PREPARING ROW
|
STA
|
407.000
|
$600.000
|
$1,000.000
|
$1,000.000
|
$50.000
|
$750.000
|
$750.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
13.000
|
$70.000
|
$144.040
|
$87.000
|
$15.000
|
$20.000
|
$210.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,978.000
|
$12.000
|
$15.410
|
$18.000
|
$9.000
|
$12.000
|
$21.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
11,994.000
|
$6.550
|
$5.690
|
$3.000
|
$7.000
|
$18.530
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
7,738.000
|
$8.000
|
$8.450
|
$8.000
|
$6.000
|
$41.040
|
$12.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,247.000
|
$12.000
|
$13.470
|
$19.000
|
$30.000
|
$18.950
|
$50.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,520.000
|
$13.000
|
$7.430
|
$11.000
|
$30.000
|
$15.590
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
407.000
|
$225.000
|
$95.860
|
$210.000
|
$140.000
|
$350.400
|
$500.000
|
|
|
BLADING
|
STA
|
348.000
|
$100.000
|
$146.830
|
$120.000
|
$120.000
|
$301.500
|
$50.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
258,828.000
|
$0.120
|
$0.700
|
$0.155
|
$0.010
|
$0.140
|
$0.160
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
258,828.000
|
$0.120
|
$0.660
|
$0.142
|
$0.010
|
$0.100
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
77,006.000
|
$2.000
|
$0.030
|
$0.010
|
$0.010
|
$0.800
|
$0.010
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
11,674.000
|
$66.000
|
$73.800
|
$81.000
|
$90.000
|
$100.590
|
$84.000
|
|
|
PLANE ASPH CONC PAV (1" TO 3")
|
SY
|
116,744.000
|
$2.000
|
$1.520
|
$1.280
|
$1.000
|
$0.980
|
$1.500
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
99.000
|
$225.000
|
$302.740
|
$72.000
|
$70.000
|
$289.490
|
$315.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,640.000
|
$58.000
|
$70.340
|
$46.000
|
$45.000
|
$45.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,394.000
|
$68.000
|
$86.090
|
$77.000
|
$75.000
|
$65.000
|
$60.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
322.000
|
$90.000
|
$104.510
|
$103.000
|
$100.000
|
$85.000
|
$90.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
317.000
|
$130.000
|
$147.700
|
$142.000
|
$138.000
|
$125.000
|
$120.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
206.000
|
$700.000
|
$1,254.120
|
$770.000
|
$750.000
|
$675.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
66.000
|
$1,000.000
|
$1,662.770
|
$985.000
|
$950.000
|
$1,100.000
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$2,300.000
|
$2,125.820
|
$2,100.000
|
$2,000.000
|
$3,200.000
|
$2,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$4,000.000
|
$4,920.160
|
$4,650.000
|
$4,500.000
|
$6,500.000
|
$6,000.000
|
|
|
REMOV STR (SET)
|
EA
|
86.000
|
$300.000
|
$519.910
|
$310.000
|
$300.000
|
$150.000
|
$350.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,000.000
|
$2,625.460
|
$1,040.000
|
$1,000.000
|
$800.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,249.000
|
$15.000
|
$24.220
|
$15.550
|
$15.000
|
$10.000
|
$12.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$724,000.000
|
$971,033.500
|
$653,708.000
|
$900,000.000
|
$866,657.000
|
$1,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$10,000.000
|
$30,000.000
|
$16,000.000
|
$4,000.000
|
$19,100.000
|
$52,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
620.000
|
$28.000
|
$32.000
|
$37.000
|
$10.000
|
$32.000
|
$34.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
620.000
|
$8.750
|
$8.000
|
$14.000
|
$5.000
|
$8.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
166.000
|
$24.000
|
$15.000
|
$20.000
|
$10.000
|
$15.000
|
$23.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
166.000
|
$8.500
|
$5.000
|
$14.000
|
$5.000
|
$5.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,265.000
|
$1.800
|
$3.000
|
$1.850
|
$3.000
|
$3.000
|
$1.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,265.000
|
$0.500
|
$0.500
|
$0.490
|
$1.000
|
$0.500
|
$0.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,850.000
|
$3.000
|
$5.000
|
$3.500
|
$5.000
|
$5.000
|
$3.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,850.000
|
$1.100
|
$0.750
|
$1.080
|
$1.000
|
$0.750
|
$1.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
1,017.000
|
$90.000
|
$194.000
|
$120.000
|
$110.000
|
$95.000
|
$110.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
3,614.000
|
$50.000
|
$43.640
|
$56.000
|
$55.000
|
$45.370
|
$55.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,961.000
|
$85.000
|
$90.000
|
$105.000
|
$100.000
|
$95.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,380.000
|
$40.000
|
$41.830
|
$61.000
|
$60.000
|
$44.020
|
$63.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
63,368.000
|
$0.350
|
$0.180
|
$0.085
|
$0.120
|
$0.140
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
31,684.000
|
$0.350
|
$0.200
|
$0.085
|
$0.120
|
$0.140
|
$0.120
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
55.000
|
$255.000
|
$269.000
|
$335.000
|
$270.000
|
$269.000
|
$282.450
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$270.000
|
$299.000
|
$408.000
|
$300.000
|
$299.000
|
$313.950
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$580.000
|
$669.000
|
$820.000
|
$700.000
|
$669.000
|
$702.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
112.000
|
$500.000
|
$588.000
|
$890.000
|
$600.000
|
$588.000
|
$617.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$575.000
|
$758.000
|
$955.000
|
$800.000
|
$758.000
|
$795.900
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
5.000
|
$820.000
|
$969.000
|
$1,160.000
|
$1,000.000
|
$696.000
|
$1,017.450
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
12.000
|
$850.000
|
$1,067.000
|
$1,275.000
|
$1,100.000
|
$1,067.000
|
$1,120.350
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,000.000
|
$1,269.000
|
$1,465.000
|
$1,300.000
|
$1,269.000
|
$1,332.450
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
9.000
|
$1,000.000
|
$1,287.000
|
$1,570.000
|
$1,350.000
|
$1,287.000
|
$1,351.350
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
20.000
|
$50.000
|
$69.000
|
$71.500
|
$75.000
|
$69.000
|
$73.240
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,480.000
|
$0.400
|
$0.360
|
$0.370
|
$0.400
|
$0.320
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
65,520.000
|
$0.250
|
$0.290
|
$0.300
|
$0.320
|
$0.320
|
$0.530
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,120.000
|
$1.850
|
$1.500
|
$1.100
|
$0.750
|
$2.250
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
305.000
|
$0.800
|
$0.940
|
$0.970
|
$1.000
|
$1.000
|
$1.370
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
458.000
|
$9.450
|
$6.550
|
$6.750
|
$7.000
|
$7.500
|
$6.830
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$140.000
|
$125.000
|
$129.000
|
$125.000
|
$175.000
|
$183.750
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$175.000
|
$150.000
|
$155.000
|
$150.000
|
$200.000
|
$278.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,691.000
|
$0.200
|
$0.110
|
$0.115
|
$0.110
|
$0.260
|
$0.210
|
|
|
PAVEMENT SEALER 8"
|
LF
|
305.000
|
$0.450
|
$0.220
|
$0.230
|
$0.220
|
$0.520
|
$0.320
|
|
|
PAVEMENT SEALER 24"
|
LF
|
50.000
|
$1.750
|
$1.200
|
$1.250
|
$1.200
|
$2.000
|
$2.360
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$24.000
|
$22.000
|
$23.000
|
$22.000
|
$25.000
|
$21.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$35.000
|
$28.000
|
$29.000
|
$28.000
|
$35.000
|
$36.750
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
440.000
|
$0.450
|
$0.460
|
$0.470
|
$0.500
|
$1.000
|
$0.680
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
77,918.000
|
$0.350
|
$0.450
|
$0.460
|
$0.500
|
$0.470
|
$0.490
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,500.000
|
$0.450
|
$0.640
|
$0.660
|
$0.700
|
$0.750
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,480.000
|
$0.300
|
$0.520
|
$0.540
|
$0.550
|
$0.600
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
65,520.000
|
$0.350
|
$0.450
|
$0.460
|
$0.450
|
$0.470
|
$0.470
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
986.000
|
$2.900
|
$4.000
|
$4.150
|
$4.000
|
$4.000
|
$4.990
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
21.000
|
$3.900
|
$4.000
|
$4.150
|
$4.000
|
$5.000
|
$4.990
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,691.000
|
$0.500
|
$0.500
|
$0.520
|
$0.500
|
$2.030
|
$1.050
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
305.000
|
$0.900
|
$0.720
|
$0.740
|
$0.750
|
$4.060
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
50.000
|
$3.000
|
$3.050
|
$3.110
|
$3.100
|
$12.170
|
$4.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$50.000
|
$36.000
|
$37.000
|
$36.000
|
$109.530
|
$105.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$60.000
|
$42.000
|
$43.000
|
$42.000
|
$121.700
|
$105.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
3,691.000
|
$0.150
|
$0.050
|
$0.021
|
$0.030
|
$0.200
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
305.000
|
$0.350
|
$0.140
|
$0.073
|
$0.070
|
$0.400
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
50.000
|
$1.050
|
$0.460
|
$0.480
|
$0.500
|
$2.000
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$16.750
|
$11.250
|
$11.850
|
$12.000
|
$25.000
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$27.000
|
$13.250
|
$13.750
|
$15.000
|
$35.000
|
$21.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
21,280.000
|
$80.000
|
$94.500
|
$115.000
|
$135.000
|
$121.800
|
$130.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
15,395.000
|
$90.000
|
$98.000
|
$122.000
|
$123.000
|
$130.350
|
$150.000
|
|
|
TACK COAT
|
GAL
|
10,951.000
|
$3.000
|
$4.000
|
$3.500
|
$0.010
|
$4.750
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$17,600.000
|
$16,500.000
|
$20,000.000
|
$15,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
310.000
|
$250.000
|
$160.000
|
$320.000
|
$100.000
|
$150.000
|
$157.500
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
350.000
|
$100.000
|
$1.130
|
$42.000
|
$10.000
|
$150.000
|
$73.500
|
|
Totals: |
$7,966,089.170
|
$9,710,335.030
|
$9,724,303.357
|
$9,803,679.210
|
$10,706,173.270
|
$12,473,813.240
|