|
|
PREPARING ROW
|
STA
|
30.200
|
$4,000.000
|
$1,800.000
|
$1,000.000
|
$3,500.000
|
$3,000.000
|
$2,000.000
|
$5,450.500
|
$3,200.000
|
$11,000.000
|
$1,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(7"-10")
|
SY
|
2,357.000
|
$7.000
|
$5.500
|
$6.000
|
$5.000
|
$5.460
|
$8.000
|
$6.000
|
$9.000
|
$5.600
|
$17.000
|
|
|
REMOVING STAB BASE & ASPH PAV (6" - 8")
|
SY
|
1,354.000
|
$4.100
|
$4.470
|
$5.000
|
$4.500
|
$5.360
|
$6.000
|
$5.000
|
$9.000
|
$4.550
|
$17.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8.5")
|
SY
|
2,150.000
|
$11.000
|
$9.650
|
$11.000
|
$10.000
|
$4.940
|
$12.000
|
$10.000
|
$9.000
|
$9.850
|
$17.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,939.000
|
$10.000
|
$8.000
|
$10.000
|
$9.000
|
$11.430
|
$15.000
|
$4.000
|
$12.000
|
$10.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
8,141.000
|
$12.000
|
$10.000
|
$15.000
|
$12.000
|
$20.810
|
$20.000
|
$19.000
|
$12.000
|
$25.000
|
$30.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
2,034.000
|
$20.000
|
$15.000
|
$17.000
|
$21.000
|
$26.520
|
$15.000
|
$29.000
|
$16.000
|
$30.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
7.150
|
$800.000
|
$650.000
|
$650.000
|
$300.000
|
$700.400
|
$500.000
|
$500.000
|
$675.000
|
$420.000
|
$1,000.000
|
|
|
BLADING
|
STA
|
7.150
|
$250.000
|
$350.000
|
$500.000
|
$300.000
|
$119.480
|
$500.000
|
$350.000
|
$750.000
|
$735.000
|
$700.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
12,751.000
|
$1.270
|
$1.950
|
$3.000
|
$1.500
|
$2.540
|
$1.100
|
$4.000
|
$3.000
|
$1.000
|
$1.500
|
|
|
BLOCK SODDING
|
SY
|
667.000
|
$4.500
|
$5.000
|
$5.000
|
$4.200
|
$4.330
|
$6.000
|
$4.000
|
$5.000
|
$5.250
|
$7.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
11,751.000
|
$0.200
|
$0.410
|
$0.390
|
$0.180
|
$0.190
|
$0.450
|
$0.200
|
$1.500
|
$1.050
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
11,751.000
|
$0.200
|
$0.320
|
$0.300
|
$0.170
|
$0.180
|
$0.350
|
$0.200
|
$1.500
|
$0.250
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
1,913.000
|
$12.340
|
$5.000
|
$10.000
|
$44.000
|
$43.880
|
$1.000
|
$18.000
|
$15.000
|
$1.050
|
$37.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
8,748.000
|
$11.550
|
$17.500
|
$27.000
|
$10.500
|
$10.300
|
$40.000
|
$18.000
|
$29.000
|
$14.000
|
$42.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
489.000
|
$150.000
|
$20.000
|
$170.000
|
$165.000
|
$169.950
|
$200.000
|
$190.000
|
$200.000
|
$55.700
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
8,748.000
|
$6.000
|
$10.000
|
$7.000
|
$3.500
|
$4.940
|
$10.000
|
$7.000
|
$6.750
|
$9.450
|
$11.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
2,206.000
|
$3.440
|
$8.500
|
$11.000
|
$12.000
|
$12.360
|
$15.000
|
$4.500
|
$9.000
|
$14.000
|
$12.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
5,514.000
|
$3.130
|
$8.900
|
$5.000
|
$5.500
|
$5.670
|
$6.000
|
$6.000
|
$8.000
|
$5.900
|
$6.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
4,632.000
|
$3.340
|
$7.500
|
$7.000
|
$7.400
|
$7.620
|
$8.000
|
$7.000
|
$8.000
|
$7.900
|
$8.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
107.000
|
$200.000
|
$540.000
|
$500.000
|
$600.000
|
$618.000
|
$700.000
|
$350.000
|
$900.000
|
$640.000
|
$700.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
1,213.000
|
$85.000
|
$148.000
|
$128.000
|
$130.000
|
$133.900
|
$135.000
|
$135.000
|
$165.000
|
$144.000
|
$135.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,965.000
|
$2.070
|
$8.000
|
$9.000
|
$8.000
|
$6.180
|
$10.000
|
$8.000
|
$9.000
|
$8.250
|
$17.000
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
310.000
|
$1.660
|
$15.500
|
$8.000
|
$16.000
|
$10.300
|
$20.000
|
$16.000
|
$9.000
|
$16.000
|
$21.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,916.000
|
$24.000
|
$27.000
|
$35.000
|
$21.000
|
$18.000
|
$30.000
|
$30.000
|
$23.000
|
$25.000
|
$37.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,080.000
|
$135.000
|
$195.000
|
$175.000
|
$177.000
|
$200.000
|
$175.000
|
$270.000
|
$201.000
|
$211.000
|
$250.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
144.400
|
$930.000
|
$925.000
|
$927.000
|
$1,280.000
|
$1,150.000
|
$1,200.000
|
$1,050.000
|
$990.000
|
$1,800.000
|
$900.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
88.000
|
$950.000
|
$1,025.000
|
$1,176.000
|
$1,250.000
|
$1,150.000
|
$1,200.000
|
$1,050.000
|
$1,225.000
|
$1,400.000
|
$900.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
59.300
|
$850.000
|
$925.000
|
$983.000
|
$1,481.000
|
$1,150.000
|
$1,300.000
|
$1,050.000
|
$1,350.000
|
$1,300.000
|
$1,200.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
18,861.000
|
$16.000
|
$16.000
|
$19.000
|
$24.500
|
$21.000
|
$20.000
|
$21.000
|
$20.250
|
$30.000
|
$18.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
241.200
|
$450.000
|
$475.000
|
$400.000
|
$712.000
|
$500.000
|
$600.000
|
$550.000
|
$675.000
|
$525.000
|
$400.000
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
2,845.140
|
$200.000
|
$228.000
|
$251.000
|
$240.000
|
$195.000
|
$300.000
|
$280.000
|
$210.000
|
$285.000
|
$250.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
448.000
|
$100.000
|
$110.000
|
$100.000
|
$132.000
|
$120.000
|
$115.000
|
$130.000
|
$135.000
|
$99.000
|
$95.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,724.000
|
$100.000
|
$100.000
|
$100.000
|
$119.000
|
$135.000
|
$120.000
|
$120.000
|
$140.000
|
$104.000
|
$110.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$451.220
|
$475.000
|
$400.000
|
$700.000
|
$500.000
|
$550.000
|
$800.000
|
$450.000
|
$525.000
|
$300.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
940.000
|
$110.000
|
$105.000
|
$100.000
|
$129.000
|
$100.000
|
$100.000
|
$140.000
|
$115.000
|
$150.000
|
$45.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
275.500
|
$91.610
|
$90.000
|
$100.000
|
$91.000
|
$90.000
|
$75.000
|
$75.000
|
$95.000
|
$50.000
|
$66.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
46.000
|
$54.470
|
$91.000
|
$45.000
|
$83.000
|
$100.000
|
$60.000
|
$100.000
|
$45.000
|
$63.000
|
$66.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
26.000
|
$66.850
|
$99.000
|
$65.000
|
$118.000
|
$110.000
|
$80.000
|
$140.000
|
$60.000
|
$94.500
|
$77.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$741.860
|
$1,000.000
|
$600.000
|
$1,472.000
|
$1,500.000
|
$600.000
|
$1,000.000
|
$850.000
|
$735.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,092.200
|
$1,200.000
|
$1,200.000
|
$1,900.000
|
$2,000.000
|
$800.000
|
$1,400.000
|
$1,000.000
|
$1,050.000
|
$1,600.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
4.000
|
$1,214.600
|
$1,000.000
|
$500.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
$900.000
|
$5,500.000
|
$735.000
|
$600.000
|
|
|
REMOV STR (PIPE)
|
LF
|
60.000
|
$20.400
|
$14.050
|
$10.000
|
$23.000
|
$25.000
|
$40.000
|
$20.000
|
$210.000
|
$10.500
|
$30.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$25,000.000
|
$18,000.000
|
$20,000.000
|
$20,000.000
|
$22,500.000
|
$40,000.000
|
$30,000.000
|
$25,000.000
|
$17,500.000
|
$50,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$50,000.000
|
$25,000.000
|
$60,000.000
|
$33,000.000
|
$30,000.000
|
$80,000.000
|
$40,000.000
|
$42,500.000
|
$25,000.000
|
$70,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$336,195.340
|
$379,500.000
|
$200,000.000
|
$267,500.000
|
$452,000.000
|
$400,000.000
|
$510,000.000
|
$485,000.000
|
$495,102.370
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$5,000.000
|
$2,000.000
|
$1,250.000
|
$1,040.000
|
$1,490.930
|
$1,000.000
|
$3,900.000
|
$4,500.000
|
$15,750.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
135.000
|
$25.910
|
$26.500
|
$25.000
|
$21.000
|
$21.630
|
$10.000
|
$35.000
|
$40.000
|
$22.500
|
$77.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
135.000
|
$8.420
|
$11.000
|
$10.000
|
$8.000
|
$8.240
|
$10.000
|
$8.000
|
$12.000
|
$8.500
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,221.000
|
$19.380
|
$21.000
|
$20.000
|
$19.250
|
$19.830
|
$1.000
|
$25.000
|
$28.000
|
$20.500
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,221.000
|
$7.680
|
$9.000
|
$10.000
|
$8.000
|
$8.240
|
$1.000
|
$8.000
|
$10.000
|
$8.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,900.000
|
$2.380
|
$2.650
|
$2.550
|
$1.620
|
$3.000
|
$2.000
|
$2.700
|
$3.000
|
$1.750
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,900.000
|
$0.640
|
$0.540
|
$0.500
|
$0.500
|
$1.000
|
$1.000
|
$0.600
|
$1.000
|
$0.550
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
712.000
|
$80.000
|
$100.000
|
$85.000
|
$130.000
|
$135.000
|
$115.000
|
$110.000
|
$148.000
|
$85.000
|
$200.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
20.000
|
$5,000.000
|
$3,000.000
|
$6,000.000
|
$7,000.000
|
$4,500.000
|
$3,000.000
|
$7,900.000
|
$5,500.000
|
$5,500.000
|
$4,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,520.000
|
$20.000
|
$39.000
|
$120.000
|
$35.000
|
$50.000
|
$70.000
|
$50.000
|
$85.000
|
$13.650
|
$77.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,130.000
|
$5.560
|
$9.000
|
$15.000
|
$8.000
|
$12.000
|
$10.000
|
$7.000
|
$25.000
|
$13.650
|
$7.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,520.000
|
$8.070
|
$15.000
|
$15.000
|
$10.000
|
$15.000
|
$15.000
|
$8.000
|
$28.000
|
$4.200
|
$11.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
213.000
|
$36.410
|
$60.000
|
$45.000
|
$50.000
|
$55.000
|
$60.000
|
$40.000
|
$52.000
|
$53.250
|
$70.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
337.500
|
$19.860
|
$22.000
|
$21.000
|
$21.000
|
$19.660
|
$26.000
|
$25.000
|
$30.000
|
$20.330
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,652.700
|
$1,600.000
|
$1,550.000
|
$1,550.000
|
$1,493.500
|
$1,600.000
|
$1,700.000
|
$1,800.000
|
$1,796.450
|
$16,000.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$11.700
|
$17.000
|
$15.000
|
$15.000
|
$19.660
|
$25.000
|
$9.000
|
$55.000
|
$20.330
|
$15.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$30.700
|
$48.000
|
$45.000
|
$45.000
|
$21.830
|
$60.000
|
$55.000
|
$55.000
|
$22.570
|
$45.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$727.600
|
$1,109.000
|
$1,000.000
|
$1,000.000
|
$643.750
|
$1,200.000
|
$950.000
|
$1,800.000
|
$665.630
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$2.510
|
$2.180
|
$2.000
|
$2.000
|
$4.120
|
$20.000
|
$4.000
|
$4.000
|
$4.260
|
$7.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$188.590
|
$213.000
|
$250.000
|
$200.000
|
$154.500
|
$200.000
|
$250.000
|
$400.000
|
$159.750
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,288.980
|
$2,600.000
|
$2,465.000
|
$2,500.000
|
$2,600.750
|
$2,500.000
|
$3,000.000
|
$2,850.000
|
$2,689.130
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,685.200
|
$2,090.000
|
$795.000
|
$875.000
|
$1,000.000
|
$800.000
|
$1,300.000
|
$2,800.000
|
$3,150.000
|
$12,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$796.990
|
$839.010
|
$500.000
|
$550.000
|
$1,250.000
|
$700.000
|
$700.000
|
$2,800.000
|
$315.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$8,000.000
|
$8,800.000
|
$5,000.000
|
$4,600.000
|
$6,750.000
|
$6,500.000
|
$9,500.000
|
$12,500.000
|
$7,350.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$500.160
|
$470.000
|
$630.000
|
$500.000
|
$468.650
|
$500.000
|
$500.000
|
$800.000
|
$436.650
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$554.640
|
$600.000
|
$525.000
|
$645.000
|
$602.550
|
$600.000
|
$600.000
|
$800.000
|
$559.130
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$497.510
|
$798.990
|
$700.000
|
$835.000
|
$471.740
|
$800.000
|
$800.000
|
$800.000
|
$718.880
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$783.680
|
$1,015.000
|
$950.000
|
$1,042.000
|
$973.350
|
$1,000.000
|
$1,000.000
|
$800.000
|
$798.750
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$35.740
|
$19.000
|
$28.000
|
$15.000
|
$29.870
|
$30.000
|
$17.000
|
$28.000
|
$30.890
|
$33.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$36.020
|
$26.000
|
$45.000
|
$20.000
|
$35.020
|
$50.000
|
$23.310
|
$28.000
|
$36.210
|
$33.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,746.000
|
$1.000
|
$2.100
|
$2.000
|
$2.000
|
$2.200
|
$2.000
|
$3.000
|
$1.000
|
$2.130
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
6,964.000
|
$1.000
|
$1.050
|
$1.000
|
$1.000
|
$1.100
|
$1.500
|
$1.000
|
$1.000
|
$1.070
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
70.000
|
$9.000
|
$13.000
|
$12.000
|
$12.000
|
$13.200
|
$15.000
|
$16.000
|
$6.000
|
$12.780
|
$13.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
24,024.000
|
$1.000
|
$0.830
|
$0.800
|
$0.800
|
$0.880
|
$0.850
|
$1.000
|
$1.000
|
$0.850
|
$3.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
1,084.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
$1.070
|
$2.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,084.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
$1.070
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,697.000
|
$0.500
|
$0.630
|
$0.600
|
$0.600
|
$0.660
|
$0.650
|
$0.600
|
$1.000
|
$0.640
|
$0.660
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
420.000
|
$0.500
|
$1.190
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$2.700
|
$2.000
|
$1.070
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,540.000
|
$0.500
|
$0.520
|
$0.500
|
$0.500
|
$0.550
|
$0.550
|
$0.600
|
$1.000
|
$0.530
|
$0.550
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
400.000
|
$2.730
|
$4.300
|
$1.000
|
$4.000
|
$4.400
|
$4.000
|
$7.000
|
$5.000
|
$4.260
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
31,809.000
|
$0.340
|
$0.500
|
$0.480
|
$0.480
|
$0.530
|
$0.500
|
$0.700
|
$1.000
|
$0.510
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
36,493.000
|
$0.150
|
$0.110
|
$0.100
|
$0.100
|
$0.110
|
$0.110
|
$0.300
|
$0.500
|
$0.110
|
$1.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
8.000
|
$145.290
|
$440.000
|
$500.000
|
$220.000
|
$500.000
|
$1,000.000
|
$200.000
|
$1,500.000
|
$211.000
|
$440.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$6,500.000
|
$5,000.000
|
$8,800.000
|
$12,500.000
|
$4,500.000
|
$8,900.000
|
$15,000.000
|
$15,000.000
|
$7,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$527.570
|
$13,500.000
|
$15,000.000
|
$8,800.000
|
$2,500.000
|
$3,000.000
|
$4,900.000
|
$30,000.000
|
$4,500.000
|
$9,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$13.090
|
$19.990
|
$50.000
|
$15.000
|
$50.000
|
$15.000
|
$50.000
|
$225.000
|
$95.000
|
$100.000
|
|
Totals: |
$3,802,424.415
|
$4,119,000.000
|
$4,429,686.050
|
$4,466,357.620
|
$4,523,569.012
|
$5,042,560.380
|
$5,183,024.120
|
$5,396,864.400
|
$5,539,309.995
|
$5,687,553.420
|