|
|
EXCAVATION (ROADWAY)
|
CY
|
900.000
|
$35.000
|
$21.500
|
$21.650
|
$25.000
|
$19.000
|
$20.000
|
$23.450
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
83.000
|
$20.000
|
$70.500
|
$58.390
|
$60.000
|
$80.000
|
$170.000
|
$73.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
323.000
|
$600.000
|
$745.000
|
$504.840
|
$1,000.000
|
$750.000
|
$700.000
|
$845.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
578.000
|
$160.000
|
$430.000
|
$177.610
|
$240.000
|
$250.000
|
$300.000
|
$345.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
26.700
|
$450.000
|
$310.000
|
$671.020
|
$312.120
|
$300.000
|
$289.000
|
$320.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
26.700
|
$380.000
|
$310.000
|
$566.300
|
$312.120
|
$300.000
|
$289.000
|
$320.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,174.000
|
$20.000
|
$24.500
|
$37.350
|
$17.160
|
$20.000
|
$31.980
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TY A OR B GR 5)(10")
|
SY
|
46,795.000
|
$20.000
|
$32.000
|
$24.450
|
$28.000
|
$19.000
|
$25.000
|
$32.500
|
|
|
CEMENT
|
TON
|
759.000
|
$180.000
|
$195.000
|
$199.210
|
$195.000
|
$200.000
|
$175.000
|
$185.000
|
|
|
CEMENT TREAT (EXIST MATL) (DC) (9")
|
SY
|
51,513.000
|
$4.000
|
$3.400
|
$2.190
|
$3.800
|
$5.000
|
$4.500
|
$4.250
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,027.000
|
$4.200
|
$4.400
|
$5.070
|
$5.000
|
$4.900
|
$9.000
|
$4.300
|
|
|
ASPH (CRS-2P)
|
GAL
|
22,564.000
|
$4.000
|
$4.050
|
$4.050
|
$3.700
|
$3.700
|
$4.500
|
$4.050
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
401.000
|
$185.000
|
$135.000
|
$200.390
|
$215.000
|
$140.000
|
$120.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
4,899.000
|
$2.250
|
$4.950
|
$4.080
|
$2.810
|
$3.000
|
$5.600
|
$4.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,440.000
|
$3.000
|
$3.500
|
$3.910
|
$2.810
|
$3.000
|
$9.250
|
$5.350
|
|
|
PLANE ASPH CONC PAV(4.5")
|
SY
|
51,513.000
|
$2.500
|
$3.050
|
$2.460
|
$2.700
|
$3.500
|
$5.250
|
$5.800
|
|
|
PLANE ASPH CONC PAV (2"-5")
|
SY
|
2,958.000
|
$4.000
|
$6.300
|
$4.450
|
$3.020
|
$3.500
|
$6.530
|
$5.600
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
70.000
|
$250.000
|
$430.000
|
$467.120
|
$432.000
|
$450.000
|
$400.000
|
$445.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
7.000
|
$800.000
|
$1,100.000
|
$1,167.810
|
$1,114.000
|
$1,100.000
|
$750.000
|
$1,110.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
12.000
|
$500.000
|
$805.000
|
$465.960
|
$835.500
|
$787.500
|
$399.000
|
$610.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$500.000
|
$860.000
|
$543.030
|
$891.200
|
$840.000
|
$465.000
|
$765.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
38.000
|
$500.000
|
$915.000
|
$543.030
|
$946.900
|
$892.500
|
$465.000
|
$675.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$525.000
|
$970.000
|
$618.360
|
$1,002.600
|
$945.000
|
$529.500
|
$755.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$600.000
|
$1,300.000
|
$691.050
|
$1,336.810
|
$1,260.000
|
$591.750
|
$755.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$35,000.000
|
$100,000.000
|
$137,801.760
|
$105,830.480
|
$99,750.000
|
$118,000.000
|
$133,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$15,000.000
|
$11,000.000
|
$14,364.080
|
$11,140.050
|
$10,500.000
|
$12,300.000
|
$15,650.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$14,000.000
|
$20,000.000
|
$28,027.480
|
$20,609.090
|
$19,425.000
|
$24,000.000
|
$28,600.000
|
|
|
SET (TY I)(S=3 FT)(HW= 6 FT)(4:1)(C)
|
EA
|
1.000
|
$6,200.000
|
$9,100.000
|
$40,873.400
|
$9,469.040
|
$8,925.000
|
$35,000.000
|
$40,825.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$8,600.000
|
$16,349.360
|
$8,912.040
|
$8,400.000
|
$14,000.000
|
$17,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$9,500.000
|
$13,000.000
|
$24,932.780
|
$13,368.060
|
$12,600.000
|
$21,350.000
|
$25,675.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$2,500.000
|
$2,700.000
|
$4,671.250
|
$2,785.010
|
$2,625.000
|
$4,000.000
|
$4,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,097,575.000
|
$1,000,000.000
|
$1,049,162.320
|
$588,921.070
|
$1,100,000.000
|
$1,255,000.000
|
$1,374,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$11,800.000
|
$16,000.000
|
$25,000.000
|
$9,732.890
|
$12,000.000
|
$20,000.000
|
$13,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
220.000
|
$5.000
|
$7.950
|
$3.990
|
$7.990
|
$8.000
|
$29.000
|
$8.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
109,128.000
|
$0.110
|
$0.120
|
$0.200
|
$0.300
|
$0.140
|
$0.190
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
53,664.000
|
$0.110
|
$0.170
|
$0.160
|
$0.320
|
$0.140
|
$0.250
|
$0.400
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$30.000
|
$31.000
|
$33.570
|
$31.050
|
$31.000
|
$28.750
|
$31.900
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$3,000.000
|
$2,802.750
|
$2,592.000
|
$2,600.000
|
$2,400.000
|
$2,665.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$5.000
|
$13.000
|
$3.500
|
$3.240
|
$13.000
|
$3.000
|
$3.350
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$390.000
|
$645.000
|
$350.340
|
$324.000
|
$650.000
|
$300.000
|
$335.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$3,000.000
|
$3,503.430
|
$3,240.000
|
$3,000.000
|
$3,000.000
|
$3,330.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$645.000
|
$350.340
|
$324.000
|
$650.000
|
$300.000
|
$335.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
1.000
|
$280.000
|
$270.000
|
$408.730
|
$378.000
|
$550.000
|
$350.000
|
$390.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
5.000
|
$3,600.000
|
$4,700.000
|
$5,138.370
|
$4,752.000
|
$4,600.000
|
$4,400.000
|
$4,885.000
|
|
|
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
|
EA
|
2.000
|
$5,000.000
|
$6,200.000
|
$6,714.920
|
$6,210.000
|
$6,000.000
|
$5,750.000
|
$6,385.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,724.000
|
$8.000
|
$6.450
|
$7.010
|
$6.480
|
$7.000
|
$6.000
|
$6.650
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
609.000
|
$30.000
|
$32.500
|
$35.030
|
$32.400
|
$32.000
|
$30.000
|
$33.300
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
2,333.000
|
$2.000
|
$1.600
|
$1.750
|
$1.620
|
$1.600
|
$1.500
|
$1.650
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,666.000
|
$2.100
|
$1.400
|
$1.520
|
$1.400
|
$1.400
|
$1.300
|
$1.450
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$1,000.000
|
$1,200.000
|
$1,284.590
|
$1,188.000
|
$1,200.000
|
$1,100.000
|
$1,220.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$220.000
|
$215.000
|
$233.560
|
$216.000
|
$220.000
|
$200.000
|
$225.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,800.000
|
$8,100.000
|
$8,758.590
|
$8,100.000
|
$7,800.000
|
$7,500.000
|
$8,325.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$850.000
|
$650.000
|
$905.050
|
$837.000
|
$840.000
|
$775.000
|
$860.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$900.000
|
$750.000
|
$1,033.510
|
$955.800
|
$892.500
|
$885.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$900.000
|
$1,342.980
|
$1,242.000
|
$1,260.000
|
$1,150.000
|
$1,275.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
11.000
|
$600.000
|
$650.000
|
$846.660
|
$783.000
|
$525.000
|
$725.000
|
$805.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$500.000
|
$600.000
|
$992.640
|
$918.000
|
$525.000
|
$850.000
|
$945.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
11.000
|
$30.000
|
$40.000
|
$11.680
|
$10.800
|
$26.250
|
$10.000
|
$11.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,311.000
|
$1.000
|
$1.100
|
$2.340
|
$0.930
|
$1.000
|
$4.000
|
$1.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,979.000
|
$1.000
|
$1.100
|
$2.340
|
$0.930
|
$1.000
|
$4.000
|
$1.250
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
450.000
|
$1.200
|
$1.100
|
$0.480
|
$0.440
|
$0.430
|
$0.410
|
$0.460
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
8.000
|
$340.000
|
$270.000
|
$875.860
|
$810.000
|
$787.500
|
$750.000
|
$835.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
71,870.000
|
$0.150
|
$0.150
|
$0.210
|
$0.190
|
$0.190
|
$0.180
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
10,369.000
|
$0.450
|
$0.390
|
$0.480
|
$0.440
|
$0.430
|
$0.410
|
$0.460
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
114,700.000
|
$0.350
|
$0.390
|
$0.470
|
$0.430
|
$0.420
|
$0.400
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,289.000
|
$0.350
|
$0.390
|
$0.480
|
$0.440
|
$0.430
|
$0.410
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
70,421.000
|
$0.450
|
$0.390
|
$0.470
|
$0.430
|
$0.420
|
$0.400
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
235.000
|
$3.250
|
$3.250
|
$3.500
|
$3.240
|
$3.150
|
$3.000
|
$3.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
950.000
|
$4.000
|
$3.250
|
$3.500
|
$3.240
|
$3.150
|
$3.000
|
$3.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
35,935.000
|
$1.200
|
$0.540
|
$0.880
|
$0.810
|
$0.790
|
$0.750
|
$0.850
|
|
|
D-GR HMA TY-B SAC-A PG76-22
|
TON
|
12,750.000
|
$110.000
|
$90.000
|
$95.860
|
$107.210
|
$110.000
|
$100.000
|
$115.000
|
|
|
D-GR HMA TY-D SAC-A PG76-28
|
TON
|
54,230.000
|
$105.000
|
$94.000
|
$101.600
|
$111.590
|
$115.000
|
$115.000
|
$122.250
|
|
|
TACK COAT
|
GAL
|
51,504.000
|
$2.000
|
$3.900
|
$3.480
|
$3.500
|
$3.600
|
$3.750
|
$4.500
|
|
|
TMA (STATIONARY)
|
DAY
|
80.000
|
$300.000
|
$260.000
|
$374.080
|
$390.920
|
$350.000
|
$1,600.000
|
$800.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
72.000
|
$95.000
|
$110.000
|
$85.020
|
$69.630
|
$100.000
|
$150.000
|
$80.000
|
|
Totals: |
$11,075,529.270
|
$11,250,760.600
|
$11,502,134.334
|
$11,778,421.518
|
$12,068,968.790
|
$12,854,469.660
|
$13,884,714.670
|