|
|
PREPARING ROW
|
STA
|
164.550
|
$500.000
|
$200.000
|
$850.000
|
$675.000
|
$1,100.000
|
$1,000.000
|
$445.000
|
$100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,188.000
|
$14.000
|
$25.000
|
$19.000
|
$18.500
|
$17.000
|
$20.000
|
$21.600
|
$24.090
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
1,042.000
|
$5.000
|
$9.000
|
$8.500
|
$15.000
|
$10.250
|
$20.000
|
$10.800
|
$1.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
7,125.000
|
$7.000
|
$12.000
|
$9.000
|
$12.000
|
$11.500
|
$20.000
|
$20.900
|
$13.650
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,640.000
|
$18.000
|
$12.000
|
$14.000
|
$34.500
|
$12.000
|
$20.000
|
$12.230
|
$18.900
|
|
|
BLADING
|
STA
|
164.550
|
$110.000
|
$140.000
|
$177.000
|
$115.000
|
$260.000
|
$150.000
|
$111.020
|
$1,365.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
14,655.000
|
$0.360
|
$0.480
|
$0.560
|
$0.700
|
$0.550
|
$0.600
|
$0.570
|
$0.560
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
14,655.000
|
$0.150
|
$0.400
|
$0.180
|
$0.300
|
$0.370
|
$0.250
|
$0.180
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
469.000
|
$15.000
|
$34.500
|
$30.000
|
$59.000
|
$51.000
|
$25.000
|
$44.230
|
$25.380
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
8,927.000
|
$66.000
|
$68.000
|
$66.000
|
$70.000
|
$79.000
|
$70.000
|
$94.000
|
$73.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
6,149.000
|
$75.000
|
$72.000
|
$69.000
|
$78.000
|
$84.000
|
$70.000
|
$99.370
|
$74.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
1,330.000
|
$64.000
|
$80.000
|
$54.000
|
$71.250
|
$83.000
|
$70.000
|
$67.650
|
$76.140
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
38,038.000
|
$2.000
|
$1.450
|
$1.650
|
$1.750
|
$1.120
|
$3.000
|
$1.180
|
$3.630
|
|
|
CEM STABIL BKFL
|
CY
|
176.000
|
$68.000
|
$120.000
|
$140.000
|
$121.000
|
$170.000
|
$60.000
|
$297.000
|
$367.370
|
|
|
CUT & RESTORING PAV
|
SY
|
117.000
|
$81.000
|
$147.000
|
$90.000
|
$155.000
|
$68.000
|
$175.000
|
$162.000
|
$244.070
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
148.000
|
$2.500
|
$15.000
|
$8.000
|
$1.350
|
$11.350
|
$3.500
|
$21.600
|
$29.050
|
|
|
TEMPORARY SPL SHORING
|
SF
|
880.000
|
$11.500
|
$90.000
|
$70.000
|
$25.750
|
$58.000
|
$45.000
|
$54.000
|
$65.700
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
29.000
|
$480.000
|
$480.000
|
$395.000
|
$625.000
|
$825.000
|
$550.000
|
$486.000
|
$502.340
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
111.440
|
$170.000
|
$145.000
|
$231.000
|
$168.000
|
$210.000
|
$185.000
|
$290.200
|
$153.370
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
14.000
|
$500.000
|
$590.000
|
$1,025.000
|
$835.000
|
$820.000
|
$550.000
|
$513.000
|
$1,256.190
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
40.000
|
$628.000
|
$665.000
|
$610.000
|
$1,130.000
|
$795.000
|
$1,000.000
|
$972.000
|
$994.300
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
14.000
|
$920.000
|
$700.000
|
$745.000
|
$1,815.000
|
$840.000
|
$1,800.000
|
$1,080.000
|
$1,137.120
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
12.000
|
$1,000.000
|
$775.000
|
$1,550.000
|
$2,415.000
|
$895.000
|
$1,650.000
|
$1,296.000
|
$1,137.100
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,070.000
|
$60.000
|
$55.000
|
$59.000
|
$58.000
|
$67.000
|
$50.000
|
$59.400
|
$45.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
142.000
|
$64.000
|
$75.000
|
$73.000
|
$120.000
|
$89.000
|
$60.000
|
$70.200
|
$60.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$82.000
|
$100.000
|
$92.000
|
$180.000
|
$114.000
|
$105.000
|
$108.000
|
$75.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
538.000
|
$110.000
|
$140.000
|
$121.000
|
$125.000
|
$148.000
|
$125.000
|
$118.800
|
$110.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
4.000
|
$4,700.000
|
$7,800.000
|
$6,700.000
|
$10,000.000
|
$6,200.000
|
$7,000.000
|
$8,100.000
|
$6,663.960
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
1.000
|
$19,000.000
|
$17,500.000
|
$31,000.000
|
$12,500.000
|
$16,800.000
|
$20,000.000
|
$19,440.000
|
$14,964.360
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$43,000.000
|
$28,000.000
|
$21,500.000
|
$15,000.000
|
$28,150.000
|
$35,000.000
|
$27,000.000
|
$24,904.860
|
|
|
SET (TY I)(S=10 FT)(HW=7FT)(3:1)(C)
|
EA
|
2.000
|
$18,500.000
|
$13,000.000
|
$20,750.000
|
$14,000.000
|
$14,250.000
|
$25,000.000
|
$21,600.000
|
$15,704.560
|
|
|
SET (TY I)(S=10 FT)(HW=8FT)(3:1)(C)
|
EA
|
1.000
|
$35,800.000
|
$15,000.000
|
$30,250.000
|
$14,500.000
|
$11,900.000
|
$38,500.000
|
$23,760.000
|
$23,530.110
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
48.000
|
$720.000
|
$700.000
|
$710.000
|
$1,000.000
|
$822.000
|
$850.000
|
$594.000
|
$630.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
8.000
|
$1,800.000
|
$850.000
|
$800.000
|
$1,250.000
|
$908.000
|
$1,250.000
|
$810.000
|
$940.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,663.000
|
$1,500.000
|
$1,200.000
|
$2,250.000
|
$1,155.000
|
$1,500.000
|
$1,296.000
|
$1,470.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$2,370.000
|
$3,000.000
|
$1,700.000
|
$2,350.000
|
$2,100.000
|
$2,500.000
|
$2,700.000
|
$2,250.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (P)
|
EA
|
8.000
|
$3,450.000
|
$3,000.000
|
$1,900.000
|
$3,050.000
|
$2,400.000
|
$3,000.000
|
$2,700.000
|
$2,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
$6,500.000
|
$3,615.000
|
$1,365.000
|
$1,500.000
|
$1,620.000
|
$2,100.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$713.000
|
$500.000
|
$520.000
|
$1,140.000
|
$855.000
|
$1,500.000
|
$1,080.000
|
$525.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$1,020.000
|
$500.000
|
$1,000.000
|
$2,350.000
|
$1,720.000
|
$2,500.000
|
$1,080.000
|
$1,575.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,690.000
|
$16.000
|
$10.000
|
$13.000
|
$15.000
|
$9.100
|
$30.000
|
$21.600
|
$21.000
|
|
|
REMOVE STR (GABION)
|
LF
|
30.000
|
$25.000
|
$50.000
|
$27.000
|
$140.000
|
$345.000
|
$100.000
|
$189.960
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$242,000.000
|
$242,000.000
|
$270,000.000
|
$280,000.000
|
$304,005.000
|
$300,000.000
|
$242,000.000
|
$333,333.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$9,000.000
|
$5,000.000
|
$8,500.000
|
$7,000.000
|
$19,000.000
|
$12,500.000
|
$4,500.000
|
$31,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$33.000
|
$27.080
|
$25.500
|
$45.000
|
$33.000
|
$30.000
|
$26.460
|
$25.910
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$8.000
|
$9.000
|
$10.500
|
$13.000
|
$8.000
|
$15.000
|
$10.800
|
$10.580
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
155.600
|
$25.000
|
$23.740
|
$20.250
|
$30.000
|
$13.600
|
$45.000
|
$20.790
|
$20.360
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
155.600
|
$8.000
|
$9.000
|
$10.500
|
$12.000
|
$8.000
|
$20.000
|
$10.800
|
$10.580
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
340.000
|
$5.000
|
$4.850
|
$4.150
|
$5.000
|
$4.700
|
$12.000
|
$4.270
|
$4.180
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
340.000
|
$1.600
|
$1.500
|
$1.050
|
$1.250
|
$1.280
|
$8.000
|
$1.080
|
$1.060
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$31.500
|
$45.000
|
$17.000
|
$75.000
|
$66.000
|
$65.000
|
$81.640
|
$48.930
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,320.000
|
$5.500
|
$30.000
|
$13.000
|
$18.000
|
$15.000
|
$20.000
|
$17.840
|
$9.950
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$8.000
|
$15.000
|
$12.000
|
$9.500
|
$18.000
|
$20.000
|
$35.170
|
$20.830
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,901.000
|
$25.000
|
$17.000
|
$15.250
|
$40.000
|
$25.000
|
$15.000
|
$18.370
|
$19.630
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,188.000
|
$74.500
|
$78.000
|
$65.000
|
$122.000
|
$93.000
|
$85.000
|
$108.000
|
$73.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,042.000
|
$40.000
|
$17.000
|
$14.500
|
$58.500
|
$30.000
|
$15.000
|
$16.850
|
$20.860
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
622.000
|
$18.000
|
$17.000
|
$20.000
|
$22.500
|
$17.150
|
$20.000
|
$19.440
|
$21.150
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
25.000
|
$21.000
|
$22.000
|
$36.500
|
$32.000
|
$22.250
|
$40.000
|
$27.000
|
$63.450
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$2.500
|
$4.000
|
$3.150
|
$4.000
|
$4.150
|
$3.000
|
$3.240
|
$3.170
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,185.000
|
$3,600.000
|
$2,625.000
|
$2,600.000
|
$2,185.000
|
$2,500.000
|
$2,187.000
|
$2,374.090
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,600.000
|
$7,900.000
|
$8,300.000
|
$8,200.000
|
$8,000.000
|
$15,000.000
|
$8,640.000
|
$9,450.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,750.000
|
$1,475.000
|
$1,410.000
|
$1,600.000
|
$1,500.000
|
$5,000.000
|
$2,700.000
|
$1,203.280
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$775.000
|
$705.000
|
$935.000
|
$892.357
|
$2,500.000
|
$540.000
|
$1,203.280
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
8.000
|
$225.000
|
$210.000
|
$220.000
|
$385.000
|
$210.000
|
$650.000
|
$324.000
|
$253.800
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
27.000
|
$470.000
|
$425.000
|
$446.000
|
$611.000
|
$484.000
|
$650.000
|
$513.000
|
$481.160
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$600.000
|
$555.000
|
$583.000
|
$700.000
|
$595.000
|
$650.000
|
$648.000
|
$660.940
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$580.000
|
$605.000
|
$635.000
|
$1,095.000
|
$633.000
|
$650.000
|
$918.000
|
$687.380
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$740.000
|
$745.000
|
$783.000
|
$1,150.000
|
$785.000
|
$650.000
|
$972.000
|
$819.560
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$900.000
|
$950.000
|
$998.000
|
$1,250.000
|
$933.000
|
$650.000
|
$1,053.000
|
$946.460
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
20.000
|
$51.000
|
$45.000
|
$47.000
|
$51.500
|
$59.000
|
$100.000
|
$43.200
|
$50.760
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF(BI)
|
EA
|
12.000
|
$120.000
|
$60.000
|
$63.000
|
$70.770
|
$76.000
|
$100.000
|
$59.400
|
$63.450
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
10.000
|
$57.000
|
$55.000
|
$58.000
|
$45.000
|
$76.000
|
$100.000
|
$59.400
|
$50.760
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$25.000
|
$26.000
|
$22.000
|
$26.250
|
$100.000
|
$59.400
|
$21.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,417.000
|
$0.350
|
$0.670
|
$0.470
|
$0.350
|
$0.310
|
$1.000
|
$0.320
|
$0.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,631.000
|
$1.400
|
$0.500
|
$0.750
|
$1.500
|
$1.010
|
$5.000
|
$1.590
|
$3.220
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,377.000
|
$0.800
|
$1.500
|
$1.570
|
$1.000
|
$0.820
|
$2.000
|
$0.860
|
$0.850
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
207.000
|
$6.000
|
$10.000
|
$10.500
|
$7.500
|
$5.960
|
$10.000
|
$6.370
|
$6.240
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
10.000
|
$130.000
|
$125.000
|
$131.000
|
$150.000
|
$104.000
|
$150.000
|
$111.240
|
$108.920
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
10.000
|
$156.000
|
$125.000
|
$131.000
|
$170.000
|
$126.000
|
$150.000
|
$133.920
|
$131.130
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
689.000
|
$4.500
|
$3.500
|
$3.650
|
$3.750
|
$2.960
|
$4.000
|
$3.130
|
$3.070
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,172.000
|
$0.320
|
$0.400
|
$0.420
|
$0.350
|
$0.350
|
$0.500
|
$0.360
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,382.000
|
$0.350
|
$0.450
|
$0.470
|
$0.350
|
$0.360
|
$0.500
|
$0.380
|
$0.370
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,378.000
|
$0.330
|
$0.400
|
$0.420
|
$0.350
|
$0.340
|
$0.500
|
$0.360
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
77.000
|
$3.000
|
$4.000
|
$4.200
|
$3.000
|
$3.050
|
$15.000
|
$3.240
|
$3.170
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
861.000
|
$3.000
|
$4.000
|
$4.200
|
$3.150
|
$3.050
|
$15.000
|
$3.240
|
$3.170
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$19,500.000
|
$15,000.000
|
$10,000.000
|
$14,330.000
|
$15,500.000
|
$25,399.790
|
$19,029.960
|
|
Totals: |
$2,660,546.080
|
$2,697,083.134
|
$2,741,608.960
|
$3,139,273.710
|
$3,215,119.304
|
$3,225,654.650
|
$3,297,130.793
|
$3,349,701.217
|