 $4,746.000
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 50.000 $5,500.000 $4,739.380 $6,005.000 $5,330.000 $6,090.120 $5,500.000 $4,246.000 $5,195.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 8.000 $10,000.000 $7,265.361 $8,251.000 $7,575.000 $8,990.210 $9,175.000 $6,684.000 $5,483.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,700.000 $1,670.940 $1,966.000 $1,700.000 $1,422.150 $5,000.000 $1,866.000 $1,973.000
REMOVE GROUND BOX
EA 7.000 $275.000 $263.900 $476.000 $300.000 $1,187.680 $200.000 $364.000 $327.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $650.000 $734.060 $1,072.000 $800.000 $2,046.430 $2,045.000 $546.000 $700.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $7,500.000 $6,974.884 $8,613.000 $7,400.000 $8,143.140 $7,500.000 $9,390.000 $7,113.000
ELC SRV TY D 120/240 100(NS)SS(N)EX(O)
EA 1.000 $7,500.000 $2,720.543 $5,817.000 $5,200.000 $5,429.140 $2,675.000 $5,462.000 $6,512.000
ELC SRV TY D 120/240 150(NS)SS(N)EX(O)
EA 1.000 $8,500.000 $3,472.657 $6,510.000 $5,800.000 $6,101.740 $3,700.000 $5,808.000 $6,793.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $38.000 $46.183 $39.000 $50.000 $35.400 $51.000 $44.000 $56.000
INSTALL CIRCUIT BREAKER
EA 5.000 $875.000 $599.510 $197.000 $500.000 $803.240 $70.000 $309.000 $176.000
ITS COM CBL (ETHERNET)
LF 905.000 $2.250 $2.153 $2.500 $2.000 $5.780 $3.200 $10.350 $2.000
SYSTEM INTEGRATION
LS 1.000 $40,000.000 $8,458.250 $22,152.000 $17,000.000 $39,846.500 $6,400.000 $30,195.000 $12,402.000
ITS RVSD (DATA COLLECT & WWA) SYS
EA 8.000 $14,500.000 $12,558.614 $14,714.000 $11,375.000 $16,327.450 $13,600.000 $16,940.000 $16,009.000
REMOVE ITS RSVD (DC ONLY)
EA 7.000 $250.000 $634.822 $269.000 $650.000 $1,087.200 $575.000 $1,545.000 $308.000
ITS POLE (60 FT)(90 MPH)
EA 1.000 $26,000.000 $33,324.008 $28,174.000 $26,300.000 $30,808.410 $34,250.000 $23,852.000 $38,962.000
ITS POLE MNT CAB (TY 3)(CONF 1)
EA 1.000 $6,500.000 $6,384.893 $6,695.000 $6,000.000 $9,247.450 $8,600.000 $6,295.000 $7,877.000
GROUND BOX (PREPARE)
EA 37.000 $400.000 $197.925 $197.000 $300.000 $796.160 $450.000 $615.000 $1,084.000
REMOVE ITS RADIO
EA 22.000 $1,000.000 $846.430 $197.000 $1,200.000 $993.620 $470.000 $1,596.000 $257.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $1,500.000 $846.430 $791.000 $800.000 $2,299.960 $970.000 $3,672.000 $350.000
CCTV MOUNT (PEDESTAL)
EA 1.000 $750.000 $763.289 $243.000 $400.000 $367.380 $900.000 $1,033.000 $3,373.000
FIBER OPTIC CBL (SINGLE-MODE)(36 FIBER)
LF 40,645.000 $4.000 $2.826 $2.200 $3.250 $2.800 $4.000 $2.920 $6.000
FIBER OPTIC FUSION SPLICE
EA 144.000 $235.000 $27.763 $70.000 $65.000 $53.100 $51.000 $78.500 $233.000
FIBER OPTIC PATCH PANEL (36 POSITIONS)
EA 2.000 $2,200.000 $1,237.527 $2,311.000 $3,400.000 $1,469.180 $3,860.000 $2,170.000 $5,331.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 4.000 $1,100.000 $935.525 $1,072.000 $1,500.000 $1,111.440 $960.000 $1,972.000 $4,073.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 21,900.000 $2.500 $2.463 $1.400 $2.000 $1.310 $3.650 $3.750 $5.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 18.000 $1,650.000 $704.476 $760.000 $950.000 $1,631.160 $1,500.000 $1,096.000 $3,348.000
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
LF 42,370.000 $5.000 $2.826 $2.400 $3.500 $1.530 $4.400 $3.510 $7.000
FIBER OPTIC PATCH PANEL (96 POSITION)
EA 6.000 $5,000.000 $17,392.979 $4,852.000 $9,000.000 $9,446.700 $9,700.000 $4,781.000 $5,287.000
FIBER OPTIC PATCH PANEL (48 POSITION)
EA 2.000 $2,500.000 $3,763.168 $2,821.000 $4,600.000 $5,097.020 $5,100.000 $2,654.000 $2,586.000
ETHERNET SWITCH (INSTALL ONLY)
EA 8.000 $1,000.000 $328.302 $395.000 $750.000 $938.520 $625.000 $1,793.000 $239.000
INSTALLATION OF TERMINAL SERVER
EA 1.000 $1,000.000 $541.716 $3,164.000 $500.000 $1,115.520 $3,850.000 $1,005.000 $3,513.000
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 6.000 $15,000.000 $10,215.943 $9,915.000 $12,075.000 $17,432.900 $8,500.000 $14,870.000 $14,469.000
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 1.000 $17,500.000 $15,808.995 $14,110.000 $15,600.000 $23,413.630 $12,400.000 $17,910.000 $19,318.000
Totals: $3,140,076.500 $2,840,382.372 $3,012,157.250 $3,019,376.000 $3,068,126.988 $3,075,000.000 $3,158,891.850 $3,231,255.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $3,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $6,000.00
MATERIAL FURNISHED BY THE STATE (PART) $30,500.00
MATERIAL FURNISHED BY THE STATE (PART) $24,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $66,500.00