PREPARING ROW
|
STA
|
47.430
|
$13,000.000
|
$9,000.000
|
$7,499.980
|
$14,680.000
|
$6,800.000
|
$12,061.000
|
$9,450.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
2,837.000
|
$30.000
|
$10.000
|
$18.000
|
$10.000
|
$11.190
|
$5.000
|
$15.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
595.000
|
$50.000
|
$25.000
|
$13.000
|
$19.000
|
$27.990
|
$9.000
|
$15.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
703.000
|
$50.000
|
$25.000
|
$10.000
|
$3.600
|
$18.660
|
$6.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
5,066.000
|
$15.000
|
$10.000
|
$3.900
|
$6.500
|
$5.600
|
$5.000
|
$7.000
|
|
|
REMOVING STAB BASE & ASPH PAV(13"-18")
|
SY
|
10,944.000
|
$15.000
|
$21.000
|
$11.000
|
$15.500
|
$8.400
|
$14.000
|
$16.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,324.000
|
$30.000
|
$20.000
|
$15.000
|
$20.000
|
$16.790
|
$30.000
|
$22.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
31,077.000
|
$25.000
|
$7.000
|
$21.000
|
$22.000
|
$27.050
|
$50.000
|
$33.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
1,889.000
|
$45.000
|
$28.000
|
$35.000
|
$45.000
|
$42.910
|
$40.000
|
$44.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
49,011.000
|
$3.000
|
$2.000
|
$1.500
|
$2.380
|
$6.810
|
$2.000
|
$1.160
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
49,011.000
|
$0.250
|
$1.000
|
$0.350
|
$0.190
|
$0.290
|
$0.350
|
$0.180
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
61,264.000
|
$1.000
|
$1.000
|
$0.350
|
$0.160
|
$0.250
|
$0.340
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
18,227.000
|
$12.000
|
$12.000
|
$18.000
|
$1.000
|
$19.320
|
$6.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
20,916.000
|
$23.000
|
$18.000
|
$17.000
|
$20.000
|
$17.730
|
$30.000
|
$27.500
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
20,916.000
|
$9.000
|
$8.000
|
$6.000
|
$12.000
|
$7.650
|
$14.000
|
$7.500
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
589.000
|
$310.000
|
$371.000
|
$325.000
|
$340.000
|
$389.990
|
$403.000
|
$400.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
4,184.000
|
$10.000
|
$8.000
|
$8.000
|
$8.700
|
$12.130
|
$7.950
|
$8.350
|
|
|
CEM STABIL BKFL
|
CY
|
348.000
|
$200.000
|
$194.000
|
$250.000
|
$245.000
|
$212.720
|
$250.000
|
$525.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
67.000
|
$30.000
|
$5.000
|
$44.000
|
$10.000
|
$18.660
|
$1.000
|
$42.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,689.000
|
$45.000
|
$90.000
|
$44.000
|
$47.000
|
$33.590
|
$12.000
|
$73.500
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
120.000
|
$150.000
|
$250.000
|
$160.000
|
$276.000
|
$173.810
|
$137.000
|
$175.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,768.000
|
$300.000
|
$400.000
|
$250.000
|
$300.000
|
$280.000
|
$215.000
|
$350.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
174.900
|
$1,400.000
|
$1,600.000
|
$800.000
|
$1,746.000
|
$1,306.170
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
129.000
|
$1,650.000
|
$1,800.000
|
$1,200.000
|
$1,599.000
|
$1,726.020
|
$1,700.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
53.400
|
$1,800.000
|
$2,000.000
|
$1,350.000
|
$2,070.000
|
$1,539.420
|
$2,000.000
|
$2,500.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
23,230.000
|
$25.000
|
$35.000
|
$23.000
|
$31.600
|
$27.990
|
$30.000
|
$28.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
360.000
|
$750.000
|
$682.000
|
$700.000
|
$738.000
|
$671.750
|
$700.000
|
$400.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,571.870
|
$250.000
|
$240.000
|
$220.000
|
$274.000
|
$239.590
|
$250.000
|
$250.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,430.280
|
$300.000
|
$256.000
|
$220.000
|
$293.000
|
$241.830
|
$230.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
22.000
|
$550.000
|
$964.000
|
$555.000
|
$593.000
|
$559.790
|
$800.000
|
$1,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
252.000
|
$225.000
|
$201.000
|
$190.000
|
$343.000
|
$167.940
|
$140.000
|
$215.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
932.000
|
$200.000
|
$156.000
|
$180.000
|
$289.000
|
$177.270
|
$240.000
|
$195.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
720.000
|
$225.000
|
$122.000
|
$180.000
|
$274.000
|
$186.600
|
$180.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
130.000
|
$700.000
|
$738.000
|
$650.000
|
$945.000
|
$387.190
|
$837.000
|
$1,000.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
1,164.100
|
$175.000
|
$119.000
|
$150.000
|
$231.000
|
$163.270
|
$180.000
|
$189.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
288.000
|
$160.000
|
$136.000
|
$140.000
|
$146.000
|
$167.000
|
$170.000
|
$125.000
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
104.000
|
$1,700.000
|
$835.000
|
$880.000
|
$1,000.000
|
$1,586.070
|
$900.000
|
$945.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
192.000
|
$165.000
|
$125.000
|
$95.000
|
$122.000
|
$117.560
|
$120.000
|
$105.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$24,000.000
|
$53,381.000
|
$45,000.000
|
$76,000.000
|
$44,783.140
|
$60,000.000
|
$63,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$1,831.000
|
$3,000.000
|
$3,000.000
|
$2,071.220
|
$2,500.000
|
$1,365.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$550.000
|
$408.000
|
$900.000
|
$600.000
|
$1,026.280
|
$450.000
|
$525.000
|
|
|
REMOV STR (PIPE)
|
LF
|
240.000
|
$35.000
|
$13.000
|
$25.000
|
$33.000
|
$27.990
|
$30.000
|
$31.500
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
66.000
|
$230.000
|
$371.000
|
$120.000
|
$160.000
|
$90.500
|
$200.000
|
$210.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$80,000.000
|
$35,000.000
|
$37,000.000
|
$55,000.000
|
$37,320.000
|
$50,000.000
|
$84,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,011,587.000
|
$396,264.420
|
$980,000.000
|
$500,000.000
|
$1,150,000.000
|
$1,135,000.000
|
$1,175,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$15,000.000
|
$8,921.000
|
$19,000.000
|
$4,666.000
|
$9,062.340
|
$8,000.000
|
$26,250.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,199.000
|
$40.000
|
$50.000
|
$35.000
|
$35.730
|
$55.980
|
$32.000
|
$31.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,199.000
|
$15.000
|
$10.000
|
$13.500
|
$13.400
|
$11.200
|
$12.000
|
$15.750
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
840.000
|
$30.000
|
$15.000
|
$35.000
|
$36.850
|
$16.790
|
$33.000
|
$52.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
840.000
|
$15.000
|
$5.000
|
$12.500
|
$12.280
|
$7.460
|
$11.000
|
$31.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,141.000
|
$4.000
|
$4.000
|
$3.400
|
$3.350
|
$4.660
|
$4.310
|
$2.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,141.000
|
$1.000
|
$1.000
|
$1.000
|
$1.120
|
$1.210
|
$1.000
|
$1.050
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,539.500
|
$120.000
|
$95.000
|
$135.000
|
$145.000
|
$121.290
|
$84.000
|
$110.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
22.000
|
$5,000.000
|
$3,077.000
|
$2,850.000
|
$3,000.000
|
$3,664.070
|
$3,500.000
|
$6,300.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,790.000
|
$50.000
|
$18.000
|
$45.000
|
$65.000
|
$41.230
|
$18.000
|
$31.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$40.000
|
$54.000
|
$55.000
|
$87.000
|
$93.300
|
$18.000
|
$52.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$40.000
|
$61.000
|
$60.000
|
$91.000
|
$93.300
|
$18.000
|
$84.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,890.000
|
$8.000
|
$2.000
|
$8.000
|
$7.000
|
$17.000
|
$10.000
|
$15.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
420.000
|
$10.000
|
$15.000
|
$9.000
|
$10.000
|
$15.860
|
$8.000
|
$31.500
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$81.000
|
$9.000
|
$11.000
|
$15.860
|
$8.000
|
$42.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,790.000
|
$12.000
|
$1.520
|
$14.000
|
$8.000
|
$16.800
|
$11.000
|
$15.750
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$10.000
|
$11.000
|
$12.000
|
$10.000
|
$15.860
|
$11.000
|
$31.500
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$10.000
|
$9.000
|
$14.000
|
$12.000
|
$15.860
|
$11.000
|
$42.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
1,615.000
|
$70.000
|
$104.000
|
$125.000
|
$85.160
|
$139.950
|
$69.000
|
$89.250
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
7,402.000
|
$1.000
|
$0.500
|
$0.900
|
$1.380
|
$1.210
|
$0.200
|
$2.710
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
3,701.000
|
$1.000
|
$0.500
|
$0.900
|
$3.500
|
$1.460
|
$0.300
|
$1.070
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
23.000
|
$138.000
|
$399.000
|
$420.000
|
$525.000
|
$462.760
|
$399.000
|
$418.950
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,875.000
|
$40.000
|
$25.000
|
$26.000
|
$29.930
|
$22.390
|
$28.500
|
$29.930
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$2,250.000
|
$2,235.000
|
$2,300.000
|
$2,310.000
|
$3,172.140
|
$2,675.030
|
$3,204.050
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,250.000
|
$20.000
|
$2.000
|
$2.500
|
$2.630
|
$4.660
|
$2.500
|
$2.630
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
16.000
|
$320.000
|
$185.000
|
$190.000
|
$157.500
|
$1,492.770
|
$250.000
|
$157.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$3,250.000
|
$3,000.000
|
$3,100.000
|
$3,018.750
|
$3,577.990
|
$2,950.000
|
$3,018.750
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$425.000
|
$225.000
|
$230.000
|
$262.500
|
$279.890
|
$250.000
|
$262.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
16.000
|
$2,000.000
|
$1,340.000
|
$1,100.000
|
$1,407.000
|
$1,212.880
|
$1,154.550
|
$2,625.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,200.000
|
$955.000
|
$800.000
|
$1,003.000
|
$886.330
|
$800.000
|
$1,050.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$10,000.000
|
$6,265.000
|
$7,800.000
|
$8,279.000
|
$11,662.280
|
$9,100.000
|
$11,550.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
125.000
|
$50.000
|
$150.000
|
$52.000
|
$21.000
|
$186.600
|
$45.000
|
$157.500
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$315.000
|
$390.000
|
$315.000
|
$466.490
|
$315.000
|
$330.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$900.000
|
$629.000
|
$700.000
|
$781.200
|
$709.070
|
$629.000
|
$660.450
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$950.000
|
$699.000
|
$750.000
|
$875.700
|
$783.700
|
$699.000
|
$733.950
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
|
EA
|
2.000
|
$1,000.000
|
$895.000
|
$1,000.000
|
$1,209.600
|
$1,007.620
|
$895.000
|
$939.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,250.000
|
$1,098.000
|
$1,100.000
|
$1,310.400
|
$1,231.540
|
$1,098.000
|
$1,152.900
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
3.000
|
$1,400.000
|
$1,269.000
|
$1,300.000
|
$1,549.800
|
$1,427.460
|
$1,269.000
|
$1,332.450
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$45.000
|
$20.000
|
$22.000
|
$18.900
|
$24.260
|
$21.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
42.000
|
$30.000
|
$25.000
|
$27.000
|
$18.900
|
$27.990
|
$22.000
|
$21.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
41,975.000
|
$1.000
|
$1.450
|
$1.100
|
$1.170
|
$1.030
|
$1.050
|
$1.520
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
416.000
|
$10.000
|
$13.000
|
$6.500
|
$7.000
|
$5.600
|
$6.000
|
$13.650
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
27,198.000
|
$1.000
|
$1.450
|
$1.100
|
$1.170
|
$1.030
|
$1.050
|
$1.520
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
92.000
|
$10.000
|
$18.000
|
$7.000
|
$7.950
|
$6.530
|
$7.500
|
$18.640
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
255.000
|
$0.500
|
$5.000
|
$2.800
|
$2.990
|
$2.330
|
$1.000
|
$5.250
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,860.000
|
$0.400
|
$1.000
|
$1.600
|
$1.820
|
$1.400
|
$0.270
|
$1.050
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
11,621.000
|
$1.200
|
$1.230
|
$1.300
|
$1.400
|
$1.070
|
$0.750
|
$1.290
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
12,164.000
|
$1.000
|
$1.230
|
$1.300
|
$1.400
|
$1.070
|
$0.750
|
$1.290
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
147.000
|
$7.000
|
$28.000
|
$5.500
|
$5.840
|
$4.660
|
$5.000
|
$28.880
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,498.000
|
$1.000
|
$2.000
|
$0.400
|
$0.440
|
$0.470
|
$0.550
|
$6.300
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
20.000
|
$5.000
|
$28.000
|
$2.800
|
$2.920
|
$2.330
|
$5.000
|
$105.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
12.000
|
$110.000
|
$3,000.000
|
$3,500.000
|
$4,300.000
|
$3,358.740
|
$2,801.650
|
$4,200.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
4,548.000
|
$150.000
|
$160.000
|
$177.000
|
$204.750
|
$187.360
|
$156.650
|
$165.000
|
|
|
TACK COAT
|
GAL
|
1,232.000
|
$4.000
|
$14.000
|
$15.000
|
$8.400
|
$2.430
|
$14.000
|
$14.000
|
|
|
ASBESTOS ABATEMENT (OTHER)
|
SF
|
218.000
|
$150.000
|
$80.000
|
$82.000
|
$86.500
|
$116.620
|
$31.650
|
$126.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$100.000
|
$100.000
|
$216.000
|
$100.000
|
$79.300
|
$42.000
|
$126.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$100.000
|
$116.000
|
$220.000
|
$150.000
|
$93.300
|
$150.000
|
$126.000
|
|
Totals: |
$11,431,172.450
|
$9,581,000.000
|
$9,889,005.801
|
$10,976,559.890
|
$10,994,900.529
|
$11,455,064.870
|
$11,921,352.620
|