|
|
PREPARING ROW
|
STA
|
173.370
|
$500.000
|
$375.000
|
$1,200.000
|
$2,500.000
|
$525.000
|
$5,500.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
30.000
|
$30.000
|
$15.000
|
$45.000
|
$9.500
|
$15.000
|
$50.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
1,297.000
|
$25.000
|
$12.000
|
$15.000
|
$9.500
|
$12.000
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
11,254.000
|
$22.000
|
$16.000
|
$8.000
|
$9.500
|
$25.000
|
$15.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
13,445.000
|
$35.000
|
$19.300
|
$20.000
|
$21.430
|
$25.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
173.370
|
$350.000
|
$268.000
|
$600.000
|
$410.070
|
$500.000
|
$250.000
|
|
|
BLADING
|
STA
|
173.370
|
$350.000
|
$300.000
|
$800.000
|
$160.760
|
$500.000
|
$250.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
110,536.000
|
$0.500
|
$0.120
|
$0.100
|
$0.370
|
$0.180
|
$0.500
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
110,536.000
|
$0.250
|
$0.100
|
$0.100
|
$0.340
|
$0.160
|
$0.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
32,886.000
|
$5.000
|
$0.010
|
$0.500
|
$2.220
|
$1.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
63,050.000
|
$40.000
|
$29.000
|
$33.500
|
$29.220
|
$34.350
|
$28.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
15,765.000
|
$50.000
|
$43.000
|
$40.000
|
$35.040
|
$55.990
|
$60.000
|
|
|
REWORK BS MTL (TY C)(12")(ORD COMP)
|
SY
|
49,398.000
|
$4.500
|
$2.400
|
$3.000
|
$2.670
|
$3.100
|
$6.000
|
|
|
CEMENT
|
TON
|
328.000
|
$300.000
|
$255.000
|
$240.000
|
$359.750
|
$220.000
|
$300.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(6")
|
SY
|
64,981.000
|
$4.000
|
$1.550
|
$3.000
|
$4.950
|
$3.100
|
$6.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
9,465.000
|
$10.000
|
$5.420
|
$5.380
|
$6.050
|
$6.230
|
$4.000
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(SS-1)
|
GAL
|
9,465.000
|
$10.000
|
$4.220
|
$6.150
|
$6.050
|
$5.010
|
$4.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
11,824.000
|
$6.510
|
$4.570
|
$4.740
|
$5.000
|
$5.360
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
4,417.000
|
$10.000
|
$5.330
|
$6.550
|
$8.000
|
$6.000
|
$4.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
9,933.000
|
$15.000
|
$4.140
|
$4.790
|
$5.000
|
$5.280
|
$6.000
|
|
|
AGGR (TY-B OR L, GR-3)(SAC-B)
|
CY
|
404.000
|
$320.000
|
$136.780
|
$272.640
|
$200.000
|
$170.790
|
$250.000
|
|
|
AGGR (TY-B OR L, GR-5)
|
CY
|
171.000
|
$500.000
|
$125.000
|
$276.900
|
$300.000
|
$158.590
|
$250.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
7,610.000
|
$135.000
|
$139.300
|
$136.000
|
$163.200
|
$137.610
|
$135.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 6")
|
SY
|
49,398.000
|
$7.000
|
$3.600
|
$5.250
|
$3.410
|
$2.990
|
$5.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
65.000
|
$620.000
|
$700.000
|
$850.000
|
$871.050
|
$700.000
|
$550.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
128.000
|
$125.000
|
$220.000
|
$225.000
|
$400.000
|
$400.270
|
$155.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,064.000
|
$90.000
|
$52.000
|
$70.000
|
$54.000
|
$52.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
629.000
|
$130.000
|
$85.000
|
$80.000
|
$74.000
|
$85.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
97.000
|
$170.000
|
$125.000
|
$105.000
|
$118.000
|
$125.000
|
$125.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
84.000
|
$200.000
|
$175.000
|
$155.000
|
$135.000
|
$175.000
|
$150.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$10,000.000
|
$8,000.000
|
$8,000.000
|
$12,000.000
|
$8,000.000
|
$6,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
126.000
|
$1,500.000
|
$800.000
|
$650.000
|
$850.000
|
$800.000
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$2,000.000
|
$1,400.000
|
$1,000.000
|
$1,500.000
|
$1,400.000
|
$1,850.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,700.000
|
$2,800.000
|
$1,800.000
|
$4,500.000
|
$2,800.000
|
$5,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$7,325.000
|
$7,000.000
|
$5,000.000
|
$8,000.000
|
$7,000.000
|
$6,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$3,000.000
|
$1,200.000
|
$4,000.000
|
$850.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
43.000
|
$540.000
|
$100.000
|
$200.000
|
$200.000
|
$100.000
|
$500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,300.000
|
$800.000
|
$3,000.000
|
$880.000
|
$800.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,823.000
|
$30.000
|
$8.000
|
$15.000
|
$7.000
|
$8.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$899,100.000
|
$295,855.000
|
$827,000.000
|
$821,020.000
|
$789,227.700
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$15,000.000
|
$6,667.000
|
$31,500.000
|
$34,000.000
|
$31,036.666
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,500.000
|
$21,000.000
|
$10,000.000
|
$3,760.000
|
$19,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
188.000
|
$250.000
|
$150.000
|
$100.000
|
$106.250
|
$250.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$150.000
|
$150.000
|
$100.000
|
$106.250
|
$250.000
|
$55.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
427.000
|
$61.000
|
$60.000
|
$89.250
|
$85.000
|
$65.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
527.000
|
$18.000
|
$12.000
|
$47.250
|
$13.000
|
$10.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
308.000
|
$27.000
|
$33.000
|
$33.600
|
$35.000
|
$25.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
308.000
|
$11.000
|
$10.000
|
$18.380
|
$10.000
|
$15.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,458.000
|
$4.000
|
$4.000
|
$3.150
|
$3.600
|
$6.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,458.000
|
$1.000
|
$1.000
|
$1.580
|
$1.100
|
$2.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
550.000
|
$4.000
|
$5.500
|
$5.250
|
$5.850
|
$10.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,644.000
|
$12.000
|
$7.500
|
$5.780
|
$6.250
|
$10.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,194.000
|
$2.000
|
$1.000
|
$2.890
|
$1.250
|
$2.000
|
$5.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
|
LF
|
100.000
|
$102.000
|
$60.000
|
$99.750
|
$48.000
|
$75.000
|
$30.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,343.000
|
$140.000
|
$110.000
|
$95.000
|
$93.000
|
$95.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,416.000
|
$85.000
|
$76.300
|
$80.000
|
$99.040
|
$91.730
|
$45.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
26,477.000
|
$0.130
|
$1.160
|
$0.150
|
$0.220
|
$0.140
|
$0.300
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
12,233.000
|
$0.200
|
$1.160
|
$0.150
|
$0.220
|
$0.140
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$26.000
|
$21.200
|
$25.040
|
$20.250
|
$21.200
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,005.000
|
$4.000
|
$2.000
|
$2.990
|
$1.500
|
$2.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$3,800.000
|
$2,900.000
|
$3,244.500
|
$2,770.000
|
$2,900.000
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$300.000
|
$200.000
|
$299.250
|
$150.000
|
$200.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
41.000
|
$350.000
|
$230.000
|
$309.750
|
$220.000
|
$230.000
|
$1,150.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
4.000
|
$350.000
|
$260.000
|
$387.450
|
$250.000
|
$250.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
47.000
|
$800.000
|
$665.000
|
$672.000
|
$650.000
|
$700.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$1,200.000
|
$745.000
|
$756.000
|
$650.000
|
$750.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$900.000
|
$830.000
|
$782.250
|
$685.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,100.000
|
$1,370.000
|
$838.950
|
$685.000
|
$990.000
|
$1,150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$50.000
|
$25.000
|
$15.750
|
$40.000
|
$25.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
33.000
|
$27.000
|
$31.000
|
$26.250
|
$30.000
|
$31.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GNDHH
|
EA
|
12.000
|
$73.000
|
$173.000
|
$267.750
|
$50.000
|
$200.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
17,337.000
|
$0.300
|
$0.230
|
$0.250
|
$0.200
|
$0.230
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
17,337.000
|
$0.300
|
$0.230
|
$0.250
|
$0.200
|
$0.230
|
$0.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
243.000
|
$3.000
|
$1.500
|
$3.000
|
$1.990
|
$2.450
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
444.000
|
$3.000
|
$1.500
|
$3.000
|
$1.990
|
$2.450
|
$6.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
30.000
|
$3.500
|
$2.000
|
$2.160
|
$1.550
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,261.000
|
$2.000
|
$0.970
|
$1.050
|
$0.950
|
$0.970
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
130.000
|
$8.000
|
$7.000
|
$12.000
|
$6.400
|
$7.000
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
34,630.000
|
$1.000
|
$0.490
|
$0.530
|
$0.580
|
$0.490
|
$0.500
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,814.000
|
$1.100
|
$0.550
|
$0.590
|
$0.580
|
$0.550
|
$0.500
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
24,055.000
|
$1.000
|
$0.490
|
$0.530
|
$0.580
|
$0.490
|
$0.500
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
12.000
|
$311.000
|
$190.000
|
$205.200
|
$225.000
|
$190.000
|
$250.000
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
1.000
|
$445.000
|
$357.000
|
$385.560
|
$375.000
|
$357.000
|
$500.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
12.000
|
$400.000
|
$250.000
|
$270.000
|
$300.000
|
$250.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
116.000
|
$7.000
|
$3.750
|
$4.050
|
$4.250
|
$3.750
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
841.000
|
$6.000
|
$3.754
|
$4.050
|
$4.250
|
$3.750
|
$6.000
|
|
Totals: |
$9,890,108.450
|
$6,601,557.924
|
$8,194,616.120
|
$8,369,102.257
|
$8,448,571.662
|
$9,398,450.500
|