|
|
PREPARING ROW
|
STA
|
114.850
|
$750.000
|
$400.000
|
$675.000
|
$2,400.000
|
$1,605.000
|
$1,321.760
|
$1,100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
353.000
|
$12.850
|
$25.000
|
$14.500
|
$21.000
|
$30.000
|
$11.860
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,191.000
|
$12.000
|
$11.000
|
$11.000
|
$15.750
|
$18.000
|
$8.080
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,849.000
|
$12.000
|
$11.000
|
$18.250
|
$21.000
|
$16.000
|
$12.790
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
114.850
|
$180.000
|
$120.000
|
$214.000
|
$157.500
|
$265.000
|
$200.030
|
$250.000
|
|
|
BLADING
|
STA
|
114.850
|
$83.000
|
$120.000
|
$125.000
|
$315.000
|
$225.000
|
$175.540
|
$250.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
25,522.000
|
$0.350
|
$0.300
|
$0.250
|
$0.330
|
$0.430
|
$0.520
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
25,522.000
|
$0.140
|
$0.100
|
$0.090
|
$0.010
|
$0.400
|
$0.200
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
3,363.000
|
$10.000
|
$1.000
|
$30.000
|
$1.050
|
$2.000
|
$18.560
|
$15.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
2,500.000
|
$23.500
|
$27.000
|
$31.250
|
$18.900
|
$30.000
|
$33.440
|
$35.000
|
|
|
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
|
SY
|
37,010.000
|
$14.000
|
$14.000
|
$14.800
|
$12.600
|
$16.000
|
$13.390
|
$15.000
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
28,072.000
|
$3.000
|
$2.500
|
$2.940
|
$2.520
|
$2.000
|
$2.340
|
$6.000
|
|
|
CEMENT
|
TON
|
191.000
|
$165.000
|
$155.000
|
$140.000
|
$168.000
|
$180.000
|
$138.590
|
$180.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
38,283.000
|
$2.250
|
$2.600
|
$1.800
|
$1.260
|
$1.750
|
$2.920
|
$4.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
7,399.000
|
$4.000
|
$3.000
|
$3.000
|
$6.300
|
$8.000
|
$2.690
|
$4.000
|
|
|
ASPH (AC-15P)
|
GAL
|
7,772.000
|
$3.500
|
$3.900
|
$3.530
|
$3.500
|
$3.350
|
$2.160
|
$6.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
9,254.000
|
$3.500
|
$2.500
|
$3.680
|
$3.650
|
$3.500
|
$2.720
|
$6.000
|
|
|
AGGR (TY-B GR-3)
|
CY
|
354.000
|
$135.000
|
$93.000
|
$168.420
|
$168.000
|
$160.000
|
$1,147.570
|
$300.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
3,933.000
|
$80.000
|
$77.000
|
$75.500
|
$75.010
|
$80.000
|
$94.940
|
$101.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
28,072.000
|
$3.000
|
$2.000
|
$2.470
|
$2.520
|
$1.750
|
$2.280
|
$6.000
|
|
|
CEM STABIL BKFL
|
CY
|
81.000
|
$130.000
|
$220.000
|
$236.840
|
$157.500
|
$225.000
|
$143.860
|
$350.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
85.000
|
$83.000
|
$230.000
|
$57.890
|
$105.000
|
$125.000
|
$274.470
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
89.000
|
$1.500
|
$13.000
|
$21.050
|
$10.500
|
$20.000
|
$15.990
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,483.000
|
$30.000
|
$48.500
|
$33.680
|
$21.000
|
$45.000
|
$15.010
|
$30.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
122.000
|
$330.000
|
$110.000
|
$212.000
|
$262.500
|
$275.000
|
$226.320
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$435.000
|
$550.000
|
$526.300
|
$525.000
|
$650.000
|
$412.510
|
$550.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
54.000
|
$155.000
|
$430.000
|
$294.730
|
$420.000
|
$350.000
|
$327.430
|
$450.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
28.000
|
$700.000
|
$600.000
|
$673.670
|
$1,785.000
|
$640.000
|
$802.540
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
10.000
|
$712.000
|
$860.000
|
$826.290
|
$3,150.000
|
$785.000
|
$1,477.850
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
20.000
|
$800.000
|
$1,000.000
|
$952.610
|
$2,520.000
|
$905.000
|
$1,412.960
|
$1,400.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
148.000
|
$51.000
|
$65.000
|
$63.160
|
$63.000
|
$60.000
|
$82.380
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
108.000
|
$80.000
|
$160.000
|
$121.050
|
$105.000
|
$115.000
|
$142.530
|
$105.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
58.000
|
$70.000
|
$140.000
|
$110.520
|
$94.500
|
$105.000
|
$156.960
|
$95.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
54.000
|
$90.000
|
$190.000
|
$142.100
|
$126.000
|
$135.000
|
$215.180
|
$125.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
4.000
|
$4,100.000
|
$6,000.000
|
$3,157.810
|
$5,250.000
|
$3,500.000
|
$6,805.670
|
$4,500.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$6,700.000
|
$3,000.000
|
$3,684.110
|
$7,350.000
|
$4,500.000
|
$9,991.080
|
$6,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$13,800.000
|
$12,000.000
|
$15,262.730
|
$11,550.000
|
$15,000.000
|
$13,854.540
|
$9,500.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$16,900.000
|
$15,000.000
|
$19,999.440
|
$15,750.000
|
$20,000.000
|
$18,530.010
|
$12,500.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$23,000.000
|
$25,000.000
|
$31,578.070
|
$21,000.000
|
$32,000.000
|
$25,200.070
|
$18,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$700.000
|
$870.000
|
$1,052.600
|
$630.000
|
$1,000.000
|
$1,866.060
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,150.000
|
$1,000.000
|
$1,263.130
|
$840.000
|
$1,200.000
|
$1,964.710
|
$2,250.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$2,800.000
|
$3,157.810
|
$840.000
|
$3,000.000
|
$2,739.900
|
$3,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,400.000
|
$2,500.000
|
$2,631.510
|
$2,520.000
|
$2,500.000
|
$3,179.640
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$750.000
|
$900.000
|
$526.300
|
$315.000
|
$500.000
|
$1,447.030
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$360.000
|
$900.000
|
$526.300
|
$315.000
|
$500.000
|
$845.040
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
6.000
|
$1,000.000
|
$1,300.000
|
$1,052.600
|
$945.000
|
$1,000.000
|
$1,340.410
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
344.000
|
$15.000
|
$22.000
|
$12.630
|
$13.650
|
$12.000
|
$17.720
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$217,000.000
|
$230,000.000
|
$256,000.000
|
$261,000.000
|
$288,000.000
|
$275,365.960
|
$310,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$6,000.000
|
$14,000.000
|
$4,000.000
|
$21,000.000
|
$8,500.000
|
$13,793.640
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
280.000
|
$27.000
|
$25.000
|
$26.260
|
$26.250
|
$28.680
|
$63.180
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
280.000
|
$8.500
|
$7.000
|
$10.530
|
$13.130
|
$8.790
|
$18.580
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$21.500
|
$5.000
|
$19.570
|
$21.000
|
$24.790
|
$48.400
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.500
|
$1.000
|
$9.740
|
$10.500
|
$8.790
|
$18.370
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,124.000
|
$3.500
|
$3.000
|
$2.000
|
$1.520
|
$2.880
|
$5.180
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,124.000
|
$0.800
|
$1.000
|
$0.890
|
$0.110
|
$0.650
|
$1.450
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
590.000
|
$3.900
|
$7.000
|
$3.320
|
$4.150
|
$4.700
|
$7.430
|
$16.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
590.000
|
$0.800
|
$3.000
|
$0.530
|
$1.050
|
$1.340
|
$1.820
|
$12.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
364.000
|
$80.000
|
$130.000
|
$72.000
|
$84.000
|
$100.000
|
$115.360
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,056.000
|
$27.000
|
$34.000
|
$35.500
|
$52.500
|
$45.000
|
$49.700
|
$45.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$19.000
|
$21.000
|
$25.020
|
$19.530
|
$18.600
|
$45.250
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$22.000
|
$21.000
|
$25.260
|
$21.160
|
$20.150
|
$49.650
|
$45.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,430.000
|
$2,400.000
|
$3,263.070
|
$2,651.250
|
$2,525.000
|
$4,204.990
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
6.000
|
$300.000
|
$290.000
|
$242.100
|
$236.250
|
$230.000
|
$594.910
|
$650.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$320.000
|
$289.470
|
$252.000
|
$275.000
|
$649.060
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
45.000
|
$420.000
|
$390.000
|
$510.510
|
$483.000
|
$485.000
|
$594.390
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$610.000
|
$460.000
|
$599.980
|
$556.500
|
$570.000
|
$643.360
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$750.000
|
$600.000
|
$863.140
|
$829.500
|
$820.000
|
$846.350
|
$650.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
18.000
|
$58.000
|
$110.000
|
$63.160
|
$47.250
|
$60.000
|
$107.070
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
8.000
|
$35.000
|
$28.000
|
$31.580
|
$29.400
|
$30.000
|
$36.980
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,261.000
|
$0.400
|
$0.500
|
$0.470
|
$0.470
|
$0.450
|
$0.620
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,531.000
|
$0.850
|
$0.500
|
$0.790
|
$1.250
|
$1.000
|
$3.870
|
$5.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
63.000
|
$1.750
|
$2.200
|
$2.110
|
$2.100
|
$2.000
|
$4.050
|
$8.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
48.000
|
$0.900
|
$3.000
|
$23.680
|
$2.630
|
$2.500
|
$2.610
|
$12.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
185.000
|
$3.200
|
$4.350
|
$4.210
|
$4.200
|
$4.000
|
$8.860
|
$8.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
113.000
|
$5.000
|
$9.000
|
$7.890
|
$7.880
|
$7.500
|
$18.550
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
22,996.000
|
$0.400
|
$0.500
|
$0.470
|
$0.470
|
$0.450
|
$0.950
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,471.000
|
$0.400
|
$0.500
|
$0.490
|
$0.490
|
$0.470
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,896.000
|
$0.400
|
$0.500
|
$0.470
|
$0.470
|
$0.450
|
$1.140
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
276.000
|
$2.900
|
$4.350
|
$4.210
|
$4.200
|
$4.000
|
$10.560
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$5,500.000
|
$16,500.000
|
$11,550.000
|
$20,000.000
|
$7,449.950
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$9,500.000
|
$15,000.000
|
$30,000.000
|
$11,550.000
|
$50,000.000
|
$15,408.190
|
$15,000.000
|
|
Totals: |
$2,387,880.130
|
$2,436,804.350
|
$2,598,241.200
|
$2,759,645.545
|
$2,888,712.580
|
$3,180,187.940
|
$3,334,466.000
|