PREPARING ROW
|
STA
|
13.600
|
$12,000.000
|
$2,900.000
|
$28,835.580
|
$26,143.840
|
$8,200.000
|
$7,200.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
306.000
|
$8.000
|
$20.000
|
$7.000
|
$6.930
|
$17.000
|
$24.000
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
4,371.000
|
$13.000
|
$15.000
|
$15.000
|
$12.540
|
$20.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,102.000
|
$20.000
|
$16.000
|
$10.000
|
$15.550
|
$32.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,717.000
|
$25.000
|
$23.000
|
$10.000
|
$65.000
|
$45.000
|
$28.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
9,723.000
|
$2.000
|
$1.500
|
$3.250
|
$2.970
|
$1.000
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
9,723.000
|
$5.000
|
$4.800
|
$5.000
|
$5.070
|
$6.000
|
$5.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
9,723.000
|
$0.150
|
$0.300
|
$0.300
|
$0.320
|
$0.500
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
2,892.000
|
$12.000
|
$18.000
|
$1.000
|
$0.010
|
$61.000
|
$20.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
|
SY
|
5,495.000
|
$30.000
|
$29.000
|
$28.000
|
$45.000
|
$60.000
|
$70.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
1,099.000
|
$5.500
|
$9.000
|
$8.500
|
$8.570
|
$6.500
|
$7.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
224.000
|
$7.000
|
$14.000
|
$13.200
|
$13.300
|
$6.500
|
$5.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
2,244.000
|
$8.000
|
$9.000
|
$7.400
|
$7.460
|
$6.500
|
$6.500
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
50.900
|
$400.000
|
$480.000
|
$500.000
|
$478.660
|
$260.000
|
$200.000
|
|
|
CEM STABIL BKFL
|
CY
|
559.000
|
$325.000
|
$268.000
|
$225.000
|
$199.000
|
$51.000
|
$260.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,665.000
|
$40.000
|
$36.000
|
$40.000
|
$41.830
|
$38.000
|
$70.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
404.000
|
$360.000
|
$220.000
|
$210.000
|
$300.000
|
$770.000
|
$282.500
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
55.800
|
$1,600.000
|
$950.000
|
$2,000.000
|
$1,534.420
|
$4,000.000
|
$1,827.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
40.400
|
$1,900.000
|
$970.000
|
$2,000.000
|
$1,795.710
|
$2,500.000
|
$2,766.500
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
11.600
|
$2,400.000
|
$1,180.000
|
$2,500.000
|
$2,024.910
|
$4,800.000
|
$4,805.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
9,200.000
|
$25.000
|
$22.250
|
$28.000
|
$30.470
|
$30.000
|
$50.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
70.600
|
$650.000
|
$825.000
|
$760.000
|
$951.860
|
$1,700.000
|
$1,143.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,190.200
|
$200.000
|
$190.000
|
$265.000
|
$330.810
|
$215.000
|
$311.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
550.000
|
$200.000
|
$194.000
|
$160.000
|
$130.000
|
$210.000
|
$369.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$510.000
|
$610.000
|
$725.000
|
$1,154.760
|
$830.000
|
$1,274.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
448.000
|
$162.000
|
$182.000
|
$185.000
|
$170.840
|
$187.610
|
$228.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
91.000
|
$105.000
|
$140.000
|
$150.000
|
$175.200
|
$130.000
|
$295.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
165.000
|
$90.000
|
$125.000
|
$150.000
|
$162.530
|
$160.000
|
$176.500
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$1,320.000
|
$1,990.000
|
$950.000
|
$2,907.720
|
$2,000.000
|
$2,964.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,286.000
|
$2,250.000
|
$1,150.000
|
$3,144.020
|
$2,200.000
|
$3,297.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$585.000
|
$980.000
|
$600.000
|
$1,051.100
|
$780.000
|
$589.000
|
|
|
REMOV STR (PIPE)
|
LF
|
60.000
|
$22.000
|
$25.000
|
$30.000
|
$36.450
|
$47.000
|
$26.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$46,000.000
|
$65,000.000
|
$150,000.000
|
$16,637.180
|
$43,000.000
|
$40,392.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,271.000
|
$270,170.430
|
$349,796.740
|
$384,600.000
|
$100,000.000
|
$386,020.850
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$7,700.000
|
$10,000.000
|
$3,384.430
|
$2,150.000
|
$1,609.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
45.000
|
$30.000
|
$35.000
|
$62.000
|
$32.010
|
$39.000
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
30.000
|
$48.000
|
$72.000
|
$180.000
|
$64.010
|
$78.000
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
75.000
|
$10.000
|
$12.000
|
$25.000
|
$12.800
|
$16.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
489.000
|
$21.000
|
$30.000
|
$50.000
|
$29.870
|
$36.000
|
$10.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
489.000
|
$8.000
|
$9.000
|
$11.000
|
$9.600
|
$12.000
|
$10.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
900.000
|
$3.000
|
$3.500
|
$4.600
|
$2.930
|
$3.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
900.000
|
$0.800
|
$1.000
|
$1.000
|
$0.800
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
363.000
|
$5.000
|
$4.000
|
$6.500
|
$3.470
|
$4.000
|
$3.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
363.000
|
$1.500
|
$1.000
|
$1.000
|
$0.910
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,240.000
|
$90.000
|
$125.000
|
$90.000
|
$170.000
|
$140.000
|
$220.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$2,400.000
|
$4,000.000
|
$6,250.000
|
$4,886.060
|
$6,900.000
|
$9,423.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
810.000
|
$60.000
|
$18.000
|
$50.000
|
$35.000
|
$94.000
|
$136.500
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
810.000
|
$10.000
|
$7.000
|
$5.000
|
$10.000
|
$12.000
|
$7.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
810.000
|
$8.000
|
$20.000
|
$14.000
|
$18.400
|
$18.000
|
$19.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
349.000
|
$48.000
|
$155.000
|
$50.000
|
$131.670
|
$120.000
|
$155.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
1,400.000
|
$2.000
|
$4.000
|
$2.200
|
$2.020
|
$3.000
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
700.000
|
$0.450
|
$4.000
|
$4.000
|
$2.020
|
$3.000
|
$0.500
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
15.000
|
$550.000
|
$200.000
|
$450.000
|
$503.850
|
$485.000
|
$550.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$21.000
|
$25.000
|
$24.000
|
$27.480
|
$35.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,100.000
|
$2,200.000
|
$2,000.000
|
$1,908.540
|
$2,450.000
|
$2,003.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
120.000
|
$4.000
|
$6.000
|
$4.000
|
$10.180
|
$13.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$3,000.000
|
$3,000.000
|
$2,900.970
|
$3,700.000
|
$3,111.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$230.000
|
$350.000
|
$320.000
|
$254.470
|
$330.000
|
$234.500
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,004.000
|
$1,800.000
|
$950.000
|
$842.440
|
$1,570.000
|
$1,350.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$982.000
|
$1,300.000
|
$1,000.000
|
$702.840
|
$2,200.000
|
$675.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,000.000
|
$10,000.000
|
$8,136.620
|
$8,500.000
|
$7,875.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
3.000
|
$365.000
|
$300.000
|
$400.000
|
$267.040
|
$1,800.000
|
$629.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
3.000
|
$390.000
|
$500.000
|
$300.000
|
$675.620
|
$200.000
|
$403.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$520.000
|
$688.000
|
$700.000
|
$670.130
|
$840.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,160.000
|
$900.000
|
$920.000
|
$881.750
|
$1,150.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$3,140.000
|
$4,500.000
|
$4,400.000
|
$4,232.450
|
$9,200.000
|
$2,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$22.000
|
$18.000
|
$22.000
|
$15.120
|
$24.000
|
$21.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
4.000
|
$22.000
|
$18.000
|
$22.000
|
$15.120
|
$24.000
|
$26.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
44.000
|
$7.000
|
$8.000
|
$5.500
|
$5.040
|
$8.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,004.000
|
$0.800
|
$1.300
|
$1.000
|
$1.140
|
$1.000
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$7.000
|
$11.000
|
$6.000
|
$8.060
|
$10.000
|
$9.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,502.000
|
$1.000
|
$1.300
|
$1.000
|
$1.140
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
18.000
|
$12.000
|
$18.000
|
$9.000
|
$10.080
|
$17.000
|
$12.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
960.000
|
$0.200
|
$0.700
|
$0.300
|
$0.660
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,554.000
|
$0.600
|
$2.000
|
$1.200
|
$0.940
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,686.000
|
$0.600
|
$2.000
|
$1.200
|
$0.940
|
$2.000
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
46.000
|
$7.000
|
$8.000
|
$6.000
|
$15.120
|
$8.000
|
$18.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,004.000
|
$0.500
|
$1.200
|
$0.700
|
$0.560
|
$0.990
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,240.000
|
$0.050
|
$0.390
|
$0.200
|
$0.200
|
$0.350
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
18.000
|
$2.000
|
$1.400
|
$5.500
|
$3.020
|
$1.500
|
$3.500
|
|
|
FULL - WIDTH MOWING
|
AC
|
2.000
|
$420.000
|
$1,200.000
|
$1,100.000
|
$3,023.120
|
$1,200.000
|
$1,638.500
|
|
|
LITTER REMOVAL
|
AC
|
4.020
|
$380.000
|
$1,500.000
|
$600.000
|
$1,274.880
|
$1,200.000
|
$742.500
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
881.000
|
$150.000
|
$160.000
|
$156.000
|
$151.160
|
$215.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
321.000
|
$3.200
|
$9.000
|
$8.000
|
$8.060
|
$9.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,400.000
|
$17,000.000
|
$15,000.000
|
$19,195.200
|
$20,900.000
|
$2,562.000
|
|
|
TMA (STATIONARY)
|
DAY
|
160.000
|
$230.000
|
$180.000
|
$250.000
|
$123.550
|
$215.000
|
$14.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$505.000
|
$1,000.000
|
$625.000
|
$642.910
|
$1,240.000
|
$563.000
|
|
Totals: |
$3,137,979.450
|
$2,920,104.630
|
$3,497,967.478
|
$3,846,000.000
|
$3,976,960.240
|
$4,265,000.000
|