|
|
PREPARING ROW
|
STA
|
244.490
|
$3,000.000
|
$250.000
|
$200.000
|
$1,975.000
|
$1,300.000
|
$450.000
|
$575.000
|
$1,340.000
|
$545.000
|
$3,133.770
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
120.000
|
$15.000
|
$14.000
|
$26.000
|
$21.000
|
$29.700
|
$14.000
|
$14.000
|
$22.000
|
$52.600
|
$9.200
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,514.000
|
$12.850
|
$14.000
|
$25.000
|
$21.000
|
$28.130
|
$14.000
|
$14.000
|
$13.000
|
$52.600
|
$19.730
|
|
|
REMOVE STAB BASE AND ASPH PAV (2"-3")
|
SY
|
1,479.400
|
$3.000
|
$3.500
|
$13.000
|
$1.000
|
$9.770
|
$10.000
|
$11.500
|
$10.000
|
$16.600
|
$5.920
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,000.000
|
$8.500
|
$8.180
|
$8.750
|
$4.000
|
$7.500
|
$14.000
|
$15.100
|
$24.250
|
$6.600
|
$16.590
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,240.000
|
$10.000
|
$8.200
|
$8.000
|
$12.000
|
$11.500
|
$18.000
|
$17.950
|
$47.600
|
$6.800
|
$41.470
|
|
|
BACKFILL (TY A OR B)
|
STA
|
244.490
|
$200.000
|
$268.840
|
$140.000
|
$300.000
|
$275.000
|
$350.000
|
$386.500
|
$1,340.000
|
$181.200
|
$182.010
|
|
|
BLADING
|
STA
|
244.490
|
$110.000
|
$208.330
|
$160.000
|
$300.000
|
$36.980
|
$212.000
|
$197.400
|
$235.000
|
$106.200
|
$302.220
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
165,630.000
|
$1.150
|
$0.800
|
$1.050
|
$0.630
|
$0.870
|
$0.690
|
$1.150
|
$0.850
|
$1.800
|
$1.250
|
|
|
BLOCK SODDING
|
SY
|
2,009.000
|
$3.000
|
$3.100
|
$5.150
|
$2.290
|
$6.260
|
$3.100
|
$5.300
|
$5.700
|
$4.200
|
$3.040
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
163,621.000
|
$0.150
|
$0.120
|
$0.120
|
$0.120
|
$0.130
|
$0.120
|
$0.150
|
$0.150
|
$0.200
|
$0.130
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
165,630.000
|
$0.120
|
$0.070
|
$0.070
|
$0.080
|
$0.090
|
$0.070
|
$0.100
|
$0.100
|
$0.200
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
49,278.000
|
$6.000
|
$1.040
|
$0.010
|
$0.010
|
$0.250
|
$0.010
|
$7.000
|
$10.250
|
$33.400
|
$17.770
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
5,000.000
|
$23.000
|
$24.580
|
$25.500
|
$22.000
|
$17.850
|
$23.000
|
$32.350
|
$33.000
|
$39.300
|
$30.990
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
78,789.000
|
$12.000
|
$11.910
|
$12.550
|
$12.000
|
$13.000
|
$17.000
|
$9.400
|
$20.000
|
$13.500
|
$14.110
|
|
|
REWORKING BS MTL (TY C) (14")(ORD COMP)
|
SY
|
59,761.000
|
$7.000
|
$2.000
|
$2.200
|
$3.000
|
$8.880
|
$4.000
|
$4.000
|
$2.000
|
$1.800
|
$2.590
|
|
|
CEMENT
|
TON
|
615.000
|
$144.000
|
$145.000
|
$145.000
|
$150.000
|
$139.000
|
$155.000
|
$140.960
|
$155.000
|
$296.700
|
$213.280
|
|
|
CEMENT TREAT (EXIST MATL) (DC) (9")
|
SY
|
81,491.000
|
$3.500
|
$1.950
|
$1.800
|
$2.000
|
$2.650
|
$3.000
|
$2.950
|
$4.750
|
$2.000
|
$7.110
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
15,753.000
|
$4.000
|
$4.010
|
$3.500
|
$5.400
|
$3.960
|
$3.000
|
$5.350
|
$4.650
|
$5.000
|
$4.680
|
|
|
ASPH (AC-15P)
|
GAL
|
11,033.000
|
$2.500
|
$3.740
|
$3.500
|
$3.100
|
$3.030
|
$4.000
|
$5.700
|
$4.650
|
$3.650
|
$3.450
|
|
|
ASPH (CRS-2P)
|
GAL
|
13,138.000
|
$4.270
|
$4.280
|
$3.000
|
$3.700
|
$3.610
|
$4.000
|
$6.050
|
$4.600
|
$4.350
|
$4.100
|
|
|
ASPH (RC-250)
|
GAL
|
7,355.000
|
$3.500
|
$4.360
|
$3.500
|
$3.900
|
$3.820
|
$4.000
|
$7.900
|
$6.200
|
$4.600
|
$4.340
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
212.000
|
$149.000
|
$123.040
|
$150.000
|
$130.000
|
$117.310
|
$185.000
|
$395.100
|
$383.000
|
$141.500
|
$133.300
|
|
|
AGGR (TY-B GR-3)
|
CY
|
510.000
|
$160.000
|
$121.910
|
$150.000
|
$130.000
|
$117.310
|
$185.000
|
$251.800
|
$405.000
|
$141.500
|
$133.300
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
59,761.000
|
$1.620
|
$3.000
|
$2.300
|
$1.500
|
$1.420
|
$2.720
|
$1.550
|
$1.450
|
$2.000
|
$1.480
|
|
|
CEM STABIL BKFL
|
CY
|
29.100
|
$180.000
|
$250.000
|
$130.000
|
$150.000
|
$187.690
|
$250.000
|
$250.000
|
$178.000
|
$120.200
|
$98.890
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
50.000
|
$100.000
|
$125.000
|
$158.000
|
$150.000
|
$41.710
|
$125.000
|
$125.000
|
$186.000
|
$80.700
|
$122.650
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60.000
|
$1.970
|
$18.000
|
$16.000
|
$30.000
|
$10.430
|
$18.000
|
$18.000
|
$13.000
|
$1.200
|
$29.620
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,664.000
|
$40.000
|
$40.000
|
$53.000
|
$40.000
|
$20.850
|
$60.000
|
$40.000
|
$30.500
|
$11.700
|
$64.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
64.000
|
$450.000
|
$450.000
|
$473.000
|
$525.000
|
$573.510
|
$450.000
|
$450.000
|
$1,060.000
|
$442.400
|
$456.170
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.400
|
$500.000
|
$500.000
|
$499.000
|
$880.000
|
$599.580
|
$500.000
|
$500.000
|
$1,325.000
|
$961.500
|
$468.020
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
54.500
|
$200.000
|
$200.000
|
$106.000
|
$275.000
|
$208.550
|
$246.000
|
$373.800
|
$238.000
|
$201.600
|
$329.870
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$480.000
|
$450.000
|
$578.000
|
$575.000
|
$547.440
|
$450.000
|
$450.000
|
$653.000
|
$309.000
|
$503.570
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
94.000
|
$750.000
|
$700.000
|
$631.000
|
$486.200
|
$625.650
|
$700.000
|
$700.000
|
$785.000
|
$531.300
|
$1,276.750
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,166.000
|
$60.000
|
$42.000
|
$48.000
|
$60.000
|
$45.880
|
$42.000
|
$42.000
|
$47.000
|
$132.700
|
$50.400
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
819.000
|
$70.000
|
$55.000
|
$93.000
|
$75.000
|
$62.560
|
$55.000
|
$55.000
|
$64.000
|
$149.600
|
$77.300
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$150.000
|
$85.000
|
$132.000
|
$100.000
|
$87.590
|
$85.000
|
$85.000
|
$90.000
|
$217.800
|
$111.400
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
122.000
|
$150.000
|
$125.000
|
$153.000
|
$135.000
|
$114.700
|
$125.000
|
$125.000
|
$118.000
|
$245.100
|
$156.760
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
64.000
|
$185.000
|
$200.000
|
$211.000
|
$180.000
|
$182.480
|
$200.000
|
$200.000
|
$187.250
|
$333.600
|
$262.070
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,000.000
|
$5,500.000
|
$3,680.000
|
$5,250.000
|
$3,753.880
|
$5,500.000
|
$5,500.000
|
$3,850.000
|
$13,366.700
|
$5,709.840
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$7,500.000
|
$6,500.000
|
$6,850.000
|
$4,730.000
|
$7,924.850
|
$6,500.000
|
$6,500.000
|
$8,135.000
|
$7,178.700
|
$8,069.880
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$11,000.000
|
$9,500.000
|
$19,000.000
|
$7,260.000
|
$11,887.280
|
$9,500.000
|
$9,500.000
|
$12,200.000
|
$9,943.100
|
$11,516.910
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$25,000.000
|
$26,500.000
|
$25,500.000
|
$24,090.000
|
$25,025.850
|
$26,500.000
|
$26,500.000
|
$25,680.000
|
$28,332.300
|
$22,355.340
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
2.000
|
$6,500.000
|
$12,000.000
|
$8,500.000
|
$8,910.000
|
$7,116.730
|
$12,000.000
|
$12,000.000
|
$7,300.000
|
$11,745.900
|
$11,457.160
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
196.000
|
$700.000
|
$625.000
|
$790.000
|
$700.000
|
$860.260
|
$625.000
|
$625.000
|
$883.000
|
$1,274.000
|
$9,864.020
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$800.000
|
$700.000
|
$845.000
|
$600.000
|
$782.060
|
$700.000
|
$700.000
|
$802.500
|
$1,633.900
|
$1,218.310
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$900.000
|
$800.000
|
$845.000
|
$700.000
|
$834.200
|
$800.000
|
$800.000
|
$856.000
|
$1,633.900
|
$2,136.930
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
64.000
|
$1,128.000
|
$950.000
|
$1,000.000
|
$880.000
|
$1,068.810
|
$950.000
|
$950.000
|
$1,100.000
|
$1,634.600
|
$1,651.490
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$2,650.000
|
$1,450.000
|
$1,981.220
|
$2,500.000
|
$2,500.000
|
$2,033.000
|
$2,514.900
|
$2,690.970
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
10.000
|
$3,550.000
|
$4,500.000
|
$3,700.000
|
$3,100.000
|
$4,066.700
|
$4,500.000
|
$4,500.000
|
$4,173.000
|
$5,100.900
|
$3,893.140
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,700.000
|
$1,500.000
|
$2,650.000
|
$1,400.000
|
$1,042.750
|
$1,500.000
|
$1,500.000
|
$1,070.000
|
$3,605.700
|
$3,575.270
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$600.000
|
$1,000.000
|
$790.000
|
$500.000
|
$782.060
|
$1,000.000
|
$1,000.000
|
$802.500
|
$2,489.400
|
$928.410
|
|
|
REMOV STR (SET)
|
EA
|
36.000
|
$250.000
|
$200.000
|
$580.000
|
$250.000
|
$156.410
|
$200.000
|
$200.000
|
$160.500
|
$872.900
|
$632.890
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,350.000
|
$1,000.000
|
$1,600.000
|
$700.000
|
$834.200
|
$1,000.000
|
$1,000.000
|
$856.000
|
$4,936.800
|
$1,540.480
|
|
|
REMOV STR (PIPE)
|
LF
|
3,286.000
|
$12.000
|
$12.000
|
$13.000
|
$15.000
|
$8.340
|
$12.000
|
$12.000
|
$9.000
|
$12.000
|
$21.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$634,570.040
|
$630,162.000
|
$530,000.000
|
$633,000.000
|
$600,000.000
|
$568,000.000
|
$656,800.000
|
$208,800.000
|
$498,000.000
|
$1,125,623.730
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$7,325.000
|
$17,000.000
|
$21,000.000
|
$8,478.020
|
$8,346.000
|
$19,706.000
|
$18,150.000
|
$1,436.700
|
$23,697.340
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,352.000
|
$30.000
|
$28.000
|
$30.000
|
$27.500
|
$26.070
|
$28.000
|
$31.200
|
$35.000
|
$29.500
|
$36.490
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,352.000
|
$8.000
|
$6.000
|
$3.500
|
$13.750
|
$6.260
|
$6.000
|
$9.150
|
$10.000
|
$9.600
|
$10.050
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
172.000
|
$20.000
|
$20.000
|
$10.000
|
$22.000
|
$20.850
|
$20.000
|
$25.500
|
$27.000
|
$32.000
|
$26.380
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
172.000
|
$7.500
|
$6.000
|
$2.000
|
$11.000
|
$10.430
|
$6.000
|
$8.450
|
$9.000
|
$8.400
|
$10.030
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,720.000
|
$2.250
|
$2.150
|
$2.000
|
$1.540
|
$2.290
|
$2.150
|
$2.000
|
$2.500
|
$2.100
|
$2.910
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,962.000
|
$0.500
|
$0.500
|
$0.750
|
$0.110
|
$0.520
|
$0.500
|
$0.600
|
$0.650
|
$0.600
|
$0.810
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,278.000
|
$3.350
|
$4.000
|
$3.000
|
$3.250
|
$5.210
|
$4.000
|
$3.000
|
$4.250
|
$7.900
|
$5.270
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,278.000
|
$0.660
|
$1.000
|
$0.900
|
$1.100
|
$1.040
|
$1.000
|
$0.600
|
$0.650
|
$3.900
|
$1.620
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
242.000
|
$7.000
|
$3.000
|
$4.750
|
$6.600
|
$10.430
|
$3.000
|
$8.000
|
$8.500
|
$11.000
|
$6.970
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,603.000
|
$70.000
|
$95.000
|
$110.000
|
$95.000
|
$92.000
|
$110.000
|
$95.000
|
$65.000
|
$84.700
|
$77.020
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,834.000
|
$40.000
|
$44.780
|
$53.500
|
$38.100
|
$53.000
|
$48.500
|
$45.500
|
$33.000
|
$49.500
|
$67.540
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
49,272.000
|
$0.200
|
$0.290
|
$0.200
|
$0.300
|
$0.260
|
$0.350
|
$0.300
|
$0.150
|
$2.400
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
24,536.000
|
$0.200
|
$0.290
|
$0.200
|
$0.300
|
$0.260
|
$0.350
|
$0.300
|
$0.150
|
$2.400
|
$0.120
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
31,800.000
|
$0.750
|
$1.480
|
$1.350
|
$1.500
|
$1.350
|
$1.490
|
$1.450
|
$0.650
|
$4.800
|
$0.710
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
100.000
|
$20.000
|
$28.000
|
$30.000
|
$31.900
|
$29.200
|
$28.000
|
$35.000
|
$38.500
|
$33.700
|
$34.360
|
|
|
SHORT RADIUS
|
LF
|
36.000
|
$35.000
|
$20.000
|
$22.000
|
$36.300
|
$20.860
|
$20.000
|
$50.000
|
$48.000
|
$24.000
|
$39.100
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$812.000
|
$450.000
|
$475.000
|
$907.500
|
$469.240
|
$450.000
|
$1,000.000
|
$835.000
|
$540.900
|
$977.520
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,171.000
|
$2.600
|
$1.750
|
$1.850
|
$2.480
|
$1.820
|
$1.750
|
$3.000
|
$3.250
|
$2.100
|
$2.670
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$280.000
|
$125.000
|
$132.000
|
$247.500
|
$130.350
|
$125.000
|
$300.000
|
$375.000
|
$150.200
|
$266.600
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,600.000
|
$2,400.000
|
$2,550.000
|
$2,750.000
|
$2,502.590
|
$2,400.000
|
$2,850.000
|
$2,975.000
|
$2,884.600
|
$2,962.170
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
69.000
|
$205.000
|
$220.000
|
$240.000
|
$214.500
|
$203.340
|
$300.000
|
$220.000
|
$240.000
|
$420.700
|
$231.050
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$500.000
|
$445.000
|
$585.000
|
$530.200
|
$502.600
|
$500.000
|
$445.000
|
$600.000
|
$480.800
|
$571.110
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$700.000
|
$605.000
|
$662.000
|
$653.400
|
$619.390
|
$700.000
|
$605.000
|
$675.000
|
$480.800
|
$703.810
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
7.000
|
$1,000.000
|
$820.000
|
$920.000
|
$865.700
|
$820.640
|
$950.000
|
$820.000
|
$936.000
|
$480.800
|
$932.490
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$952.000
|
$920.000
|
$1,135.000
|
$993.300
|
$941.600
|
$1,200.000
|
$920.000
|
$1,155.000
|
$480.800
|
$1,069.930
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$952.000
|
$1,000.000
|
$981.000
|
$1,016.400
|
$963.500
|
$1,400.000
|
$1,000.000
|
$1,000.000
|
$480.800
|
$1,094.820
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
13.000
|
$53.000
|
$45.000
|
$69.000
|
$61.600
|
$58.390
|
$27.000
|
$45.000
|
$70.000
|
$480.800
|
$66.350
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$30.000
|
$33.000
|
$35.000
|
$22.000
|
$20.860
|
$33.000
|
$25.000
|
$25.000
|
$480.800
|
$23.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
12,406.000
|
$0.300
|
$0.750
|
$0.760
|
$1.500
|
$0.780
|
$0.750
|
$0.750
|
$1.000
|
$0.800
|
$0.830
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,060.000
|
$1.190
|
$2.250
|
$0.500
|
$1.750
|
$0.930
|
$3.000
|
$1.000
|
$1.750
|
$1.000
|
$0.870
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
195.000
|
$6.000
|
$36.000
|
$6.510
|
$39.600
|
$37.540
|
$36.000
|
$36.000
|
$38.500
|
$7.200
|
$7.110
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
49,272.000
|
$0.300
|
$0.450
|
$0.460
|
$0.500
|
$0.470
|
$0.450
|
$0.450
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,971.000
|
$0.300
|
$0.470
|
$0.650
|
$0.520
|
$0.490
|
$0.470
|
$0.500
|
$0.500
|
$0.700
|
$0.710
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
21,272.000
|
$0.400
|
$0.470
|
$0.460
|
$0.520
|
$0.490
|
$0.470
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
332,505.000
|
$0.600
|
$0.780
|
$0.580
|
$0.750
|
$0.710
|
$0.680
|
$0.680
|
$0.750
|
$0.600
|
$0.630
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
581.000
|
$2.750
|
$5.500
|
$3.800
|
$6.050
|
$5.740
|
$5.500
|
$5.500
|
$6.000
|
$4.200
|
$4.150
|
|
|
FULL - WIDTH MOWING
|
AC
|
34.200
|
$100.000
|
$100.000
|
$110.000
|
$110.000
|
$99.060
|
$100.000
|
$100.000
|
$535.000
|
$180.300
|
$118.490
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
8,375.000
|
$91.000
|
$88.390
|
$91.250
|
$93.000
|
$86.750
|
$87.200
|
$122.200
|
$105.000
|
$108.400
|
$98.640
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$13,000.000
|
$10,000.000
|
$15,000.000
|
$16,500.000
|
$16,000.000
|
$15,350.000
|
$23,650.000
|
$85.500
|
$9,478.940
|
|
|
TMA (STATIONARY)
|
DAY
|
234.000
|
$160.000
|
$250.000
|
$230.000
|
$100.000
|
$263.140
|
$300.000
|
$325.000
|
$150.000
|
$165.900
|
$355.460
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
875.000
|
$60.000
|
$100.000
|
$60.000
|
$10.000
|
$87.580
|
$150.000
|
$80.000
|
$80.000
|
$300.500
|
$177.730
|
|
Totals: |
$7,060,394.700
|
$5,875,116.593
|
$5,979,193.800
|
$6,338,556.620
|
$6,526,989.686
|
$6,672,561.860
|
$7,096,605.561
|
$8,108,976.200
|
$8,834,379.346
|
$11,408,080.838
|