|
|
PREPARING ROW
|
STA
|
764.680
|
$500.000
|
$419.000
|
$2,100.000
|
$50.000
|
$195.610
|
$1,000.000
|
$482.510
|
$950.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
518.000
|
$25.000
|
$17.000
|
$15.750
|
$60.000
|
$13.200
|
$30.000
|
$13.530
|
$20.280
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
18,516.000
|
$2.500
|
$5.350
|
$7.350
|
$6.000
|
$4.400
|
$12.000
|
$2.610
|
$5.950
|
|
|
REMOV STAB BASE & ASPH PAV (4"-14")
|
SY
|
16,753.000
|
$5.000
|
$5.350
|
$16.800
|
$5.000
|
$15.400
|
$5.000
|
$2.390
|
$19.490
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
28,646.090
|
$8.180
|
$13.000
|
$4.200
|
$16.000
|
$14.000
|
$10.000
|
$14.950
|
$16.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
9,287.720
|
$4.990
|
$21.000
|
$31.500
|
$7.000
|
$14.000
|
$20.000
|
$18.560
|
$21.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
178,434.000
|
$1.250
|
$0.780
|
$2.100
|
$1.200
|
$1.630
|
$2.600
|
$3.890
|
$2.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
178,434.000
|
$0.120
|
$0.100
|
$0.210
|
$0.120
|
$0.200
|
$0.180
|
$0.720
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
178,434.000
|
$0.300
|
$0.070
|
$0.100
|
$0.100
|
$0.170
|
$0.150
|
$0.320
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
34,286.000
|
$5.500
|
$0.010
|
$0.010
|
$1.000
|
$26.400
|
$0.100
|
$26.330
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
112,770.000
|
$7.600
|
$14.850
|
$10.500
|
$17.000
|
$14.720
|
$12.860
|
$10.230
|
$27.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,807.000
|
$160.000
|
$193.000
|
$150.000
|
$190.000
|
$182.600
|
$175.000
|
$197.460
|
$187.890
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
121,265.000
|
$3.000
|
$3.000
|
$3.080
|
$6.500
|
$4.140
|
$6.000
|
$4.670
|
$6.750
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
22,554.600
|
$3.500
|
$11.500
|
$4.200
|
$4.500
|
$5.400
|
$4.000
|
$5.030
|
$5.890
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
22,942.000
|
$70.000
|
$96.500
|
$79.000
|
$93.000
|
$97.000
|
$83.700
|
$108.930
|
$98.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
41,691.000
|
$75.000
|
$96.500
|
$84.000
|
$94.000
|
$96.150
|
$88.700
|
$107.730
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,242.000
|
$70.000
|
$111.500
|
$95.000
|
$80.000
|
$76.500
|
$125.000
|
$114.920
|
$108.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
5,315.000
|
$2.000
|
$0.840
|
$1.500
|
$2.500
|
$1.270
|
$10.000
|
$6.400
|
$1.460
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
403,759.000
|
$2.000
|
$0.680
|
$1.250
|
$2.000
|
$1.270
|
$1.350
|
$2.390
|
$1.460
|
|
|
CUT & RESTORING PAV
|
SY
|
383.000
|
$115.000
|
$175.000
|
$157.500
|
$105.000
|
$192.500
|
$165.000
|
$104.350
|
$73.210
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
645.000
|
$3.000
|
$15.000
|
$5.250
|
$12.000
|
$16.500
|
$20.000
|
$3.060
|
$5.770
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
18.000
|
$250.000
|
$450.000
|
$735.000
|
$470.000
|
$495.000
|
$805.000
|
$457.130
|
$591.540
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
212.000
|
$250.000
|
$233.000
|
$262.500
|
$100.000
|
$233.200
|
$280.000
|
$219.410
|
$219.540
|
|
|
RETROFIT RAIL (TY T552)(HPC)
|
LF
|
2,567.320
|
$200.000
|
$207.000
|
$210.000
|
$120.000
|
$218.670
|
$145.000
|
$339.000
|
$265.460
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
200.000
|
$180.000
|
$500.000
|
$315.000
|
$365.000
|
$550.000
|
$250.000
|
$243.200
|
$221.950
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,387.000
|
$50.000
|
$48.000
|
$63.000
|
$46.000
|
$52.800
|
$65.000
|
$61.200
|
$50.420
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,577.000
|
$61.000
|
$65.000
|
$73.500
|
$92.500
|
$71.500
|
$85.000
|
$74.580
|
$83.040
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
24.000
|
$75.000
|
$80.000
|
$105.000
|
$105.000
|
$88.000
|
$90.000
|
$110.190
|
$128.730
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
77.000
|
$75.000
|
$80.000
|
$115.500
|
$135.000
|
$88.000
|
$145.000
|
$115.660
|
$149.910
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
913.000
|
$100.000
|
$110.000
|
$126.000
|
$158.000
|
$121.000
|
$145.000
|
$138.290
|
$191.830
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
132.000
|
$175.000
|
$180.000
|
$210.000
|
$210.000
|
$198.000
|
$200.000
|
$237.920
|
$247.800
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$4,100.000
|
$4,500.000
|
$8,400.000
|
$3,675.000
|
$4,950.000
|
$7,346.000
|
$7,050.510
|
$6,515.580
|
|
|
HEADWALL (CH - FW - 15) (DIA= 18 IN)
|
EA
|
2.000
|
$3,500.000
|
$3,500.000
|
$4,200.000
|
$2,100.000
|
$3,850.000
|
$2,682.000
|
$14,077.200
|
$5,482.760
|
|
|
HEADWALL (CH - FW - 15) (DIA= 24 IN)
|
EA
|
2.000
|
$3,750.000
|
$4,000.000
|
$5,250.000
|
$3,150.000
|
$4,400.000
|
$2,511.000
|
$4,429.050
|
$5,002.950
|
|
|
HEADWALL (CH - FW - 30) (DIA= 24 IN)
|
EA
|
1.000
|
$3,750.000
|
$4,500.000
|
$9,450.000
|
$3,675.000
|
$4,950.000
|
$5,165.000
|
$15,561.540
|
$9,562.740
|
|
|
HEADWALL (CH - FW - 45) (DIA= 30 IN)
|
EA
|
1.000
|
$4,500.000
|
$4,800.000
|
$11,550.000
|
$4,400.000
|
$5,280.000
|
$10,388.000
|
$5,386.690
|
$10,883.370
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$2,500.000
|
$4,000.000
|
$6,300.000
|
$3,100.000
|
$4,400.000
|
$3,415.000
|
$4,709.230
|
$6,605.940
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$3,000.000
|
$4,500.000
|
$8,400.000
|
$3,675.000
|
$4,950.000
|
$5,158.000
|
$5,516.110
|
$12,642.500
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
2.000
|
$8,000.000
|
$10,500.000
|
$7,350.000
|
$5,250.000
|
$11,550.000
|
$14,145.000
|
$9,542.130
|
$19,333.730
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
96.000
|
$650.000
|
$700.000
|
$735.000
|
$735.000
|
$770.000
|
$1,200.000
|
$821.780
|
$876.910
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
22.000
|
$1,100.000
|
$750.000
|
$840.000
|
$840.000
|
$825.000
|
$1,200.000
|
$1,363.290
|
$874.390
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$900.000
|
$945.000
|
$892.000
|
$990.000
|
$1,500.000
|
$1,700.610
|
$1,248.570
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
212.000
|
$1,100.000
|
$900.000
|
$945.000
|
$840.000
|
$990.000
|
$1,400.000
|
$1,401.270
|
$1,248.580
|
|
|
SET (TY II) (27 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,300.000
|
$1,800.000
|
$1,050.000
|
$1,575.000
|
$1,980.000
|
$1,400.000
|
$1,415.720
|
$1,257.810
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,800.000
|
$1,155.000
|
$2,100.000
|
$1,980.000
|
$1,400.000
|
$1,818.170
|
$1,258.190
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$2,000.000
|
$1,365.000
|
$2,625.000
|
$2,200.000
|
$2,000.000
|
$3,303.710
|
$1,655.870
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$4,000.000
|
$4,500.000
|
$3,150.000
|
$3,675.000
|
$4,950.000
|
$4,000.000
|
$4,168.070
|
$3,128.790
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$7,000.000
|
$7,500.000
|
$4,200.000
|
$5,250.000
|
$8,250.000
|
$8,500.000
|
$9,745.650
|
$8,708.560
|
|
|
REMOV STR (SET)
|
EA
|
156.000
|
$185.000
|
$200.000
|
$210.000
|
$420.000
|
$220.000
|
$650.000
|
$482.730
|
$442.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
42.000
|
$1,200.000
|
$750.000
|
$840.000
|
$787.000
|
$825.000
|
$1,750.000
|
$1,372.990
|
$587.800
|
|
|
REMOV STR (PIPE)
|
LF
|
7,341.000
|
$12.500
|
$12.000
|
$11.550
|
$19.000
|
$13.200
|
$5.500
|
$15.270
|
$10.230
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,150,000.000
|
$459,500.000
|
$1,467,000.000
|
$1,600,000.000
|
$996,232.270
|
$1,772,000.000
|
$1,500,000.000
|
$2,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$12,000.000
|
$14,200.000
|
$42,000.000
|
$57,700.000
|
$16,956.180
|
$56,000.000
|
$24,236.100
|
$7,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
9,576.000
|
$25.000
|
$25.000
|
$42.000
|
$28.000
|
$28.270
|
$25.700
|
$31.440
|
$98.520
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
9,576.000
|
$6.000
|
$5.000
|
$10.500
|
$6.500
|
$5.470
|
$4.970
|
$8.060
|
$29.230
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
409.000
|
$20.000
|
$17.000
|
$21.000
|
$15.000
|
$31.770
|
$28.880
|
$23.640
|
$23.520
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
409.000
|
$6.500
|
$6.000
|
$10.500
|
$2.000
|
$7.370
|
$6.700
|
$8.800
|
$11.510
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,680.000
|
$2.000
|
$2.500
|
$1.580
|
$2.900
|
$3.170
|
$2.880
|
$2.680
|
$5.010
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,680.000
|
$0.500
|
$0.750
|
$0.260
|
$1.000
|
$0.620
|
$0.560
|
$0.730
|
$0.520
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
15,393.000
|
$4.000
|
$3.000
|
$6.830
|
$2.750
|
$3.810
|
$3.460
|
$4.390
|
$4.030
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
15,393.000
|
$1.200
|
$0.500
|
$1.050
|
$0.750
|
$0.840
|
$0.760
|
$0.990
|
$0.520
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
660.000
|
$25.000
|
$85.000
|
$31.500
|
$84.000
|
$84.490
|
$21.000
|
$26.330
|
$98.470
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
4,800.000
|
$6.000
|
$32.000
|
$7.350
|
$6.500
|
$17.670
|
$9.500
|
$5.710
|
$17.810
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
660.000
|
$7.000
|
$15.000
|
$10.500
|
$13.250
|
$19.590
|
$10.500
|
$10.610
|
$23.960
|
|
|
DRIVEWAYS (ACP)
|
SY
|
17,771.000
|
$30.000
|
$31.500
|
$27.580
|
$40.000
|
$41.320
|
$40.000
|
$31.970
|
$31.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
430.000
|
$90.000
|
$110.000
|
$119.000
|
$92.000
|
$154.800
|
$135.000
|
$95.970
|
$66.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
141,000.000
|
$0.200
|
$0.140
|
$0.110
|
$0.100
|
$0.200
|
$0.250
|
$0.130
|
$0.370
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
68,521.000
|
$0.200
|
$0.140
|
$0.110
|
$0.120
|
$0.220
|
$0.250
|
$0.190
|
$0.340
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,800.000
|
$19.000
|
$17.850
|
$18.740
|
$18.000
|
$19.640
|
$19.500
|
$24.830
|
$21.110
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
28.000
|
$1,750.000
|
$1,735.000
|
$2,103.330
|
$1,550.000
|
$1,633.500
|
$1,575.000
|
$2,174.560
|
$2,599.800
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
16.000
|
$1,000.000
|
$915.000
|
$960.750
|
$1,075.000
|
$1,006.500
|
$875.000
|
$1,389.840
|
$947.340
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,467.000
|
$7.500
|
$2.250
|
$2.360
|
$2.300
|
$2.480
|
$3.000
|
$3.040
|
$3.250
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,500.000
|
$2,485.000
|
$2,609.250
|
$2,700.000
|
$2,733.500
|
$2,275.000
|
$3,133.960
|
$2,463.090
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
32.000
|
$200.000
|
$220.000
|
$231.000
|
$263.000
|
$242.000
|
$225.000
|
$315.680
|
$243.600
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$8,000.000
|
$19,550.000
|
$21,000.000
|
$22,350.000
|
$21,505.000
|
$17,100.000
|
$14,205.540
|
$21,166.370
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
34.000
|
$1,300.000
|
$1,425.000
|
$2,100.000
|
$2,060.000
|
$1,567.500
|
$1,360.000
|
$1,833.570
|
$1,542.820
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$680.000
|
$700.000
|
$1,050.000
|
$1,460.000
|
$770.000
|
$550.000
|
$1,331.330
|
$757.880
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
103.000
|
$250.000
|
$160.000
|
$225.750
|
$225.000
|
$258.500
|
$350.070
|
$297.580
|
$243.600
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
12.000
|
$300.000
|
$210.000
|
$236.250
|
$257.000
|
$302.500
|
$375.070
|
$346.140
|
$270.670
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$450.000
|
$470.000
|
$624.750
|
$620.000
|
$693.000
|
$550.070
|
$689.470
|
$460.140
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
143.000
|
$400.000
|
$365.000
|
$348.600
|
$410.000
|
$479.600
|
$390.000
|
$510.110
|
$422.240
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
32.000
|
$75.000
|
$97.000
|
$47.250
|
$47.000
|
$106.700
|
$50.000
|
$96.400
|
$54.130
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
144.000
|
$26.000
|
$18.000
|
$18.900
|
$29.000
|
$19.800
|
$25.000
|
$33.710
|
$27.070
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
152,985.000
|
$0.300
|
$0.180
|
$0.190
|
$0.190
|
$0.200
|
$0.180
|
$0.240
|
$0.320
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
165,971.000
|
$0.300
|
$0.180
|
$0.190
|
$0.190
|
$0.200
|
$0.180
|
$0.240
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,500.000
|
$1.000
|
$1.000
|
$1.050
|
$1.050
|
$1.130
|
$1.000
|
$0.670
|
$1.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
250.000
|
$1.000
|
$8.000
|
$8.400
|
$8.400
|
$9.040
|
$8.000
|
$10.210
|
$12.990
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
800.000
|
$1.000
|
$1.000
|
$1.050
|
$1.050
|
$1.130
|
$1.000
|
$0.720
|
$1.570
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,500.000
|
$1.000
|
$1.000
|
$1.050
|
$1.050
|
$1.130
|
$1.000
|
$0.690
|
$1.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
94.000
|
$0.750
|
$0.750
|
$2.040
|
$0.600
|
$1.470
|
$1.600
|
$1.290
|
$0.340
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
15,315.000
|
$0.750
|
$0.650
|
$2.120
|
$0.600
|
$1.470
|
$1.150
|
$0.910
|
$0.340
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
748.000
|
$5.000
|
$5.500
|
$5.780
|
$5.780
|
$6.220
|
$5.500
|
$6.880
|
$7.040
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
10.000
|
$45.000
|
$65.000
|
$68.250
|
$68.250
|
$73.490
|
$65.000
|
$47.070
|
$97.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
152,985.000
|
$0.330
|
$0.360
|
$0.380
|
$0.380
|
$0.410
|
$0.360
|
$0.340
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,761.000
|
$0.330
|
$0.460
|
$0.480
|
$0.480
|
$0.520
|
$0.460
|
$0.340
|
$0.490
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
120,019.000
|
$0.330
|
$0.400
|
$0.420
|
$0.420
|
$0.450
|
$0.400
|
$0.350
|
$0.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,937.000
|
$3.500
|
$3.300
|
$3.470
|
$3.470
|
$3.730
|
$3.300
|
$3.280
|
$4.330
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
47.000
|
$3.500
|
$3.300
|
$3.470
|
$3.470
|
$3.730
|
$3.300
|
$3.960
|
$4.330
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,000.000
|
$8,100.000
|
$5,160.000
|
$6,800.000
|
$16,035.130
|
$13,500.000
|
$5,071.880
|
$5,196.860
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$18,000.000
|
$15,750.000
|
$5,900.000
|
$4,879.370
|
$17,000.000
|
$11,371.350
|
$5,763.400
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$15,000.000
|
$22,500.000
|
$42,000.000
|
$22,000.000
|
$107,071.470
|
$22,500.000
|
$11,407.260
|
$52,446.880
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
104.000
|
$45.000
|
$75.000
|
$31.500
|
$40.000
|
$69.270
|
$75.000
|
$52.510
|
$216.170
|
|
Totals: |
$13,470,951.919
|
$15,143,487.860
|
$16,785,856.048
|
$17,366,978.500
|
$17,407,388.389
|
$17,727,633.760
|
$19,571,154.344
|
$22,814,923.881
|