PREPARING ROW
|
STA
|
12.100
|
$12,000.000
|
$4,800.000
|
$45,524.110
|
$43,101.670
|
$18,900.000
|
$12,100.000
|
$15,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
719.000
|
$7.000
|
$16.000
|
$12.000
|
$9.630
|
$1.000
|
$4.500
|
$30.000
|
|
|
REMOV STAB BASE & ASPH PAV (8"-20")
|
SY
|
1,945.000
|
$13.000
|
$24.000
|
$15.000
|
$9.550
|
$13.000
|
$18.000
|
$35.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,408.000
|
$20.000
|
$16.000
|
$14.000
|
$30.470
|
$30.000
|
$18.000
|
$43.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,960.000
|
$25.000
|
$15.000
|
$23.000
|
$60.000
|
$25.000
|
$19.000
|
$40.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,893.000
|
$2.000
|
$3.000
|
$2.500
|
$2.990
|
$1.000
|
$2.000
|
$1.000
|
|
|
BLOCK SODDING
|
SY
|
7,893.000
|
$5.000
|
$6.000
|
$5.000
|
$4.790
|
$4.990
|
$4.500
|
$6.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,893.000
|
$0.150
|
$0.390
|
$0.350
|
$0.300
|
$0.320
|
$0.500
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
2,349.000
|
$12.000
|
$30.000
|
$1.000
|
$0.010
|
$1.000
|
$31.500
|
$49.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
568.000
|
$25.000
|
$39.000
|
$26.000
|
$50.000
|
$50.000
|
$66.000
|
$58.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2)(17")
|
SY
|
2,783.000
|
$30.000
|
$45.000
|
$32.000
|
$60.000
|
$60.000
|
$71.000
|
$70.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
670.000
|
$5.560
|
$31.000
|
$22.000
|
$31.630
|
$34.440
|
$7.000
|
$36.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
354.000
|
$7.000
|
$33.000
|
$36.200
|
$34.120
|
$30.980
|
$5.000
|
$39.000
|
|
|
ASPH (RC-250)
|
GAL
|
153.000
|
$6.000
|
$42.000
|
$21.500
|
$43.370
|
$39.380
|
$5.000
|
$49.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
4.400
|
$400.000
|
$2,799.000
|
$3,300.000
|
$2,891.630
|
$2,625.000
|
$200.000
|
$3,300.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
1,137.000
|
$8.000
|
$23.000
|
$15.000
|
$23.940
|
$21.740
|
$6.500
|
$28.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
4.600
|
$450.000
|
$2,799.000
|
$2,500.000
|
$2,891.630
|
$2,625.000
|
$200.000
|
$3,300.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
25.800
|
$250.000
|
$1,900.000
|
$2,200.000
|
$1,966.310
|
$1,785.000
|
$200.000
|
$2,220.000
|
|
|
CEM STABIL BKFL
|
CY
|
581.000
|
$325.000
|
$210.000
|
$225.000
|
$250.000
|
$185.000
|
$170.000
|
$105.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,202.000
|
$40.000
|
$44.000
|
$90.000
|
$71.880
|
$85.000
|
$194.000
|
$50.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
180.000
|
$175.000
|
$85.000
|
$78.000
|
$76.330
|
$75.000
|
$163.000
|
$155.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,311.000
|
$250.000
|
$135.000
|
$140.000
|
$136.400
|
$150.000
|
$181.000
|
$455.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
720.000
|
$360.000
|
$175.000
|
$170.000
|
$200.000
|
$185.000
|
$187.000
|
$660.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
127.200
|
$1,600.000
|
$957.010
|
$1,500.000
|
$1,638.400
|
$2,500.000
|
$1,400.000
|
$5,300.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
37.600
|
$1,600.000
|
$1,400.000
|
$2,300.000
|
$2,104.430
|
$2,500.000
|
$2,100.000
|
$3,900.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
23.500
|
$2,400.000
|
$1,500.000
|
$2,000.000
|
$3,165.190
|
$2,500.000
|
$3,926.500
|
$5,450.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
3,675.000
|
$25.000
|
$31.000
|
$32.000
|
$40.420
|
$50.000
|
$55.000
|
$35.000
|
|
|
REINF CONC SLAB (SLAB BEAM)(HPC)
|
SF
|
8,393.000
|
$25.000
|
$25.000
|
$19.000
|
$20.830
|
$25.000
|
$47.000
|
$21.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
275.800
|
$650.000
|
$825.000
|
$700.000
|
$958.050
|
$800.000
|
$952.000
|
$1,300.000
|
|
|
PRESTR CONC SLAB BEAM (4SB12)
|
LF
|
654.500
|
$200.000
|
$210.000
|
$270.000
|
$213.490
|
$350.000
|
$390.000
|
$300.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
374.000
|
$200.000
|
$260.000
|
$285.000
|
$228.180
|
$450.000
|
$300.000
|
$280.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
692.500
|
$300.000
|
$260.000
|
$290.000
|
$296.180
|
$400.000
|
$331.000
|
$250.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
668.600
|
$220.000
|
$230.000
|
$265.000
|
$240.000
|
$350.000
|
$340.000
|
$240.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
690.000
|
$200.000
|
$170.000
|
$166.000
|
$181.270
|
$161.000
|
$249.500
|
$210.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
2,397.000
|
$250.000
|
$170.000
|
$160.000
|
$144.720
|
$187.000
|
$180.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
48.000
|
$545.000
|
$700.000
|
$750.000
|
$956.470
|
$650.000
|
$1,170.000
|
$750.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
304.000
|
$100.000
|
$170.000
|
$156.000
|
$143.940
|
$150.000
|
$234.500
|
$170.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
436.000
|
$162.000
|
$190.000
|
$148.000
|
$154.050
|
$175.000
|
$226.000
|
$185.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
49.000
|
$172.000
|
$200.000
|
$175.000
|
$135.700
|
$150.000
|
$283.000
|
$140.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
134.000
|
$105.000
|
$160.000
|
$155.000
|
$176.310
|
$115.000
|
$281.000
|
$120.000
|
|
|
TYPE A JOINT
|
LF
|
100.000
|
$30.000
|
$75.000
|
$17.000
|
$134.760
|
$15.000
|
$268.500
|
$165.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,500.000
|
$10,000.000
|
$5,000.000
|
$8,792.170
|
$7,500.000
|
$623.500
|
$17,200.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
165.000
|
$75.000
|
$96.000
|
$50.000
|
$121.900
|
$100.000
|
$102.500
|
$105.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$46,000.000
|
$50,000.000
|
$70,500.000
|
$45,000.070
|
$50,000.000
|
$112,145.000
|
$55,640.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$451,782.000
|
$480,000.010
|
$551,028.680
|
$556,930.000
|
$475,000.000
|
$599,635.050
|
$575,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$12,000.000
|
$10,000.000
|
$11,500.000
|
$3,257.350
|
$11,550.000
|
$2,268.000
|
$2,700.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$30.000
|
$37.000
|
$50.000
|
$30.230
|
$47.250
|
$62.500
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
175.000
|
$55.000
|
$74.000
|
$107.000
|
$60.450
|
$57.750
|
$143.500
|
$72.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
295.000
|
$12.000
|
$15.000
|
$20.000
|
$12.090
|
$31.500
|
$26.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,467.000
|
$25.000
|
$35.000
|
$30.000
|
$28.210
|
$10.000
|
$10.500
|
$33.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,467.000
|
$8.000
|
$11.000
|
$9.000
|
$9.070
|
$5.000
|
$10.500
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,441.000
|
$3.000
|
$4.000
|
$3.200
|
$2.770
|
$2.100
|
$4.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,441.000
|
$0.800
|
$1.000
|
$0.750
|
$0.760
|
$0.530
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
154.000
|
$5.000
|
$4.000
|
$3.600
|
$3.270
|
$4.730
|
$7.500
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
154.000
|
$1.500
|
$1.000
|
$0.850
|
$0.860
|
$2.630
|
$2.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
722.000
|
$90.000
|
$213.000
|
$140.000
|
$150.000
|
$150.000
|
$150.000
|
$160.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$2,400.000
|
$3,500.000
|
$6,000.000
|
$3,375.390
|
$3,150.000
|
$16,057.000
|
$6,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$60.000
|
$25.000
|
$55.000
|
$35.000
|
$40.000
|
$150.000
|
$103.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
750.000
|
$12.000
|
$8.000
|
$4.500
|
$10.000
|
$10.000
|
$7.500
|
$6.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$8.000
|
$12.000
|
$13.000
|
$20.000
|
$5.000
|
$19.500
|
$17.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
8.000
|
$550.000
|
$240.000
|
$425.000
|
$503.790
|
$525.000
|
$550.000
|
$325.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$25.000
|
$30.000
|
$22.000
|
$18.830
|
$21.000
|
$20.000
|
$23.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,100.000
|
$2,000.000
|
$2,000.000
|
$1,717.850
|
$3,002.780
|
$1,844.000
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,400.000
|
$1,300.000
|
$1,100.000
|
$1,152.470
|
$2,138.620
|
$1,011.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,070.000
|
$4.000
|
$4.000
|
$2.400
|
$2.070
|
$2.100
|
$2.000
|
$1.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$180.000
|
$180.000
|
$250.000
|
$206.720
|
$210.000
|
$202.500
|
$180.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$3,200.000
|
$2,800.000
|
$3,000.000
|
$2,823.810
|
$2,861.250
|
$2,758.000
|
$2,550.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$300.000
|
$280.000
|
$250.000
|
$413.440
|
$210.000
|
$202.500
|
$560.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,004.000
|
$1,700.000
|
$1,250.000
|
$827.320
|
$1,500.000
|
$1,260.000
|
$1,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$982.000
|
$1,200.000
|
$1,000.000
|
$704.820
|
$750.000
|
$670.000
|
$850.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$9,000.000
|
$8,000.000
|
$8,050.700
|
$9,500.000
|
$7,595.000
|
$8,700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$750.000
|
$600.000
|
$660.000
|
$602.530
|
$627.900
|
$700.000
|
$710.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$635.000
|
$700.000
|
$780.000
|
$698.250
|
$727.650
|
$1,000.000
|
$825.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
14.000
|
$25.000
|
$34.000
|
$17.000
|
$55.420
|
$15.750
|
$25.000
|
$6.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$30.000
|
$32.000
|
$22.000
|
$57.430
|
$21.000
|
$30.000
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,912.000
|
$0.800
|
$1.000
|
$1.100
|
$1.160
|
$1.030
|
$3.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$7.000
|
$8.000
|
$8.500
|
$9.440
|
$8.350
|
$9.000
|
$9.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
670.000
|
$0.250
|
$0.600
|
$0.600
|
$0.590
|
$0.530
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,956.000
|
$0.750
|
$1.300
|
$1.300
|
$1.470
|
$1.300
|
$1.000
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
370.000
|
$1.000
|
$1.300
|
$1.300
|
$1.470
|
$1.300
|
$1.000
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$7.000
|
$6.000
|
$5.500
|
$5.940
|
$5.250
|
$10.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,326.000
|
$0.500
|
$1.200
|
$1.200
|
$1.370
|
$1.210
|
$0.500
|
$1.400
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,326.000
|
$0.100
|
$1.200
|
$0.600
|
$0.650
|
$0.580
|
$0.100
|
$0.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$3,800.000
|
$3,500.000
|
$3,700.000
|
$2,015.160
|
$1,000.000
|
$4,779.500
|
$1,120.000
|
|
|
LITTER REMOVAL
|
CYC
|
6.000
|
$2,700.000
|
$2,000.000
|
$2,200.000
|
$1,511.370
|
$1,750.000
|
$962.500
|
$750.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
507.000
|
$150.000
|
$285.000
|
$290.000
|
$293.210
|
$275.000
|
$250.000
|
$325.000
|
|
|
TACK COAT
|
GAL
|
195.000
|
$5.000
|
$5.000
|
$40.000
|
$4.630
|
$4.000
|
$4.000
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,400.000
|
$25,000.000
|
$15,000.000
|
$18,438.570
|
$10,000.000
|
$1,290.500
|
$20,350.000
|
|
|
TMA (STATIONARY)
|
DAY
|
712.000
|
$230.000
|
$200.000
|
$250.000
|
$109.720
|
$165.000
|
$2.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$700.000
|
$1,000.000
|
$800.000
|
$644.730
|
$1,000.000
|
$932.500
|
$1,500.000
|
|
Totals: |
$5,137,605.650
|
$4,898,841.152
|
$5,510,286.811
|
$5,569,299.993
|
$5,630,846.810
|
$6,118,000.000
|
$7,399,984.600
|