|
|
PREPARING ROW
|
STA
|
533.330
|
$600.000
|
$352.430
|
$484.430
|
$2,500.000
|
$500.000
|
$4,263.790
|
$2,156.000
|
$2,000.000
|
|
|
REMOV CONC (RIPRAP)
|
CY
|
0.900
|
$1,500.000
|
$50.000
|
$12.000
|
$100.000
|
$1,100.860
|
$475.730
|
$250.000
|
$1,500.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
183.000
|
$50.000
|
$12.000
|
$12.000
|
$20.670
|
$20.000
|
$26.830
|
$30.000
|
$50.000
|
|
|
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
|
SY
|
3,838.000
|
$10.000
|
$13.000
|
$6.840
|
$13.000
|
$10.000
|
$3.970
|
$19.510
|
$11.000
|
|
|
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
2,254.000
|
$35.000
|
$16.000
|
$8.790
|
$10.000
|
$10.000
|
$8.800
|
$6.690
|
$11.000
|
|
|
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
|
SY
|
9,683.000
|
$15.000
|
$19.000
|
$14.820
|
$20.000
|
$6.000
|
$11.040
|
$9.370
|
$16.500
|
|
|
RMV (7") TRT/UNTRT BASE & ASPH PAV
|
SY
|
267.000
|
$25.000
|
$35.000
|
$9.870
|
$20.000
|
$13.000
|
$32.940
|
$6.770
|
$5.500
|
|
|
EXCAV (ROADWAY)
|
CY
|
27,095.000
|
$14.000
|
$17.500
|
$17.500
|
$20.000
|
$35.000
|
$11.060
|
$6.250
|
$3.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
15,557.000
|
$21.000
|
$17.500
|
$17.500
|
$14.000
|
$38.000
|
$8.850
|
$80.300
|
$1.000
|
|
|
EMBANK (FNL)(DC)(TY C2)
|
CY
|
891.000
|
$45.000
|
$40.000
|
$17.500
|
$50.000
|
$60.000
|
$24.100
|
$8.000
|
$55.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
533.330
|
$175.000
|
$335.000
|
$325.000
|
$304.230
|
$250.000
|
$290.530
|
$16.600
|
$200.000
|
|
|
BLADING
|
STA
|
533.330
|
$275.000
|
$300.000
|
$325.000
|
$107.520
|
$110.000
|
$363.870
|
$15.000
|
$400.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
346,694.000
|
$0.250
|
$0.150
|
$0.150
|
$0.610
|
$0.150
|
$0.150
|
$0.150
|
$0.110
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
346,694.000
|
$0.200
|
$0.140
|
$0.140
|
$0.140
|
$0.140
|
$0.140
|
$0.150
|
$0.080
|
|
|
VEGETATIVE WATERING
|
TGL
|
103,159.000
|
$0.500
|
$0.010
|
$0.100
|
$0.020
|
$0.100
|
$0.010
|
$0.010
|
$0.100
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
170,844.000
|
$22.000
|
$33.500
|
$33.430
|
$27.490
|
$30.000
|
$30.640
|
$32.000
|
$39.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
23,252.000
|
$35.000
|
$47.000
|
$57.000
|
$14.680
|
$40.000
|
$42.060
|
$49.000
|
$38.000
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
136,225.000
|
$2.500
|
$3.000
|
$2.500
|
$1.760
|
$2.250
|
$3.600
|
$3.300
|
$7.500
|
|
|
CEMENT
|
TON
|
911.000
|
$225.000
|
$223.000
|
$213.000
|
$210.910
|
$230.000
|
$301.160
|
$216.000
|
$250.000
|
|
|
CEMENT TRT (EXIST MATL)(6")
|
SY
|
5,971.000
|
$5.000
|
$2.750
|
$3.000
|
$3.200
|
$3.000
|
$4.750
|
$2.600
|
$2.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(6")
|
SY
|
144,576.000
|
$2.000
|
$2.750
|
$2.500
|
$3.170
|
$3.000
|
$5.870
|
$2.900
|
$2.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(10")
|
SY
|
4,463.000
|
$5.000
|
$8.000
|
$3.000
|
$4.270
|
$4.000
|
$5.300
|
$3.000
|
$4.000
|
|
|
CEMENT TRT (NEW BASE)(10")
|
SY
|
3,900.000
|
$5.000
|
$8.000
|
$3.000
|
$4.890
|
$4.000
|
$6.520
|
$3.400
|
$4.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
51,390.000
|
$5.250
|
$6.270
|
$6.260
|
$5.360
|
$1.500
|
$4.140
|
$4.550
|
$4.850
|
|
|
ASPH (CRS-2P)
|
GAL
|
29,128.000
|
$5.000
|
$5.310
|
$5.310
|
$4.000
|
$4.200
|
$4.000
|
$4.660
|
$4.960
|
|
|
ASPH (RC-250)
|
GAL
|
23,302.000
|
$10.000
|
$6.050
|
$6.140
|
$6.000
|
$6.290
|
$6.000
|
$5.910
|
$6.290
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
23,302.000
|
$3.000
|
$4.980
|
$4.980
|
$6.000
|
$6.290
|
$6.000
|
$4.520
|
$4.810
|
|
|
AGGR (TY-B OR L, GR-3)(SAC-B)
|
CY
|
1,131.000
|
$150.000
|
$98.400
|
$160.880
|
$250.000
|
$262.220
|
$250.000
|
$295.650
|
$314.870
|
|
|
AGGR (TY-B OR L, GR-5)
|
CY
|
480.000
|
$125.000
|
$90.500
|
$148.680
|
$250.000
|
$262.220
|
$250.000
|
$324.090
|
$345.160
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
249.000
|
$150.000
|
$156.000
|
$259.290
|
$150.000
|
$140.000
|
$152.510
|
$176.820
|
$149.100
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
18,812.000
|
$120.000
|
$139.000
|
$124.700
|
$120.000
|
$120.000
|
$128.110
|
$125.620
|
$123.540
|
|
|
TACK COAT
|
GAL
|
1,495.000
|
$8.000
|
$7.500
|
$7.690
|
$5.000
|
$2.750
|
$4.250
|
$1.000
|
$3.200
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
284.000
|
$35.000
|
$110.840
|
$214.740
|
$165.000
|
$130.000
|
$169.710
|
$200.000
|
$159.740
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
12,979.000
|
$4.000
|
$2.400
|
$2.360
|
$1.940
|
$4.500
|
$3.490
|
$2.970
|
$2.760
|
|
|
PLANE ASPH CONC PAV(5")
|
SY
|
129,487.000
|
$6.000
|
$4.250
|
$3.350
|
$2.100
|
$6.000
|
$4.210
|
$7.080
|
$5.500
|
|
|
STRUCT EXCAV
|
CY
|
26.000
|
$75.000
|
$35.000
|
$100.000
|
$57.500
|
$120.000
|
$219.250
|
$160.000
|
$100.000
|
|
|
CUT & RESTORING PAV
|
SY
|
451.000
|
$164.000
|
$36.500
|
$100.000
|
$257.690
|
$82.620
|
$40.010
|
$115.000
|
$250.000
|
|
|
CEM STABIL BKFL
|
CY
|
789.000
|
$200.000
|
$222.000
|
$250.000
|
$185.000
|
$203.960
|
$243.360
|
$210.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
127.000
|
$650.000
|
$250.000
|
$275.000
|
$350.000
|
$268.430
|
$140.800
|
$200.000
|
$600.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
703.000
|
$20.000
|
$5.000
|
$15.000
|
$12.000
|
$8.000
|
$5.480
|
$1.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
953.000
|
$125.000
|
$50.000
|
$18.000
|
$35.000
|
$43.000
|
$54.810
|
$1.000
|
$30.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
90.000
|
$2,000.000
|
$610.500
|
$700.000
|
$731.560
|
$850.000
|
$712.970
|
$871.000
|
$775.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
1.400
|
$1,500.000
|
$700.000
|
$800.000
|
$703.540
|
$815.000
|
$767.360
|
$670.000
|
$4,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
3,735.000
|
$180.000
|
$155.500
|
$223.200
|
$194.970
|
$300.000
|
$170.460
|
$156.000
|
$225.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
148.000
|
$300.000
|
$155.500
|
$248.200
|
$233.400
|
$320.000
|
$170.460
|
$170.000
|
$250.000
|
|
|
GABIONS (GALV)
|
CY
|
25.000
|
$500.000
|
$400.000
|
$375.000
|
$798.760
|
$400.000
|
$438.490
|
$592.000
|
$660.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
47.000
|
$250.000
|
$300.000
|
$674.210
|
$309.860
|
$270.000
|
$328.870
|
$300.000
|
$340.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
60.000
|
$500.000
|
$330.000
|
$400.000
|
$750.000
|
$320.000
|
$361.750
|
$500.000
|
$300.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
56.000
|
$120.000
|
$575.000
|
$625.000
|
$950.000
|
$700.000
|
$630.330
|
$990.000
|
$580.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
18.000
|
$4,000.000
|
$850.000
|
$950.000
|
$850.000
|
$900.000
|
$931.790
|
$1,073.000
|
$880.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,747.000
|
$70.000
|
$42.500
|
$50.000
|
$60.000
|
$60.000
|
$45.860
|
$84.000
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
296.000
|
$90.000
|
$75.000
|
$80.000
|
$125.000
|
$80.000
|
$82.220
|
$127.000
|
$111.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
748.000
|
$120.000
|
$108.000
|
$115.000
|
$190.000
|
$130.000
|
$118.390
|
$137.000
|
$132.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
422.000
|
$200.000
|
$142.500
|
$170.000
|
$225.000
|
$170.000
|
$156.210
|
$230.000
|
$176.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
54.000
|
$300.000
|
$235.000
|
$220.000
|
$275.000
|
$240.000
|
$257.610
|
$265.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
164.000
|
$400.000
|
$235.000
|
$250.000
|
$325.000
|
$270.000
|
$257.610
|
$390.820
|
$300.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
4.000
|
$6,000.000
|
$5,900.000
|
$7,000.000
|
$3,500.000
|
$3,000.000
|
$6,467.730
|
$6,500.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
14.000
|
$8,000.000
|
$7,200.000
|
$7,500.000
|
$4,500.000
|
$9,000.000
|
$7,892.830
|
$6,700.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
12.000
|
$1,000.000
|
$8,000.000
|
$9,500.000
|
$5,500.000
|
$14,000.000
|
$8,769.810
|
$8,570.000
|
$10,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
2.000
|
$14,000.000
|
$10,500.000
|
$10,500.000
|
$7,000.000
|
$17,000.000
|
$11,510.370
|
$10,700.000
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$11,000.000
|
$8,500.000
|
$23,000.000
|
$13,154.710
|
$14,300.000
|
$15,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$8,500.000
|
$7,200.000
|
$8,000.000
|
$5,000.000
|
$11,000.000
|
$7,892.830
|
$8,800.000
|
$9,700.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$13,000.000
|
$12,000.000
|
$12,000.000
|
$9,500.000
|
$26,000.000
|
$13,154.710
|
$13,000.000
|
$14,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$19,000.000
|
$17,000.000
|
$16,000.000
|
$8,500.000
|
$34,000.000
|
$18,635.840
|
$15,000.000
|
$12,500.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$10,000.000
|
$21,000.000
|
$18,000.000
|
$18,000.000
|
$45,000.000
|
$23,020.740
|
$28,000.000
|
$25,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
194.000
|
$1,150.000
|
$698.000
|
$800.000
|
$950.000
|
$2,000.000
|
$765.170
|
$1,126.000
|
$600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,450.000
|
$1,450.000
|
$1,300.000
|
$2,500.000
|
$2,200.000
|
$1,589.530
|
$1,829.000
|
$1,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
7.000
|
$2,580.000
|
$2,450.000
|
$2,500.000
|
$3,500.000
|
$4,000.000
|
$2,685.750
|
$2,753.000
|
$1,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,500.000
|
$6,900.000
|
$7,500.000
|
$5,000.000
|
$4,100.000
|
$7,563.960
|
$5,713.000
|
$4,650.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$13,000.000
|
$13,500.000
|
$14,000.000
|
$6,500.000
|
$6,000.000
|
$14,799.050
|
$9,454.000
|
$8,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$13,000.000
|
$800.000
|
$1,200.000
|
$1,500.000
|
$2,900.000
|
$876.980
|
$1,453.000
|
$3,000.000
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$3,300.000
|
$500.000
|
$500.000
|
$750.000
|
$2,500.000
|
$548.110
|
$784.000
|
$1,000.000
|
|
|
REMOV STR (SET)
|
EA
|
81.000
|
$350.000
|
$50.000
|
$100.000
|
$550.000
|
$170.000
|
$54.810
|
$214.000
|
$200.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$9,000.000
|
$800.000
|
$1,000.000
|
$1,200.000
|
$3,400.000
|
$876.980
|
$1,844.000
|
$5,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$164.000
|
$800.000
|
$800.000
|
$1,200.000
|
$7,000.000
|
$876.980
|
$685.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
3,983.000
|
$27.000
|
$4.500
|
$8.000
|
$30.000
|
$45.000
|
$4.930
|
$17.500
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,764,592.000
|
$470,525.000
|
$999,804.596
|
$1,998,000.000
|
$2,500,000.000
|
$2,610,000.000
|
$2,300,000.000
|
$2,390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$15,000.000
|
$12,985.760
|
$11,750.000
|
$22,260.000
|
$61,500.000
|
$40,140.100
|
$30,000.000
|
$84,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$18,000.000
|
$10,000.000
|
$9,720.000
|
$17,500.000
|
$16,237.500
|
$15,500.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
358.000
|
$234.000
|
$150.000
|
$75.000
|
$500.000
|
$280.000
|
$350.000
|
$127.000
|
$75.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
358.000
|
$156.000
|
$75.000
|
$75.000
|
$0.010
|
$31.000
|
$70.000
|
$67.000
|
$75.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
2,240.000
|
$70.000
|
$65.000
|
$65.000
|
$65.000
|
$70.000
|
$65.000
|
$85.000
|
$93.720
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,240.000
|
$12.500
|
$12.000
|
$12.000
|
$12.000
|
$13.000
|
$12.000
|
$10.000
|
$11.720
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,632.000
|
$34.000
|
$37.000
|
$15.000
|
$37.000
|
$39.000
|
$37.000
|
$34.000
|
$36.740
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,632.000
|
$11.250
|
$10.000
|
$5.000
|
$10.000
|
$11.000
|
$10.000
|
$13.000
|
$10.650
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
69,695.000
|
$3.750
|
$3.690
|
$3.690
|
$3.690
|
$4.000
|
$3.690
|
$4.310
|
$3.730
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
69,695.000
|
$1.000
|
$0.900
|
$0.900
|
$0.900
|
$1.000
|
$0.900
|
$1.000
|
$1.070
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,223.000
|
$6.500
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$6.000
|
$5.000
|
$6.230
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,223.000
|
$2.000
|
$1.500
|
$1.500
|
$1.500
|
$1.500
|
$1.500
|
$1.000
|
$1.330
|
|
|
CONSTRUCTING DETOURS (TY1)
|
SY
|
491.000
|
$150.000
|
$184.000
|
$100.000
|
$150.000
|
$120.000
|
$116.250
|
$235.000
|
$150.000
|
|
|
CONSTRUCTING DETOURS (TY2)
|
SY
|
286.000
|
$160.000
|
$182.000
|
$107.830
|
$75.000
|
$90.000
|
$94.110
|
$150.000
|
$200.000
|
|
|
CONSTRUCTING DETOURS (TY3)
|
SY
|
349.000
|
$175.000
|
$272.000
|
$100.000
|
$125.000
|
$210.000
|
$186.440
|
$259.000
|
$250.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
183.000
|
$275.000
|
$115.000
|
$161.120
|
$192.390
|
$140.000
|
$145.500
|
$85.000
|
$250.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12,406.000
|
$55.000
|
$67.000
|
$80.420
|
$90.000
|
$60.000
|
$45.770
|
$81.000
|
$70.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
96,873.000
|
$0.300
|
$1.150
|
$0.150
|
$0.150
|
$0.150
|
$0.070
|
$0.160
|
$0.160
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
48,952.000
|
$0.300
|
$1.150
|
$0.150
|
$0.150
|
$0.230
|
$0.080
|
$0.160
|
$0.160
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
55.000
|
$350.000
|
$270.000
|
$230.000
|
$230.000
|
$250.000
|
$265.000
|
$230.000
|
$314.180
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
6.000
|
$350.000
|
$335.000
|
$250.000
|
$250.000
|
$270.000
|
$275.000
|
$250.000
|
$335.480
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
5.000
|
$650.000
|
$1,200.000
|
$660.000
|
$660.000
|
$700.000
|
$660.000
|
$660.000
|
$825.380
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
85.000
|
$740.000
|
$700.000
|
$595.000
|
$595.000
|
$600.000
|
$645.000
|
$595.000
|
$670.950
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
12.000
|
$700.000
|
$780.000
|
$695.000
|
$695.000
|
$700.000
|
$700.000
|
$695.000
|
$804.080
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$850.000
|
$844.000
|
$850.000
|
$850.000
|
$900.000
|
$725.000
|
$850.000
|
$772.130
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
8.000
|
$1,050.000
|
$1,052.000
|
$850.000
|
$850.000
|
$900.000
|
$800.000
|
$850.000
|
$1,160.850
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,050.000
|
$1,325.000
|
$950.000
|
$850.000
|
$1,000.000
|
$1,000.000
|
$950.000
|
$1,276.940
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,325.000
|
$1,602.000
|
$990.000
|
$950.000
|
$1,100.000
|
$1,200.000
|
$990.000
|
$1,373.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
114.000
|
$320.000
|
$20.000
|
$30.000
|
$29.000
|
$41.000
|
$22.000
|
$29.000
|
$26.630
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
5.000
|
$175.000
|
$60.000
|
$60.000
|
$60.000
|
$60.000
|
$75.000
|
$75.000
|
$63.900
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
105,609.000
|
$0.300
|
$0.450
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
$0.250
|
$0.480
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
183.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.550
|
$1.070
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
712.000
|
$1.000
|
$0.650
|
$0.650
|
$0.650
|
$0.700
|
$0.650
|
$0.450
|
$0.690
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
144.000
|
$5.000
|
$4.250
|
$4.250
|
$4.250
|
$4.500
|
$4.250
|
$3.000
|
$4.530
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
96,891.000
|
$0.300
|
$0.450
|
$0.450
|
$0.450
|
$0.500
|
$0.450
|
$0.250
|
$0.480
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
9,619.000
|
$1.000
|
$1.250
|
$1.250
|
$0.130
|
$1.250
|
$1.250
|
$0.800
|
$1.330
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
5,155.000
|
$1.500
|
$1.250
|
$1.250
|
$1.250
|
$1.250
|
$1.250
|
$0.800
|
$1.330
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,218.000
|
$3.250
|
$3.000
|
$2.450
|
$2.000
|
$2.000
|
$1.000
|
$0.550
|
$5.460
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
21.000
|
$4.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.850
|
$1.070
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
183.000
|
$0.300
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.070
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
712.000
|
$0.300
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.880
|
$1.070
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
368.000
|
$11.500
|
$6.700
|
$6.700
|
$1.000
|
$7.000
|
$6.700
|
$7.000
|
$7.140
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$200.000
|
$130.000
|
$130.000
|
$130.000
|
$140.000
|
$130.000
|
$155.000
|
$138.450
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$235.000
|
$160.000
|
$160.000
|
$160.000
|
$170.000
|
$160.000
|
$170.000
|
$170.400
|
|
|
PAVEMENT SLER 6"
|
LF
|
1,215.000
|
$5.000
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
$0.200
|
$0.240
|
$0.210
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
105,609.000
|
$0.600
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.510
|
$0.530
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,220.000
|
$5.000
|
$0.550
|
$0.550
|
$0.550
|
$0.600
|
$0.550
|
$0.530
|
$0.590
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
96,891.000
|
$0.600
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.520
|
$0.530
|
|
REFL PAV MRKR TY I-C
|
EA
|
48.000
|
$0.600
|
$4.000
|
$4.000
|
$4.000
|
$4.250
|
$4.000
|
$3.790
|
$4.260
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,465.000
|
$5.000
|
$4.000
|
$4.000
|
$4.000
|
$4.250
|
$4.000
|
$3.800
|
$4.260
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
1,215.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.900
|
$1.070
|
|
|
REMOVE AND RE-LAY EXISTING STONE RIPRAP
|
CY
|
39.000
|
$500.000
|
$800.000
|
$400.000
|
$125.000
|
$210.000
|
$300.000
|
$20.000
|
$266.250
|
|
Totals: |
$18,327,261.600
|
$18,829,387.872
|
$19,350,919.798
|
$19,980,075.724
|
$22,551,810.294
|
$22,740,089.364
|
$22,765,119.708
|
$24,424,240.880
|